WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.

Slides:



Advertisements
Similar presentations
PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.
Advertisements

Status of the draft GTR 65th GRPE, January 2013
WLTP Validation 2 Assessment Criteria WLTP-DTP
Regulation No. 96 Proposal for 03 Series of Amendments GRPE, January 2011 Informal document No. GRPE (61st GRPE, January 2011, agenda item.
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
Institute for Energy and Transport B. Giechaskiel, G. Martini
EPA Clean Diesel Engine Implementation Workshop Shirish Shimpi Cummins Inc. August 6-7, 2003.
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 4 th DTP Meeting Geneva 12 th January 2011 Chris Parkin.
1 The Result of Japan’s Round Robin Engine Test: Measurement of PM and PN 3/30/2009 PMP Informal Meeting National Traffic Safety and Environmental Laboratory.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 5 th DTP Meeting Dubendorf 12 th – 14 th April 2011 Chris Parkin.
Old Annex 2 Reference Fuels moved to new Annex 3 Old Annex 3 Determination of System Equivalence moved to new Annex 9 New is Annex 2 Gear Selection, Shift.
3rd International Conference LUBRICANTS RUSSIA Diesel Particulate Filter Regeneration Strategy and its Influence on Engine Oil Characteristics Luca.
WLTP Test Procedures for Chassis Dynamometer Testing Chris Laroo - U.S. EPA April 14, 2010 WLTP-DTP
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
WIND TUNNEL METHOD Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce CHASSIS DYNO PRESCRIPTION.
2015/9/29 Japan Automobile Research Institute 1 Asian Round Robin Test ~ Interim report ~ 12th WLTP-IWG 29 Sep – 1 Oct 2015 prepared by Japan WLTP-12-32e.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Draft presentation to GRPE Informal document No. GRPE-52-9.
OICA presentation of ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Preliminary results PMP: 1 st.
WLTP 9th DTP Meeting Bern, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
EPA’s 2001-Published Heavy-Duty Diesel PM Test Procedure Changes Matthew Spears EPA’s Office of Transportation & Air Quality.
WLTP gtr Annex 9 Determination of Method Equivalency - Progress Report
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
JRC 30 March Particle Measurement Programme Exploratory work & Validation Exercise (JRC) First Validation Exercise comparisons B. Giechaskiel, G.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
WLTP - Validation Phase 2 (acceptability of the new test procedure)
India’s Comments on EPPR (Part-B2)
PMP IWG Progress Report
EPPR India comments on B1 Text 15th September 2017
PMP IWG Progress Report
PMP IWG Progress Report
PMP Heavy Duty Validation Exercise
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Particle Measurement Programme - Report
Institute for Energy and Transport B. Giechaskiel, G. Martini
76th UNECE GRPE session PMP IWG Progress Report
Improvement of Wind tunnel Measurement Process Status report
77th UNECE GRPE session PMP IWG Progress Report
WLTP DTP PM-PN Subgroup Activity Report
Status of the draft GTR 65th GRPE, January 2013.
Positions on open points WLTP DTP subgroup LabProcICE
PMP IWG Progress Report
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Supplemental Test for Determination of CO2 Emissions under Regional Conditions – EU WLTP. Andreas Eder for the Working Group on the Development.
Lemnos 11/9/03 Comparison of PM exhaust emissions measured at a chassis dynamometer and on-road chasing on a test track.
Lab Process Internal Combustion Engines
Inter-Laboratory Comparison Exercise CPC CALIBRATION
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
PN-PEMS Progress update
Supplemental Test for Determination of CO2 Emissions under Regional Conditions Results from Telco Oct. 30th, 2014 (Iddo, Markus, Helge, Andreas)
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 5/2/2019.
Proposed actions for gtr development
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
PNC and VPR Validation PMP Meeting 30th March 2009
Presentation transcript:

WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin

Outline – Meetings – Closed Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans – Administrative Issues

Outline – Meetings – Closed Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans – Administrative Issues

Subgroup Meeting 10 th Meeting – 8 th July –The following Open Issues were reviewed; Dilution air background correction, Filter media specification, Filter conditioning, PM Microbalance precision, Reference filter weighing, PM calculations, PN during regeneration investigative measurements, VPR minimum penetration efficiency PNC calibration frequency PNC calibration aerosol

Subgroup Meeting –The draft GTR text was reviewed. Updated text reflecting status following the meeting was circulated as document PMPN (and now rev.1).

Outline – Meetings – Closed Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans – Administrative Issues

Closed Issues PM Sampling A9 Dilution air background correction: Dilution air background correction should be made on the basis of a rolling average background measurement. This contrasts with tunnel background correction where the background measured on day of test, following any tunnel pre-conditioning, should be applied. A38 Filter media: References for filter media collection efficiency measurement have been added PM weighing B2 Microbalance precision: 1  g as per GTR 4 agreed B6 Reference filter weighing: Reg 83 provisions on maximum time between sample and reference filter weighing (8 hours) and reference filter weighing acceptance criteria. These are more demanding than GTR 4 provisions.

