April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

Electrical and Computer Engineering Mississippi State University
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
2015 RTP Update January, 2015.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Real-Time Transmission Congestion Management & Market Effects
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
EE 369 POWER SYSTEM ANALYSIS
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
RPG Meeting Five Year Plan Extension Brad Schwarz.
2015 Summer Shoulder-Peak Near-Term Assessment of Transmission System Performance ~ Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions-Updated April 22, 2014.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
ERCOT PUBLIC 6/17/ LTSA Load Distribution Methodology June 17, 2014.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Regional Operations Review Group Activities Status Report to TAC April 8, 2004.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Probabilistic Transmission Planning - ERCOT
Freeport Area Master Plan Project -
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
ERCOT 2009 Five-Year Transmission Plan Update
Southern Cross Directives Planning Items
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
Presentation transcript:

April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo

2 April 16, 2010RPG Meeting YTP Status Report –Final report posted! AC analysis –2010 AC Case addendum report sent to TOs for comment –No voltage criteria violations –Some thermal exceedances –2013 AC Case work ongoing

3 April 16, 2010RPG Meeting YTP Reliability Analysis 2015 Reliability Analysis –Initial n-1 reliability analysis complete –Initial generation outage analysis complete except for North/ North Central –Due to high load in North Central weather zone there is little reserve margin when large generation units are taken out of service in the region –Low wind scenarios under study

4 April 16, 2010RPG Meeting YTP Reliability Analysis Tools Powerworld SCOPF Security Constrained Optimal Power Flow Utilizes cost curve for each unit Optimizes cost Assigns penalty cost for every MVA overload Can set to optimize for minimal change in dispatch Performs AC contingency analysis then dispatches around problems Must perform iteratively Can have “see-saw” constraints Reports “unenforceable constraints” for reliability problems that cannot be fixed with redispatch Run times ~ minutes for full AC SCOPF **********Not an endorsement for Powerworld***********

5 April 16, 2010RPG Meeting YTP Reliability Analysis Tools TARA SCRD Transmission Adequacy and Reliability Assessment Security Constrained Reliability Dispatch Set to optimize for minimal change in dispatch Assigns penalty factor for every MVA overload Can also run SCOPF Performs simultaneous DC contingency analysis and redispatch Runs final AC powerflow check at end of run May have slight overload in AC at end of run Reports overloads in Excel spreadsheet for reliability problems that cannot be fixed with redispatch Run times ~ 1 minute for SCRD N-1-1 analysis Runs contingency subset for first n-1 with full contingency set for second -1 Performs SCRD (or SCOPF) for each of first contingency set run Used to run generation outage analysis in 5YTP Run times ~ 2-3 hours for ERCOT generation outage and full SCRD **********Not an endorsement for TARA***********

6 April 16, 2010RPG Meeting YTP Low Wind Scenario Analysis Low wind scenario(s) studied for reliability analysis Purpose is to find local reliability problems if wind is not blowing at or near peak load Scenario selection Divided ERCOT into six wind generation regions Similar to work done for SSWG wind dispatch analysis McCamey, Central West, West Abilene, Lower Panhandle, Coast, Culberson County Analyzed historical (2009) wind output in each region for ERCOT load above 60,000 MW 76 hours in 2009 ~99 th percentile load ~95-100% peak load Assumed low/ zero curtailment at low wind generation output

7 April 16, 2010RPG Meeting YTP Low Wind Scenario Analysis Low wind scenario(s) data observations Regional wind output has some correlation to system load (correlation factor not calculated) Regional wind output data above 60 GW load does not fit a normal distribution Data set for each region divided into six quantiles 16.67% of data points will be lower than first quantile 83.33% of data points will be higher than first quantile 1 st quantile represents similar statistical probability to one standard deviation below mean for a normal distribution (17%) 1 st Quantile 16.67%83.33%

8 April 16, 2010RPG Meeting YTP Low Wind Scenario Results of data analysis Will create six low wind cases for reliability analysis Each of six regions will have wind generation in respective region set to above output % All other wind generation in case will be left at SSWG output levels Region High Output % Low Output % 1 st (of 6) Quantile % Proposed Output % McCamey Central West West Abilene Lower Panhandle Coast Culberson

9 April 16, 2010RPG Meeting YTP Reliability Analysis Next Steps –Wrap-up 2015 reliability analysis –Perform project back-out to validate results –Send initial project set out for comment –Begin reliability analysis

10 April 16, 2010RPG Meeting March 12, 2010 Questions?