34TH ANNUAL AIRPORTS CONFERENCE

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Normal Operations Data: Air Traffic Facility Evaluations and NOSS
James O’Sullivan Pans-Ops & Airspace Inspector Irish SRD/NSA
The Evolution of NWS Aviation Weather Services in Chicago Mike Bardou National Weather Service Chicago The views expressed in this presentation are those.
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Presented to: By: Date: Federal Aviation Administration PASSENGER FACILITY CHARGE PROGRAM UPDATE 29 TH Annual Airports Conference Sheryl Scarborough, FAA.
Introduction to Digital NOTAM
SMS and Safety Risk Management in Airport Planning and Development Presented by Rusty Chapman, P.E. Delta Airport Consultants, Inc. March 3, 2011.
Delivering Digital NOTAMs over
By: Date: Federal Aviation Administration U.S. Aeronautical Information Management (AIM) Modernization Update on digital Federal NOTAM System Brett Brunk.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Presented to: Federal Architects By: Kim W. Barnette, Ph.D. Aeronautical Information Management Federal Aviation Administration Date: April 11, 2007 Federal.
Presented to: By: Date: Federal Aviation Administration Standard Operating Procedures/Letters of Agreement Overview and Demonstration Demonstration and.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
What is Business Analysis Planning & Monitoring?
PMP® Exam Preparation Course
Basics of OHSAS Occupational Health & Safety Management System
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Outcome: Zero fatalities resulting from runway incursions.
Presented to: SEARAST, NARAST, SARAST By: Glenn Michael Date: November , 2007 Federal Aviation Administration Analytical Unit Call to Action on.
A Perspective on NASA Ames Air Traffic Management Research Jeffery A. Schroeder Federal Aviation Administration* * Formerly NASA Ames.
0 Downloaded from FAA Runway Safety Briefing Sun ‘n Fun EAA Fly-In April 2002.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
NOTAM Modernization at the FAA
Digital Airport Surface NOTAMs. Introduction What are NOTAMs? –Notices to Airmen (NOTAM) are used to alert pilots about temporary changes affecting the.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Federal Aviation Administration NOTAM MANAGER OVERVIEW Lockheed Martin Proprietary Information Proprietary information owned by Lockheed Martin, such as.
KNOVADA – CUSTOMERSOFT SOLUTIONS Maximizing The Business Value Of Your Employees.
By: Date: Federal Aviation Administration AIXM Conference Don Smith and Vinod Vallikat Aeronautical Information Management March 18, 2007 Digital NOTAM:
Presented to: By: FAA Aeronautical Information Management Date: March 23, 2010 Federal Aviation Administration Federal NOTAM System (FNS) AIXM 5.1 XML.
1 Digital NOTAMs – A new paradigm. 2 Discussion Points NOTAMs – what are they? Recommendations from the AIM Global Congress Components of a digital NOTAM.
Presented to: By: Date: Federal Aviation Administration Automating Project Data Submittals Setting Expectations FAA Airports (AEA) Conference Cameron Bryan,
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
The NATS Review of ATM Occurrence Reporting Prepared for ICAO European Region Aviation Safety Seminar/Workshop (Baku, Azerbaijan, 5 -7 April 2006) by Jane.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
Federal Aviation Administration Acquisition Career Certification & Management Rebecca Deloney Acquisition Career Management November 4, 2009.
Presented to: By: Date: Federal Aviation Administration Quality and Standards Team (QST) In-Service Management Gold Standard ATO Acquisition Practices.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
By: Date: Federal Aviation Administration Airport Direct-entry Digital NOTAMs Kathlyn Hoekstra Senior Policy Analyst FAA/ATO/Aeronautical Information Management.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Ensuring the Safety of Future Developments
Federal Aviation Administration The AIM Modernization Program A strategic overview AIMM Program Office, AJM-336.
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
International Safety Rating System
Introduction to Digital NOTAM
NOTAM MANAGER ACA 2016 Annual Conference Jennifer Dady
Digital NOTAM Towards a concept of operations
Collaborative Decision Making “Formulating CDM Strategies”
Workshop on preparations for ANConf/12 − ASBU methodology
Data Communications Program
RST processes Session 5 Presentation 2.
Advancing Digital NOTAM implementation
Safety Risk Management (SRM) Process Overview
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
U.S. Aeronautical Information Management (AIM) Modernization
Introduction to Digital NOTAM
Definition IPPF Audit Standard 2120 – Risk Management
Presentation transcript:

