Surface Treatment of Countyline Road Alachua County Board of County Commissioners September 23, 2008.

Slides:



Advertisements
Similar presentations
Library System Funding & Capital Projects Budget Issues Workshop February 21, 2012.
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Investigation of methodologies to control dust on county roads in western North Dakota.
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
Equipment Fleet Management Maximizing your fleet performance at least cost. County Road Administration Board.
Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
Comparative Analysis of Emulsion and Hot Asphalt Cement Chip Seal Performance Douglas D. Gransberg, P.E., C.C.E. University of Oklahoma.
Comal County Chip Sealing June 26, 2007.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
Meade County Experience with Alternatives to Paving Ken McGirr Meade County Highway Supt Sturgis, SD.
Revenue Options Group Identify a Sustainable Sources of Revenue for Infrastructure August 11, 2014.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Chapter 9 Pricing the Work. Introduction Non-computer estimates are priced in two stages: –Stage one: Prepare a recap by sorting and listing all takeoff.
Florida Virtual School: Dori Slosberg Funding
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Western Stabilization Presents: Soil Stabilization Presented by: Barry Berggren Stabilization Division Mgr.
Fiscal Year 2009 Rate Adjustments Presentation to FPUA Board 1 March 3, 2009.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Public Hearing on the 2009 Skagit County Budget December 2, 2008.
Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project.
Board of County Commissioners May 8, Authorize staff to prepare a draft ordinance revising Chapter 37 of the Alachua County Code to include specific.
Transit Service for FY12 Presentation to Board of County Commissioners August 9, 2011.
Actual Costs to fix roads at Fort Peck Reservation 2008 National Tribal Transportation Conference November 12, 2008 Oklahoma City, OK.
Public Hearing August 11, :00 pm. On May 3, 2011, the West Bountiful City Council adopted a balanced tentative budget maintaining current service.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Douglas County Road Maintenance Funding June 27, 2011.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
FY12 and FY13 Budget Development Special Board Meeting Alachua County Office of Management and Budget August 30, 2011.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
Recap and Next Steps. 139 people signed in at the April 10, 2013 Transportation Summit 36 speakers at the Summit o 14 speakers with reservations o 22.
Delivering proven solutions to improve your productivity Municipal Customer September, 2011.
Application CPA (Large Scale Map Amendment) A request initiated by the County to amend Future Land Use Map 2030 from Rural/ Agriculture to Preservation.
Liquid Soil Stabilizer & Road Compactor BASE2000 D. C. A. GEOTECHNIC. ENGINEERS TOP2000 Liquid Surface Sealer & Dust Control Base Marketing International.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
John Angiulli Interim Director PUBLIC WORKS DEPARTMENT Citizen Academy October 9 & 16, 2012.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Regional Transit System Level of Service FY 2017 Growth Management Jeffrey Hays, AICP.
Parking on Right-of-Way Options for County Park Landscaping Option Presentation to Alachua County Board of County Commissioners March 24, 2009.
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
UPDATE ON INCLUSIONARY HOUSING ALACHUA COUNTY BOARD OF COUNTY COMMISSIONERS March 24, 2009.
We maintain streets with half the materials budget that we in had Due to inflation, today's dollar buys only half the materials it did in Therefore,
1 Camden County Road & Bridge Department Larry E. Lampe Superintendent This presentation will probably involve audience discussion, which will create action.
People. purpose. performance. Todd County Schools October 30th, 2013.
Bellevue Public Schools Budget Development
Employee Driver’s License History Checks Board of County Commissioners July 10,
ZOX A request for a special exception to allow a Private Animal Shelter within the ‘A’ (Ag) district 8.18 Acres Railroad Ave, High Springs.
ZOX A request for a special exception to allow a Private Animal Shelter within the ‘A’ (Ag) district 8.18 Acres Railroad Ave, High Springs.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
Alabama Asphalt Pavement Association
Town Road Improvement Project Communication Plan
Pavement Preservation Techniques Used in Virginia
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Boulder Junction Town Road Improvement Project
Genesee County Road Commission Use of Transportation Funding
ACP Inspector Certification Homework (oops, not homework) Solutions
Road Improvement Presentation
Roadway Focus Group Update
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT
Participatory Road Program neighborhood meeting Donahoo 174th Street
October 9, 2004 Voting Cards – please pick up your voting cards from Brian, or Ken. Sign for your card. You will have one vote per lot. If you haven’t.
UTILIZING GRINDINGS ON RURAL ROADS:
Stream Crossing Replacement Policy
Presentation transcript:

Surface Treatment of Countyline Road Alachua County Board of County Commissioners September 23, 2008

AC maintained GC maintained

History of Discussion Gilchrist County requests that Alachua County surface treat SW 298 th Street (Countyline Road) using Alachua County crews, materials and equipment August 12 th BoCC Meeting –Staff return to BoCC with recommended funding source for cost of half of Countyline Road Gilchrist County BoCC –Budgeted half of cost of SW 298 th Street (SR 26 to S Countyline – 4.5 miles), about $117,170

Project Cost Materials (per mile)* Base Stabilization – Limerock (3 in lift, 18 ft width) 440 cubic yards x $5.00 /cu. yd $ 2, Chip Seal Surface Treatment (18 ft width) 10,560 sq. yards x $4.05 /sq. yd $ 42, Total Materials $ 44, per mile Equipment & Labor (per mile)* Dump Trucks 63 loads at $51.00 per load (1 hr roundtrip) $ 3, Motor Grader 10 hours at $69.00 per hour $ Steel Wheel Roller 18 hours at $38.00 per hour $ Reclaimer/Excavator 15 hours at $65.00 per hour $ Gradall Excavator 5 hours at $64.00 per hour $ Asphalt Emulsion/ Tack Truck 6 hours at $55.00 per hour $ Aggregate Spreader 6 hours at $55.00 per hour $ Inspection 30 hours at $25.00 per hour $ Total Equipment & Labor $ 7, per mile * Prices as of March 2007 (quoted to Gilchrist County Commission) P ER - MILE C ONSTRUCTION C OST * $ 52, F ULL P ROJECT C ONSTRUCTION C OST * SR 26 to S Countyline (4.5 miles) $ 234,340.00

Funding Options Alachua County’s portion: $117,170 –Transportation Trust Fund Fund balance: $ 1,559,000* Staff recommended funding source –Gas tax reserves Current balance: $ 712,832* Used for emergencies * Amounts current as of September 8, 2008

Staff Recommendation Direct staff to negotiate two interlocal agreements with Gilchrist County 1.Surface treatment of SW 298 th Street Alachua County will surface treat SW 298 th Street (Countyline Road) using Alachua County crews, materials and equipment Alachua and Gilchrist Counties will share the cost 2.Formalize on-going maintenance responsibilities Direct staff to fund Alachua County’s share of cost from Transportation Trust Fund

Surface Treatment of Countyline Road Alachua County Board of County Commissioners September 23, 2008