Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.

Slides:



Advertisements
Similar presentations
Standard Work Making the “new way” become the standard way
Advertisements

Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
WAREHOUSING MANAGEMENT
Quality Management Training Quality circles Bench Mark Kaizen.
Presented by Art Smalley President Art of Lean, Inc.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Part of a Training Module Series Part of a Training Module Series Kaizen Orientation Training.
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
O How to Understand & Apply Lean in the Workplace Professional Development Lean Series Charles M. Saunders Lean Libra Consult, LLC November 3, 2010 Oregon.
Supplier Development Kaizen Implementation Kit
October 15, 2012 Jose Chavez Jr, Quality & Technical Services Engineer.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Terumo Cardiovascular Systems: Oxygenator Production Improvement
Lean Manufacturing Case Study Prototype Design-Build.
CONTINUOUS IMPROVEMENT PROGRAM
SSI Sustainable Solutions International, LLC Developers of SPM ™ Preparing the Workplace for the 21 st Century! the 21 st Century! Preparing the Workplace.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
1 Lean Manufacturing More than a fad. 2 Agenda. What is Lean Manufacturing. How does it work. What results can I expect. What is the commitment necessary.
HOSPITALITY MANAGEMENT Ch. 16 HS. THE GENERAL MANAGER  General Manager – is a person responsible for the entire operation of one unit of a hospitality.
Lean MAST Tools for Integrating Lean Projects. Lean MAST Overview Lean MAST provides the roadmap for the transformation from a work order based production.
Welcome to the Lego Widget Flow Factory!
Lean Training through IMPLEMENTATION THE WORKSmart! DIFFERENCE.
How to Effectively Implement Set-up Reduction in Any Organization.
CHAPTER 17 Job Order Costing. Chapter Objectives: 1. Describe cost accounting systems used by manufacturing businesses. 2. Describe and illustrate a job.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name What Lean Means to Printers Young.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
How is a manufacturing facility planned?
Philosophy and Key Concepts
NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June Work streams –New patient referral –Re-referral –Depot MDT teams -
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
LEAN TEAMS. Develop a Systematic process that consistently defines and solves problems utilizing Lean tools.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
Standardization Control Kaizen Facilitation. Objectives Understand the need for standardization Explore different standardization approaches 2.
Yellow Belt Training 10 Step Kaizen Process
“Without the Cost of Waste …”
2 Purpose, Content and Value The Purpose of the MLC Library is to provide members with lean training material and recommended knowledge resources for.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Introduction to Kaizen Introduction Kaizen Facilitation.
Lab Team Jobs Why have specific jobs? Can one person do all the jobs well?
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Supplier Excellence Alliance (SEA) Process Owner Forum Kaizen
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
Gulay Litchfield For CQI-TECH PLC
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
Presented by B rons & S ilva. What is Lean? “Lean is a customer-centric methodology used to continuously improve any process through the elimination of.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
CHAPTER 9 Lean Manufacturing.
Factory Building Symposium on Lean Production
Lean Manufacturing Series
Enterprise / Production System Interface Expand Internally/Externally
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
IAQ Symposium – 2nd IAQ World Quality Forum Kaizen System Implementation Balázs Németh, PhD
Crafting Your Lean Transformation
Starter: Production Key Terms
LEAN ORGANIZATION SUMMARY
Welcome to my presentation
WGEP – Case Study Western Geophysical Exploration Products (WGEP) was barely seen by the customers, once they had a lot of problems, like marginal product.
Apparel management & quality control
Career & Technology Education
Operations Management
OUR MISSION: “To protect and serve the citizens of Conroe and exceed their expectations.”
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
1 LEAN Safety. 2 Lean safety is a systematic approach to identifying and controlling the waste in processes/activities which could cause accidents or.
Implementation of Lean at Rheem Manufacturing
Presentation transcript:

Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

R-Anell Housing Group Denver, NC Clifford Robbins, Lean Manufacturing Engineer Building a Lean Culture

R-Anell Housing  Started:1972  Location:Denver, NC  Home type:Modular  Price point:Moderate to high-end  Design:Substantial customization  Production:6 floors/day  Market area:Southeast US

R-Anell’s Kaizen (RPI) Process 1.Gather data 2.Train associates 3.Map value stream 4.Develop revised layout 5.Implement changes 6.Evaluate production and refine 7.Report to executive team and celebrate 8.Document process and create job instructions

