SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013.

Slides:



Advertisements
Similar presentations
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Advertisements

Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
15 th September 2013 Enagás and TIGF Information to NRAs.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
EU Developments Transmission Workgroup 6th October 2011.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Amine Abada 06/10/2014 ERI SWE TERRE #2 Trans European Replacement Reserve Exchange.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Paris, 1 st March th IG meeting - SWE ERI.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Savings and Investment Unit Project Student Name.
PCR Status report AESAG, September Supported by:
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Joint IPE auction implementation and results 1 SWE IG meeting – 7 April 2014 Joint IPE auction Update on launch of long term coordinated product (CNMC.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG December 2008 John Prime - Claude Perret.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
SWE Day- Ahead market coupling
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Trans European Replacement Reserve Exchange
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
TERRE Trans European Replacement Reserves Exchange
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Imbalance Netting Platform
13-block rotation schedule
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
Trans European Replacement Reserve Exchange
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
RR Platform – Implementation Framework
Presentation transcript:

SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Agenda 2 Context Project - Design Status of the project Working axes Plan of the Design Phase Preparation of the future phases

Context

TSOs = 80% of TSOs using RR 4 REN NGET TERNA RTE REE

The Design of TERRE solution will be compliant with the requirements of:  The FW guidelines on Electricity Balancing  The NC on Electricity Balancing Centralised and automatic management of XB capacity Offer based on “cheapest” internal bids Improved matching process… Context 5 The TERRE solution will enhance the experience of current Balit solution used between NG and RTE being extended to the SWE region by the beginning of 2014 The TERRE project will use as an input the previous work of REN, REE and RTE on enduring solution for the exchange of balancing energy between TSOs

Context 6 Total volume activated during this period = 205GWh Overview of Balit SO-SO exchanges Dec 2011 to August 2012

Project-Design

MoU and NDA which cover the design phase In signature process Status of the project 8 Working axes defined and shared between TSOs…

Definition of the standard TERRE products RR offer RR need Working axes 9 Definition of matching process and settlement procedure TSOs RR needs Netting «FCFS» or «Algorithmic optimization» Marginal price or Pay as bid Financial issues Definition of Financial settlement between the TSOs Study of the potential financial benefit 213

Timing and scheduling Working axes 10 ATC management Centralized ATC management Interaction between the Intra-day market and the TERRE process Governance issues Preparation of the NRAs approval process Preparation of the Implementation Phase 456

11 High level plan of the Design Phase 11 Implementation : May 2014  April 2015 Implementation : May 2014  April 2015 Deployment : From May 2015 Deployment : From May 2015 Extension: 2016 Extension: 2016 Future steps : Expected plan Compliant with FW EB timelines 11 October November December January Axes 2013 TERRE - Design 2014 February March April Governance ATC management Timing and scheduling Financial issues Matching process TERRE products End of the design phase May June

Preparation of the future phases 12 High level Business Process and the result of the TERRE solution design March 2014 Functional and Non-Functional specificationsApril 2014 Detailed project implementation planApril 2014 Drafting of NDA agreement of implementation phase (to be confirmed) May 2014 Drafting of Cooperation agreement of implementation phase May 2014 Drafting of PMO procuring process for implementation phase May 2014 Launching of regulatory approval June 2014