Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
ERCOT Planning Overview and Summer 2014 Assessments Update
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
LAREDO RMR EXIT STRATEGY Presentation to Technical Advisory Committee March 4, 2004 Transmission Services Operations.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Overview
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Sep 16, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project -
Modeled Load Levels in the Valley
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Electric Utility Master Plan Update
Presented by: LADWP November 14, 2017
Presentation transcript:

Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report

2 Oct. 14, 2011RPG Meeting Project Options Option 1 – (Sharyland and BPUB proposal) New 345kV Loma Alta station with two (2) 345/138kV 450 MVA auto ~14 mile 345kV transmission line from existing 345kV La Palma station to new 345kV Loma Alta station ~59 mile 345kV transmission line from new 345kV Loma Alta station to new 345kV Frontera station across the valley Option 3 New 345kV Loma Alta station with one 345/138kV auto ~25 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station Rebuild LaPalma-Cavazos-Military Highway with ACSR Rebuild LaPalma-Los Fresnos-LomaAlta with ACSR

3 Oct. 14, 2011RPG Meeting Project Options (Cont.) Option 4 New 345kV Loma Alta station with one 345/138kV auto ~25 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station Rebuild and convert LaPalma to Brownsville 69 kV line to a 138 kV line; Add new 138 kV substation to tie LaPalma- Brownsville and the Military Highway-Carbide138 kV lines. Option 5 (new) New 345kV Loma Alta station with one 345/138kV auto ~25 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station ~12 mile 138kV transmission line from LaPalma – Palo Alto

4 Oct. 14, 2011RPG Meeting LRGV/Brownsville Area Transmission system Rio Hondo-Loma Alta 345 kV for Options 3, 4 & 5 LaPalma 138 kV rebuild’s Option 3 LaPalma 69 kV to 138 kV Option 4 LaPalma- Palo Alto 138 kV Option 5

5 Oct. 14, 2011RPG Meeting Base Case Model & Assumptions YTP summer peak case based on the 2011 SSWG Dataset B Brownsville Area Load ~ 589 MW (including 250 MW load at Loma Alta) Silas Ray largest combined cycle unit (train) turned off Silas Ray oldest unit (49 years) turned off Total generation online in Brownsville ~ 48 MW AEPSC LRGV Project o A new 163 mile, single circuit 345kV line from Laredo Lobo to Rio Bravo to N. Edinburg o Reconductor the existing two 345 kV line in to the LRGV

6 Oct. 14, 2011RPG Meeting 2016 Power Flow Results N-1 & G-1 (with the new 250 MW load) Base Case thermal (n-0) violations in 2016 Rio Hondo – East Rio Hondo 138 kV line (151.6%) East Rio Hondo – Central Avenue Sub 138 kV line (140.4%) LaPalma – Los Fresnos 138 kV line (124.6%) LaPalma – Cavazos line 138 kV (115.3%) Loma Alta – Los Fresnos 138 kV line ( 109.1%) Military Highway – Cavazos 138 kV line (108.3%) There are additional overloads under contingency No low voltage violation (in base case or under contingency)

7 Oct. 14, 2011RPG Meeting 2016 Power Flow Results N-1 & G-1 (without the new 250 MW load) Base Case thermal (n-0) violations in 2016 Rio Hondo – East Rio Hondo 138 kV line (108.9%) There are additional overloads under contingency (as shown in the map) No low voltage violation (in base case or under contingency)

8 Oct. 14, 2011RPG Meeting 2016 Power Flow Results N-1-1 (without the new 250 MW load) Prior Outage of either the Ajo-Rio Hondo 345 kV or Rio Hondo-N. Edinburg 345 KV: The loss of the next 345 Rio Hondo would cause severe overloads on several 138 kV and 69 kV lines (cross valley lines serving Brownsville area). Some of the major post-contingency (> 120%) N-1-1 overloads: Weslaco Unit to Steward Road 138 kV line (158.4 %) Weslaco Switching Station to Weslaco 138 kV line (149.7%) Aderhold to HEC Energy Center 138 kV line (142.7%) Heidelberg to Weslaco 138 kV line (134.0%) Elsa to Aderhold 138 kV line (133.6%) Burns to Heidelberg 138 kV line (126.3%) South McAllen to Las Milpas 138 kV line (124.5%) Wesmer to Weslaco Unit 138 kV line (120.7%) Mitigation plan to prepare for this next contingency (under system peak conditions) would require load shed in the East Valley/Brownsville area. Based on this study, it is estimated that under the 2016 system peak system conditions, it would require ~ 430 MW of load shed in the East Valley/Brownsville area to relieve all N-1-1 overloads.

9 Oct. 14, 2011RPG Meeting Summary of Results √ - no criteria violation x – criteria violation OptionsProject Description N-1+G-1 CriteriaN-1-1 Criteria without 250 MW loadwith 250 MW loadwithout 250 MW loadwith 250 MW load 1 LaPlama - Loma Alta 345 kV & Frontera - Loma Alta 345 kV√√xx 1a LaPlama - Loma Alta 345 kV√xxx 1b Frontera - Loma Alta 345 kV√xxx 3 RioHondo - Loma Alta 345 kV, Rebuild LaPalma-Cavazos-Military Highway & Rebuild LaPalma-Los Fresnos-LomaAlta√√xx 3a RioHondo - Loma Alta 345 kV√xxx 3b Rebuild LaPalma-Cavazos-Military Highway√xxx 3c Rebuild LaPalma-Los Fresnos- LomaAlta√xxx 4 RioHondo - Loma Alta 345 kV, Rebuild and convert LaPalma- Brown 69 kV to 138 kV√√xx 4a RioHondo - Loma Alta 345 kV√xxx 4b Rebuild and conver LaPalma- Brown 69 kV to 138 kV√xxx 5 RioHondo - Loma Alta 345 kV, LaPalma-Palo Alto 138 kV√√xx 5a RioHondo - Loma Alta 345 kV√xxx 5b LaPalma-Palo Alto 138 kV√xxx

10 Oct. 14, 2011RPG Meeting Project Options for N-1-1 Criteria Loma Alta-N. Edinburg 345 kV instead of the Loma Alta-Rio Hondo 345 kV for Options 3, 4 & 5

11 Oct. 14, 2011RPG Meeting Study status/update Completed the studies for the N-1+G-1, N-1-1 and new 250 MW load sensitivities. Working with TO’s to obtain cost estimates for the options. Working on completing the draft study report. The tentative date for the study report is end of October or first week of November.

12 September 17, 2010RPG Meeting March 12, 2010 Questions?