SCR 740 Implementation of Web Services for ESIID level data Jackie Ashbaugh EAA Data Management.

Slides:



Advertisements
Similar presentations
May 24, 2011 PUC Project AMIT Stakeholder Steering Committee Anna Grau
Advertisements

Data Extracts Working Group (DEWG) Update Tuesday, September 25, 2006.
9/13/2007 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
ERCOT Billing, Settlement Disputes & Data Extracts
Retail Sub-Committee Update Robert Connell June 14, 2002.
Enterprise Information Services (EIS) - Review Ray Chase Manager, EIS.
Retail Market: User Interaction & Data Delivery in Nodal.
01/21/2008 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
1 ERCOT Load Research Update PWG August 24, 2005.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
PR Phase II SCR 727 SCR 740 Web Services Jackie Ashbaugh Commercial Operations Data Integrity & Administration August 18, 2006.
ERCOT MARKET EDUCATION
ERCOT Lodestar Extracts Timing Recommendation ERCOT May 24, 2005.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
1 Market Data Transparency SCR 740 Business Training SCR 727 Phase II: Web Services ERCOT presents:
1 Update from ERCOT Retail Market Services to RMS May 15, 2003.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Update to RMS January 14, MarkeTrak – Release 3 Release 3 was successfully migrated the weekend of December 13 th Stabilization period – Dec 13.
June 22 and 23,  The information and/or flow processes contained in this Power Point presentation: ◦ Were created to allow interested parties to.
09/15/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
SCR786 - Alt Remove SIM dates from CERT Enhance CERT hardware and/or software Processing times at volume may not meet Performance Measures criteria Do.
June 10, 2009 RMS PR90006, Commercial Systems Information Lifecycle Management (ILM) Hope Parrish, ERCOT.
1 Update from ERCOT Retail Market Services to RMS September 26, 2003.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
Overview of MID, MIR, & Extracts for DEWG 9/24/07 Steve Cox.
10/13/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
Retail Transaction Processing Year End Review and Recent Issues RMS January 2007.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
ERCOT MARKET EDUCATION Retail 101. Retail Transaction Processing.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
MARS Advanced Metering – ERCOT Market Facing Changes Jackie Ashbaugh Manager Data Integrity and Administration 3/9/2009.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
1 Market Data Transparency SCR 740 Business & Technical Training SCR 727 Phase II: Web Services ERCOT presents: Market Data Transparency.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
Distributed Renewable Generation Profile Implementation Plan.
1 RMS Update By Don Bender January 9, RMS Approved Resolution Upon TAC approval, suspend further True-up settlements for True-up resettlement.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Changes to SSO Extract:  Based on DEWG discussions in 2005, ERCOT is recommending the following changes to the SSOE: In lieu of the current daily files.
September 21, Data Extract Projects Jackie Ashbaugh Commercial Operations Data Integrity & Administration September 21, 2006.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
ERCOT Portal Replacement Phase 2 Project Update to RMS Presented by Dave Odle Thursday, October 16 th, 2003.
1DRAFT for DISCUSSION Transition From Non-IDR to IDR Load Profile and LSE 15-minute Data for AMS Market Advanced Readings and Settlements Taskforce 10/9/09.
DEWG Meeting Summary Report to COPS 09/10/2007 Jim Galvin- Luminant Energy.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
Proposed Timeline for Extract, Variances, True-Ups Extracts 10/1/03 Clear all “old” extracts from Portal 9/26/03 Post last “old” daily extract 10/6/03.
PR30026 Resource ID (RID) Extract and Recorder Extract Data Extracts Working Group May 18, 2006 Laura Zotter ERCOT Market Operations D P O.
Summary of the November 11, 2002 Market Synchronization “How-to-Fix” Decisions For presentation to RMS November 14, 2002.
PWG Demand Response Follow Up Jackie Ashbaugh October 23, 2007.
August 17, 2006 Data Extract Working Group EDW Project Updates 2006 / 2007 MO & RO PPL.
1.  What is the purpose of DEVs? Data Extract Variances (DEVs) are used to synchronize the data among all Market Participants (MP)  What is a DEV? It's.
Module 1 From Bundled Utilities to Current Market Design.
MODPO Project Update Overview of December Implementations & EDW Changes Commercial Operations Subcommittee December 11, 2006.
1 Status of True-up Settlements Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec April 26, 2003 Date we expect to be back to.
Role of Account Management at ERCOT EIS Project Updates Jackie Ashbaugh Mgr., Commercial Operations Data Integrity & Administration DEWG October 19, 2006.
02/01/2008 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
November 17, 2014 ERCOT AMS Data Loading Result Code Descriptions & Distribution AMS Workshop IV.
ERCOT MARKET EDUCATION
Smart Meter Texas TDSP Master sync fileS
MARS Taskforce RMS Update December 9, 2009.
Usage Billing Issues.
DEWG Jackie Ashbaugh ERCOT
Demand Response – ERCOT discussion items
Presentation transcript:

SCR 740 Implementation of Web Services for ESIID level data Jackie Ashbaugh EAA Data Management

Information included in SCR 727 ESIID Service History and Usage Extract – ESIID level data: ESIID existence – Data included in 814_20 ADD, RETIRE ESIID relationships (LSE, TDSP, MRE) – Data included in 814_20 ADD (TDSP, MRE) – Data resulting from retail activity in the Registration System ESIID characteristics (Loss Code, Station Code, Profile Code, CM Zone) – Data included in 814_20 ADD, MAINTAIN ESIID usage (IDR and non-IDR) – Data included in 867_03/F from PTD~SU loop and PTD~PP loop – Market level data: Tables to de-code data included in the ESIIDSERVICEHIST table such as TDSP, REP, PROFILECLASS, STATION, etc

Overview of Requirements for SCR 740 Provide MPs capability to query ESIID level data directly from ERCOT systems that is included in the SCR 727 ESIID Service History and Usage Extract Elementary Services – Questions utilizing one primary table to gather data for result – Example: What ESIIDs do I own? Integrated Services – Questions utilizing multiple tables to gather data for result – Example: What ESIIDs do I own and what usage is loaded for a specific trade date? Data results presented in a manner that will allow MPs to load the data directly into their SCR 727 database Capability for MPs to request baseline databases to recreated their entire SCR 727 database Multiple logins for multiple duns – At login market participants would only be required to input the DUNS Numbers they want data for. So if a MP has 6 DUNS Numbers but only wants data for 3 of those DUNS Numbers they would only be required to input those 3.

Types of ESIID level Questions provided with SCR 740 MPs will only receive data results for ESIIDs that belong to them at the point in time of their request MPs may upload a parameter file that includes ESIIDs/UIDESIIDs with up to 1000 records Data requests are queried against ERCOT’s Lodestar (Data Aggregation & Settlements System) ODS environment For a specific trade date and/or point in time: – What ESIIDs do I own? – What ESIIDs do I own with certain attributes? – What ESIIDs do I own with IDR/NIDR usage? Loaded or not loaded? – What ESIIDs do I own with certain attributes and IDR/NIDR usage data? – What ESIIDs I own with IDR/NIDR transaction loaded? – may upload the transaction id for an 867_03 to see if it is loaded or not loaded in ERCOT systems – Provide parameters from an LSEUNADJ load cut in the Load Extract to provide the resulting ESIID data that was used during data aggregation/settlments