R-Anell’s Kaizen (RPI) Process 1.Gather data 2.Train associates 3.Map value stream 4.Develop revised layout 5.Implement changes 6.Evaluate production and refine 7.Report to executive team and celebrate 8.Document process and create job instructions

Gather Data  Make spaghetti charts  Record procedures  Document current layout, distances and inventory Travel DistancesFeet Sheathing cut (per occurrence) 341 Load gable walls on carrier (per occurrence) 158 Move dormer side walls to assemble dormer (per occurrence) 4 Move dormer window walls to assemble dormer (per occurrence) 35 Dormer build (per occurrence) 282 Access dormer miter saw and lumber (per week) 3,420 Move cut lumber (per week) 2,400 Small Overhead Cabinets Procedure Feet walked Check schedule/print for next cabinet 57 Step to back panel storage – obtain panel – carry to panel saw – place on saw 62 Adjust saw – cut length – put aside excess material to be used or to waste – turn cut piece 9 Adjust saw – cut width – put aside excess material to be used or to waste – carry to wall cabinet build table 82 Step to panel storage – obtain panel – carry to saw and position onto saw 85 Adjust saw – cut sides, top, and bottom pieces – put aside excess material to be used or to waste – obtain pieces and carry to table 66 Lay out side panels – obtain bottle of glue – apply glue to ends 0 Obtain top – position to side – obtain back – position to cabinet – obtain bottom – position to side 0 Stack multiple cabinets as required 0 Step – obtain 4 clamps – return to table – position one clamp to each corner 26 Set cabinet aside for glue to set 0 Total Feet Walked387

R-Anell’s Kaizen (RPI) Process 1.Gather data 2.Train associates 3.Map value stream 4.Develop revised layout 5.Implement changes 6.Evaluate production and refine 7.Report to executive team and celebrate 8.Document process and create job instructions

Train Associates: Pipe Factory  Simulate a production line  Teach lean concepts in a learning-by-doing method  Successive rounds demonstrate the value of lean techniques

R-Anell’s Kaizen (RPI) Process 1.Gather data 2.Train associates 3.Map value stream 4.Develop revised layout 5.Implement changes 6.Evaluate production and refine 7.Report to executive team and celebrate 8.Document process and create job instructions

Map value stream  Area associates develop understanding of production as a system  Learn how lean techniques apply to their production environment

R-Anell’s Kaizen (RPI) process 1.Gather data 2.Train associates 3.Map value stream 4.Develop revised layout 5.Implement changes 6.Evaluate production and refine 7.Report to executive team and celebrate 8.Document process and create job instructions

Develop Revised Layout  Leverage area associates knowledge  Reinforce sense of ownership

R-Anell’s Kaizen (RPI) Process 1.Gather data 2.Train associates 3.Map value stream 4.Develop revised layout 5.Implement changes 6.Evaluate production and refine 7.Report to executive team and celebrate 8.Document process and create job instructions

Report and Celebrate  Describe effort  Celebrate and broadcast success  Document changes

Identifying the Target: Dormer Area  Production not being met  Consistently required overtime  Additional team member requested  Other considerations › First major event › Good supervisor › Off-line operation

Goal: Productivity and Space  Excessive walking  Poor material flow  Batching materials  Excessive inventory  Poor equipment positioning  No table saw

RPI Team >Charles Jervais, director of process development >Clifford Robbins, lean engineer >Carlos Soto, safety manager >Gary Lynn, supervisor >Jorge Jordan, team leader >Luis Aleman >Pedro Aleman >Stanley Axe >Michael Childers >Miguel Davia >Joseph Flowers >Ricky Gibbs >Steve McEntire >Silverio Martinez

Then  Layout before RPI Now  Layout after RPI Logical flow puts products where they need to be Extended crisscrossing flow and bloated work areas

Results  Provided 2,400 sf for building large gable dormers  Reduced material inventory  Value of manufacturing space freed up: $108,000  Annual labor savings: $27,300 IssueThenNowChange Floor area 6,988 sf4,726 sf Reduced 2,262 sf Travel distances 13,0272,848 Reduced 2 miles per day Employees 98 Reduced by 1

Highlights  Associates speak directly to management  Deep respect for associates efforts  Substantial management commitment  Substantial investment in associate time

Going forward  Accelerated lean training schedule  Concentrate on problem areas identified by the Value Stream Map  Provide lean support for move  Include lean training for new associates during orientation

Lean Symposium

Manufactured Housing Research Alliance Jordan Dentz (212) x13 Factory Building Symposium on Lean Production