Research Infrastructures in FP7 Christian Kurrer European Commission, DG RTD EURONS/EURISOL Town Meeting - 19.9.2007.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Research Infrastructures in the European Research Area Presentation NuPECC LRP 2010 Brussels, 9 December 2010 Christian Kurrer European Commission, DG.
Information about the Integrated Infrastructures Initiatives (I3) instrument Daniel Pasini EC, DG Research, Unit B3 – Research Infrastructures EC, Brussels,
Research Infrastructures Content of Call 3 Hervé PERO European Commission, DG RTD Istanbul - 7 th November 2007.
Page 1 Marie Curie Schemes Science is not the whole story! (How to write a successful Marie Curie RTN Proposal) Siobhan Harkin.
Agnès ROBIN, DG for Research & Innovation
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
1 RESEARCH INFRASTRUCTURES Synergy in using FP7 and SFs for the development of Research Infrastructures Warsaw, 13 February 2006 Hervé Pero, European Commission.
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
The New EU Framework Programme for Research and Innovation HORIZON 2020 Judit Fejes Executive Agency of Small and Medium Enterprises (EASME)
“ERA-NET” 24 April Cooperation and coordination of national or regional research and innovation activities (i.e. programmes) FP6 Launch Conference.
Research Infrastructures European Added Value, Strategy & policy Christian Kurrer, European Commission Bonn,
1 1 st Virtual Forum on Global Research Communities Brussels, 12 th July 2007 Mário Campolargo European Commission - DG INFSO Head of Unit “GÉANT and e-Infrastructures”
Research Infrastructures The Research Infrastructures in FP7.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
INCO GTN meeting, Paris, 21/10/2010 Activities of International Cooperation Capacities Programme INCO-LAB & INCO-HOUSE activities Philippe Froissard Deputy.
Sixth Framework Programme INTRODUCTION . Contents Contents of FP6 Instruments in FP6 Financing Budgets Timetable Highlights.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
Research Infrastructures in FP7 On behalf of : Anna Maria Johansson, Hervé Péro European Commission, DG RTD/B3 MarineERA workshop Feb
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
Regional Dimension of the 7th Framework Programme Regions of Knowledge 2008 Calls Camelia DOGARU (DG RTD- B.4)
Research Infrastructures within Christos Profilis European Commission Research Infrastructures March 2007.
1 DG RTD-B ERA: Research Programmes and Capacity Research Infrastructures Unit Maria Theofilatou FP7 Community actions Research Infrastructures of Social.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
Research Infrastructures in FP7 Gerburg Larsen European Commission, DG Research, RTD-B3 EUDET Annual Meeting Palaiseau/FR, 09 October 2007.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
Regions of Knowledge WP and calls for proposals 2008 Warszawa, European Commission DG RTD/B4 Anna Rémond.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 EUDET I3 Kickoff meeting, Desy, Hamburg 15-17/2/2006 Presentation by Stefano Fontana, DG Research.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
An highlight on EU activities on Research Infrastructures Miloš Kuret Ministry of Higher Education, Science and Technology, Slovenia.
Information on Research Infrastructures in FP7 CARE Meeting, Frascati, November 17, 2006 Stefano Fontana, European Commission, DG-RTD.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
October 2005 RTD OMC-NET CALL –More effective national and regional research policies –Provision of additional resources to support trans-national policy.
Leader subcommittee meeting- 26/11/ THE CONTACT POINT OF THE EUROPEAN NETWORK FOR RURAL DEVELOPMENT Main tasks of the Contact Point in relation to.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC.
EPOS - Rome meeting, September 1 EC + ESFRI Recommendations Elisabeth Kohler CNRS-INSU.
DG ResearchEuropean Commission RTD 06/FK/lb 09/2001 Special measures to further improve participation of Newly Associated States (NAS) in FP-5.
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
FP7 – Nov Towards the EU Seventh Framework Programme (FP7) European Commission Research DG.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
Poznan 19 April Kwietnia 2005 Poznan FP6 The Next Calls for 2005 Technology Platforms FP7.
 the creation of an "internal market" in research (free movement of knowledge, researchers and technology)  the restructuring of the European research.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
1 Research Infrastructures in FP6 European Commission - Directorate-General for Research 30/10/2002 Support for Research Infrastructures in FP6 Daniel.
RESEARCH INFRASTRUCTURES IN FP7 General Information G.Guignard EuTuCHe workshop
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
1. Training seminar Bonn, Feb. 3rd, 2009 EuroRIs-Net Transnational Access / Services Special Clauses Integrating Activities Practical Exercise: Financial.
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
DG ResearchEuropean Commission RTD 06/FK/lb 09/2001 Special measures to further improve participation of Newly Associated States (NAS) in FP-5.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
ILIAS-next “ILIAS-next” aims at being the first unified entity in the world to coordinate and structure the Underground Science as a whole “ILIAS-next”
The call FP7-REGPOT in brief
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
Strengthening the foundations of ERA
February
Presentation transcript:

Research Infrastructures in FP7 Christian Kurrer European Commission, DG RTD EURONS/EURISOL Town Meeting

Content of presentation lOverview of FP6 I3 funded projects lResearch infrastructures in FP7 lIntegrating Activities in FP7 lFP7 call 3 outline

EC funding for I3s by area (total budget within FP6: 517 M€) M€ funded projects

Global figures for I3s (DG RTD) Number of expected users: In person (« hands on »): Electronic, freely accessible: Several tens of thousands Remote scientific services: 300 Electronic, with login: research infrastructures, with 346 facilities offering access 623 contractors (~400 independent contractors) Research centres: 50 % Higher education organisations: 43 % Industries: 3 % Others: 4 % 318 M€ for 32 contracts

