RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Walls crates cables gas chambers electronics CERN adb.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
RICH 17 m Beam Pipe Mirrors Separate pions from muons
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
RICH WG: Introduction M.Lenti. Outlook PMs and sockets: what we have Vacuum vessel, no Neon purification Cost of aluminum disks (raw material) Cost of.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
The NA62 RICH detector M.Lenti INFN Sezione di Firenze.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Test on mirror support prototypes M. Lenti. News from MARCON Shipping at CERN of all the mirrors: end of 2010 – beginning of dummy segments ordered.
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Planning for Proto-DUNE PD Installation and Cabling at CERN
IFR mechanics status of the detector & tooling development
Baby-MIND Modules & Services
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Update on Pavia MM mechanical prototype
Status of straw production straw module assembling
Performances of the NA62 RICH detector
Performances of the NA62 RICH Detector
Ongoing and to do work M.Lenti.
Mini-drawers, FE-ASIC , Integrator
Status of upgrade works at Clermont-Ferrand
Progress of the NA62 RICH detector
IFR detector mechanics
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
NPS mechanical design 01/31/2019 Jlab meeting
Presentation transcript:

RICH WG M.Lenti

Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s presentation last Tuesday)  Mirror Support Status (V.Carassiti)  Mirror Support Prototypes (G.Anzivino)  PM installation (M.Lenti)  RICH TDAQ status (M.Piccini, reported in the TDAQ summary)

THE MIRRORS– FRONT VIEW Ferrara, 08/2013V. Carassiti - INFN FE3

STABILIZING RIBBONS & MIRROR SUPPORTS Ferrara, 08/2013V. Carassiti - INFN FE4

THE HOLES ON THE SUPPORTING PANELS Ferrara, 08/2013V. Carassiti - INFN FE5

THE HOLES ON THE SUPPORTING PANELS - DETAIL Ferrara, 08/2013V. Carassiti - INFN FE6 TENSIONING RIBBON MIRROR SUPPORT (CONE) TRANSMISSION SUPPORT PLANE B

THE TENSIONING RIBBONS Ferrara, 08/2013V. Carassiti - INFN FE7

THE HALF CENTRAL MIRROR Ferrara, 08/2013V. Carassiti - INFN FE8 TWO DOWELS

THE HALF CENTRAL MIRROR Ferrara, 08/2013V. Carassiti - INFN FE9 MIRROR SUPPORT TENSIONING RIBBON (HORIZONTAL AXIS ROTATION) SLIDING DOWEL SYSTEM (VERTICAL AXIS ROTATION)

THE SLIDING DOWEL SYSTEM - DETAIL Ferrara, 08/2013V. Carassiti - INFN FE10 MIRROR SUPPORT KNOB SUPPORT SLIDING DOWEL ACTUATING BAR KNOB FIXED DOWEL

THE HALF MIRROR IN PLACE Ferrara, 08/2013V. Carassiti - INFN FE11

THE TOOLING ASSEMBLING THE MIRROR – FINAL UPGRADE Ferrara, 08/2013V. Carassiti - INFN FE12

Prototype 2.0 (1 mirror)

Prototype 2.0: done Stabilizer Ribbon added

Prototype 3.0 (3 mirrors) in preparation in Perugia Ferrara, 12/06/2013V. Carassiti - INFN FE15 FRAME MIRROR HONEYCOMB PLATE

MIRRORS ASSEMBLY – PUT THE MIRROR IN PLACE -1 INSERTION SYSTEM – UPDATED DESIGN Ferrara, 12/06/2013V. Carassiti - INFN FE16 THE INSERTION OF THE DOWEL INTO THE MIRROR’S HOLE HAS TO BE DONE CAREFULLY THE MIRROR CAN’T BE HELD BY HAND DURING THE CONECCTION AND THE TENSIONING OF THE RIBBONS THE INSERTION SYSTEM DOES HAVE 3 AXES MOTION AFTER THE CONNECTION OF THE RIBBONS THE LIFTING FRAME IS DISMOUNTED AND THE INSERION SYSTEM CAN MOVE TO THE NEXT MIRROR

Material procurement in Perugia  Honeycomb panel  order placed beginning of August  delivery expected mid september  Frame to host the panel  same as the panel  Insertion tool  in production, same delivery time  Order for aluminium for the whole production of cones and additional pieces for the mirror support  a little bit delayed, but  we have in the workshop the material necessary for the production of the pieces for the prototype Giuseppina Anzivino

Front view of RICH PM and electronics HV SIG HV SIG 16 X 32 CH HV FILTER HV SIG HV SIG PMT SUPPORT 5x TEL62

I: 28 super-cells 7 up-boards 224 channels II: 33 super-cells 8+1/4 up-boards 264 channels III: 33 super-cells 8+1/4 down-boards 264 channels IV: 28 super-cells 7 down-boards 224 channels JURA side 16 FE up-boards (32 ch each) 512 ch total 16 FE down-boards (32 ch each) 512 ch total I I I I I I V Super-Cells Numbering RACK Numbering is chosen to optimize cable lenght and PM-Crate distance Saleve side is equal (not specular) with rack on the right

Supercell LR PMs are grouped in Supercells of 8 PM each (to be used in multiplicity trigger) Two HV channels (L and R) feed one Supercell

PM Lodging disks Each disk has 976 holes; there are two lodging disks In each hole a thin o-ring 1 mm thick ( mm Ø) is inserted in a gorge at the downstream end It is the arrest of the PM (and protection against ambient light from the back)

New sockets (test sample) HV connector Signal cable without connector New socket Thick o-ring (6 mm thick) A thick o-ring is inserted upstream of each socket+PM to keep it in position, protect from ambient light and provide a good thermal contact

PM+socket insertion Upstream view of the disk Fixation bar inserted A fixation bar in inserted every two rows of PMs to keep them in position and facilitate the dissipation of the residual heat produced by the sockets

Work in clean room Ready to install all the PM+sockets

Conclusions Approaching final design of the mirror support system Intense prototyping ongoing on the mirror support: people training, details checking, etc PM installation on the lodging disks started: first step of a full (laser) test of all the electronics chain before installation at CERN Some delay in RICH vessel construction