Issues for Further Work Following 10 th Meeting A38 Filter Media specification: Chairman to seek clarification of flow rate for filter efficiency check B7 PM Calculation: PM small group to provide updated/corrected text and equations C1 Regeneration Experimental Measurements: ACEA and JRC to discuss scope of experimental measurements D4 PNC calibration frequency: TSI to provide text implementing 13 month interval with a requirement to either monitor PNC counting efficiency versus a reference or change PNC wick every 6 months D5 PNC calibration aerosol: clarify whether D 50 requirements should be met before or after k factor is applied

Closed subject to review e.g. due to Validation 2 or DHC conclusions B3 Filter conditioning: minimum of 1 hour conditioning time, unless validation experience suggests longer is necessary D1 VPR solid particle penetration efficiency: 70% minimum penetration requirement at 100nm to supplement existing 50:100nm and 30:100nm pcrf ratio requirements, subject to review based on data from PMP VPR Round Robin

Outline – Meetings – Closed Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans –Administrative Issues

Data To Gather During Validation 2 Experience on PN during DPF regeneration; –To confirm PN measurement system is capable of excluding worst case volatile material during DPF regenerations –CVS and filter face temperatures during regenerations? Dilution tunnel pre-conditioning and background –Is 20 minutes pre-conditioning at 120kph sufficient? –Tunnel PN background levels PM filter conditioning –Minimum conditioning time required

PN During Regeneration Experiments to be conducted during Validation 2 to investigate feasibility of specifying PN measurement during regen Vehicles –Will need regen indicator and inhibitor switch Measure PN before, during and after regeneration Different PN measurement systems –Two systems per lab sampling in parallel Impact of VPR pcrf –Test over range from (one system at high, one at low setting each test) Two tests at each pcrf setting Impact of CVS dilution on nucleation mode particles –Test at max and min CVS dilution DPF fill procedure –Either fast loading on engine dyno or on vehicle loading –Follow R83 advice on fill state stabilisation for pre-regen tests VPR sulphate removal capability –Test with highest sulphur lube oil permitted by OEM and fuel at maximum (10/15mg/kg) sulphur limit

Outline – Meetings – Closed Issues – Open Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans – Administrative Issues

Amendments to GTR Text Document: WLTP-DTP-PMPN rev.1 changes since rev.3 are; List of Symbols & Acronyms - updated to reflect latest changes PM & PN dilution air background – dilution air background measurements should be based on 20 day rolling average measurements. Maximum permissible corrections (in  g/m 3 or #/m 3 ) should be equivalent to 1mg/km or 2x10 9 #/km at flow rate of test PM & PN dilution tunnel background – dilution tunnel background measurements must be made on day of test following any tunnel pre-conditioning. Maximum permissible correction of 1mg/km and 2x10 9 #/km. Tunnel background measurements must be on day of test after any tunnel pre-conditioning PNC Monitoring – requirement to monitor PNC counting efficiency v reference PNC or >2 measurement PNCs added. Alternatively PNC wick may be changed every 6 months PM Calculation – parameter names and subscripts aligned with GTR 4 PM Temperature control – clarified that components may be heated to achieve <52°C sample temperature

Amendments to GTR Text PM sample probe – minimum internal diameter reduced to 8mm in line with GTR 4 PM sampling Particle Transfer Tube – minimum bend radius of 100mm added PM Secondary dilution requirements – secondary air HEPA filtered, injected into transfer tube as close to sample extraction as possible, seconds residence time from point of secondary air injection to filter face, proportionality of sample flow must be maintained, returned flow should not interfere with other samples. PM sampling diagrams updated PM filter spec – test procedure reference and test aerosol added, filter face velocity clarified PN Sampling diagram – corrected to show LEPA filter in correct place

Outline – Meetings – Closed Issues – Open Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans – Administrative Issues

Future Plans –Confirm latest changes to GTR text –Commence updating PN calibration guidance documents –Review data from Validation 2 on; tunnel background, tunnel pre-conditioning, Minimum filter conditioning time, Measurement of PN during regeneration –Review data from PMP VPR Round Robin on; Repeatability of VPR solid particle penetration measurement and implications for VPR solid particle penetration efficiency specification

Outline – Meetings – Closed Issues – Data To Gather During Validation 2 – Amendments to GTR Text – Future Plans – Administrative Issues

Administrative Issues Next meeting scheduled for 23 rd September Following this meeting Chairmanship will be taken over by Caro Hosier, Ford Motor Company Co-chairmanship to be confirmed at next meeting