Main characteristics of an average I3 lAverage number of contractors: 19 of which 7 are offering access lAverage EC contribution: 10 M€  Management: 6%  Networking activities: 20%  Transnational access: 29%  Joint research activities: 45%

Existing Infrastructures Design studies New Infrastructures Construction (preparatory phase; construction phase) FP7 Research Infrastructures in brief Integrating activities e-infrastructures ESFRI Roadmap Policy Development and Programme Implementation

Support to existing Research Infrastructures lIntegrating Activities to promote the coherent use and development of research infrastructures in a given field, implemented through: èA bottom-up approach for proposals open to all fields of science èTargeted approach with topics defined in cooperation with the FP7 thematic areas l[ICT based e-infrastructures in support of scientific research] 580 M€ Calls 3, 6, M€ Calls 1, 2, 4, 5, 6,7

Policy development and Programme implementation lERA-NETs for research infrastructures lStudies, conferences and coordination actions for policy development, including international cooperation lCoordination actions to support emerging needs lNetwork of National Contact Points (NCP) lOther Support actions, as appropriate 65 M€ Calls 1, 2, 3, 5, 6,7

Integrating Activity in FP7 lCollaboration of existing research infrastructures in a given field of science èNormally all major RI’s in Europe in one field èAt least 3 MS or AS lBased on the continuation of the successful FP6 instrument “I3” l3 types of activities obligatory in one project èNetworking Activities èTrans-national Access èJoint Research Activities lProject type: combination of collaborative project + coordination and support actions

Networking Activities lTo foster a culture of co-operation between the research infrastructures and the related scientific communities lForms of activities: èTowards a common long-term strategy : foresight… èTowards good practice: exchange of personnel and visits, standards and quality… èTowards the users: training, feedback, coordination… èTowards virtual research communities: Web-sites, common softwares, databases, data management… èTechnical workshops, forums, working groups and studies…

Trans-national Access and/or Service activities (1) lProvide trans-national access to researchers or research teams to one or more infrastructures among those operated by the participants è"Hands on" access èRemote access: provision of reference material, sample analysis… Remote access to distributed infrastructures: “trans- nationality” will not apply lProvide research infrastructures related services to the scientific community èAccess to scientific services freely available through communication networks, e.g. databases available on the web

Trans-national Access and/or Service activities (2) lSpecific provisions for trans-national access activities are defined in Annex III to the Grant Agreement èAccess costs = unit cost x quantity of access provided èAn estimated unit cost will be specified in Annex I èEC financial contribution will be adjusted in the final financial statement (Form C) based on real UC (will not exceed 20% of costs of providing total access to the installation over the duration of the project) lSpecific provisions for access to services freely available through communication networks are defined in Special Clause 17 èEC financial contribution for access costs will not exceed 20% of operating costs incurred

Joint Research Activities lExplore new fundamental technologies or techniques underpinning the efficient and joint use of the participating research infrastructures To improve the services provided by the infrastructures (in quality and/or quantity) lForms of activities: èInstrumentation / prototype development èDevelopment of methods, protocols, standards… èDevelopment of software, middleware, algorithm; Database creation, upgrade, curation… èDevelopment and curation of samples

New approach for Integrating Activities in FP7 lBottom up approach for all fields of science (as in FP6) lNew: targeted approach to respond to identified strategic needs: ècreating synergies and ensuring consistency with other parts of the Framework Programme, èin important fields currently not well covered, è…

Priority topics for RI’s under the targeted approach lHealth (6) lFood, Agriculture and Biotechnology (4) lInformation and Communication Technologies (3) lNanosciences, Nanotechnologies and Materials (2) lEnergy (5) lEnvironment (4) lTransport (2) lSocio-economic Sciences and Humanities (3)  29 priority topics for RI’s in 8 fields of R&D

FP7 Call 3 outline (1) lFor Integrating Activities and Support to policy development and programme implementation lPublication: 15 November 2007 lClosure: 15 February 2008 lIndicative budget for Integrating Activities: 84.5 M€ (+ 192 M€ from the 2009 budget)  For both bottom up and targeted approach lIndicative budget for Policy dev t : 5 M€ lResults within 4 months after closure date lFirst contracts will come into force before the end of 2008

FP7 Call 3 outline (2) lProcedure for evaluation  remote + panel evaluation l1 Panel organised in 5 thematic sub-panels*  Material sciences and energy  Physics, astronomy  Biomedical and life sciences  Environmental sciences  Social sciences and humanities * Computer and data treatment experts in each sub-panel l2 priority lists

Evaluation Criteria lAll FP7 proposals will be assessed according to 3 criteria:  S/T quality (threshold 3/5)  Implementation (threshold 3/5)  Impact (threshold 3/5) lOverall threshold 10/15 lThose criteria will be further specified in the revised workprogramme and in the respective guides for applicants

Expected size of an Integrating Activity under FP7 lDuration: 4 years max lNumber of contractors: 20 (FP6 average)  Experience shows that a project with more than 20 contractors is difficult to manage  Not all partners need to be contractors lEC contribution:  We expect most of the projects to be in the range of 4 to 6 M€ with a limited number of projects reaching 10 to 15 M€ in justified cases (e.g. facilities serving exceptionally wide and diverse community of users)

60% of I3s are between 3 and 9 M€ with an average of 5,8 M€ 40 % are between 11 and 27 M€ with an average of 15,9 M€ I3 analysis FP6

Useful links FP7 and Capacities Specific Programme Research Infrastructures on CORDIS (FP6) lResearch Infrastructures in Europa lGrant Model Agreement agreement_en.html#standard_ga