# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.

Slides:



Advertisements
Similar presentations
ICANN Plan for Enhancing Internet Security, Stability and Resiliency.
Advertisements

Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
Advanced Metering Implementation Team Completion Road Map Discussion Through 2013 and Transitional Steady State Revision Date December 6, 2011.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Cyber Security and the Smart Grid George W. Arnold, Eng.Sc.D. National Institute of Standards and Technology (NIST) U.S. Department of Commerce
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen
Systems Engineering in a System of Systems Context
BIM Sarah Birchall and Jo Harris 25 th September 2014.
Oncor’s EIM Program.
Smart The Grid Plenary Panel: Smart Grid Interim Roadmap Draft and Processes Joe Hughes, EPRI Erich Gunther, Enernex Frances Cleveland, Xanthus Consulting.
OpenFMB Specification Development Plan
8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
EPRI Smart Grid Demonstration and CIM Standards Development
1 IS 4420 Database Fundamentals Chapter 2: Database Development Process Leon Chen.
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
Enterprise Financial System Project Overview & Update Council of Research Associate Deans March 22,
1 REQUIREMENTS ENGINEERING and SYSTEMS ANALYSIS Elements and Definitions.
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
Donny Helm Director – Technology Strategy and Architecture Oncor Electric Delivery November 1, 2012 The Challenges of Establishing A Common AMS View In.
Software Architecture April-10Confidential Proprietary Master Data Management mainly inspired from Enterprise Master Data Management – An SOA approach.
Enterprise Architecture
Learning and Development Capgemini North America June 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
a Service Oriented Architecture
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
© 2008 Eventure Events. All rights reserved. Standard interfaces & lower TCO in AMI Klaus Heiman, Wayne Longcore SAP, Consumers Energy.
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Software Requirements Engineering CSE 305 Lecture-2.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group Overview & Plans For further information, contact Wayne Longcore Chairman of AMI-Ent TF.
IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Lecture 7: Requirements Engineering
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
AMI-Enterprise Use Case Team Status Kay Stefferud Columbus OH, July , Hosted by AEP.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Open AMI Network 10/22/08.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
Managers Guide to AMI Enterprise. AMI Enterprise What it is Why you need to be involved How you get involved Who from your organization needs to be involved.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
OUTCOMES OBJECTIVES FUNCTIONS ACTIONS TERRITORIES LOCATIONS MARKET SEGMENTS TIME LINESCHALLENGE IMPACT RESOURCESACTIVITIESCHANNELS RELATIONS PARTNERS CUSTOMERS.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
SQA project process standards IEEE software engineering standards
AMI Enterprise Task Force of the Utility AMI Working Group
CIM Modeling for E&U - (Short Version)
SQA project process standards IEEE software engineering standards
The Enterprise Relevant Scope of DM
Enterprise Resource Planning (ERP)
Organizing Semantics For Effective Enterprise Application Integration
A Process View of the Supply Chain
Smart Grids activities in ETSI
Employee engagement Delivery guide
Requirements Document
Presentation transcript:

# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou

# 2 SRS Team Status SRS team status since the Knoxville meeting: –Developed first complete draft of the Logical Components and Functions Model –Supported AMI-ENT service definition team activities including the CMS-AEP collaboration meeting –Started to develop the first draft of the SRS document Guiding Principles Reference Architecture Requirements –Goal is to make the first draft available for reviews by the March meeting.

# 3 AMI-ENT SRS Table of Content 1.Introduction 1.1Purpose 1.2Scope 1.3Acronyms and Abbreviations 1.4External Considerations and References 1.5Document Overview 2.Overall Description 2.1Architecture Guiding Principles 2.2Architectural Considerations 3.AMI-ENT Reference Architecture 3.1AMI-ENT Reference Model 3.2AMI-ENT Logical Architecture 4.AMI-ENT System Requirements 4.1Requirements Framework 4.2Systems Requirements Specification 4·2.1Functional Requirements 4·2.2Technical Requirements 5.Appendices 5.1Terms and Definitions

# 4 What is AMI-ENT Reference: Rendered from AMI System Security Requirements v0_93 Figure 5: Scope of AMI Systems Others???

# 5 AMI-ENT Logical Components AMI Head-End AMI Meter Asset Maintenance AMI Network Asset Maintenance AMI Network Management AMI Service Manager C&I Customer Demand Resource Management Customer Information Analysis Customer Information Management Customer Presentment & Analysis (C&I) Customer Presentment & Analysis (Residential) Customer Relationship Management Distribution Engineering Analysis Distribution Management Distribution Operational Analysis Demand Response Management Distribution SCADA Enterprise Asset Management Energy Management Enterprise Service Bus Geographic Information Management HAN Management Meter Data Management Mobile Data Terminal Mobile Workforce Management Outage Management Power Market Management (ISO) Power Trading (MP) Revenue Protection Supply Chain Management Transformer Load Management Third Party Portal (AMI) Work Management Work Scheduling Gas related components? AMI-ENT SRS seeks to define a complete reference model that includes all logical functional components within and outside utility enterprise that are needed to deliver the AMI specific business functions.

# 6 Why the AMI-ENT Reference Model Because the current IEC reference model is limited to only basic metering related functions. Because the future use case analysis and the services being defined needed a stable reference model to be more consistent and reusable across implementations. Because it could serve as the vehicle to manage the scope and priorities of use case and services to be delivered. Because it could provide best practice architecture recommendations for those implementations that may want to leverage outcomes AMI-ENT effort.