34TH ANNUAL AIRPORTS CONFERENCE Direct-entry Digital NOTAM (DDN) System Deployment and Implementation Presentation and Demonstration of DDN Presenters: Mark Falen and Steve Meinders

AIM Direct Entry Digital NOTAM Development Federal Aviation Administration (FAA) operates a legacy Notice to Airmen (NOTAM) system. Transition from Legacy system to digitized NOTAM input with software that contains functionality to provide NOTAMS in ICAO, U.S., and plain language formats

AIM Direct Entry Digital NOTAM Development Advances in technology and modernization of the air traffic control system (NEXTGEN) have mandated a change in the NOTAM system. The FAA has requested the Direct entry Digital NOTAM (DDN) system be deployed and implemented at public use airports throughout the National Airspace System (NAS).

Purpose NISC was tasked with: Deploying and Implementing (D&I) the Direct entry Digital NOTAM system (DDN) at 11 FAA identified airports in the NAS Currently conducting a live test program to allow NOTAM entry from airport authorities directly in the U.S. NOTAM System (USNS) Receiving valuable feedback from participating airports Feedback is being evaluated, improvements are being made to the system

Aeronautical Information Management (AIM) National Airspace Implementation Support Contract (NISC) AIM Task Order signed March 18, 2010

New Concept of Operations DATALINK Web External AIM Web Page Service (AIXM) Legacy Formats Web service (AIXM) Originator Federal NOTAM System Enter NOTAMs at the Source Digital Capture (AIXM via templates) Process and Publish by FAA Integrated permanent and temporary information Computer readable Electronic distribution to customers

Digital NOTAMs Improve safety Improve accuracy Improve efficiency - Reducing errors and improve timeliness Improve accuracy - Less likelihood for human errors Improve efficiency - Less time to process Supports NextGen

Direct-entry Digital NOTAM System Will output the NOTAM in: U.S. domestic NOTAM format ICAO format Plain language format

NOTAM Details

What are the Benefits? Improves Safety Time reduction for pilots reviewing NOTAMs before flight Ability to sort NOTAMs Labor reduction Airport Operators Airline Dispatchers Cost savings due to more efficient operations

SAFETY RISK MANAGEMENT (SRM) 11

What is the purpose of the Safety Management System? (SMS) To create a safer NAS using a formal top down business approach to managing safety risk 12

HOW DOES SMS DO THIS? SMS addresses all aspects of ATC and navigation services including: airspace changes, air traffic procedures & standards, airport procedures & standards, new & modified equipment, and associated human interactions 13

HOW DOES SMS DO THIS? Helps reduce the number of isolated safety decisions (more efficient use of time & resources) Includes processes to collect & analyze safety data (tracking) Provides integrated collection of processes, procedures, policies & programs 14

The SRM process is a means to: Mitigate unacceptable safety risk and reduce the identified risks to the lowest possible level (Controls) Accept residual risks (SRMD) Implement the change & Track hazards to resolution (Safety Assurance) Assess and monitor the Effectiveness of the risk mitigation (Safety Assurance Audit & Evaluation Programs) Reassess change (Safety Promotion) Safety culture (supported through lessons learned) 15

SAFETY RISK MANAGEMENT DOCUMENT (SRMD) Tool for Decision Making An SRMD thoroughly describes the safety analysis for a proposed change Documents the evidence to support the proposed change Contributes to the decision to implement a change Accepted & approved by AIM August 2009 Intended for Large Airports with Continuously Operating ATCT’s 16

Direct Entry Digital NOTAM System Test for Large Airports SRMD DEN convened a Safety Risk Management Panel. Very lengthy, expensive process involving key stakeholders, Subject Matter Experts, and users. FAA Headquarters is using the DEN SRMD for all airports with 24 hr. ATCTs. FAA currently working on an SRMD for airports with less than 24 hr. ATCTs, and airports without ATCTs.

EXPECTED IMPACT OF DDN AT DEN Denver International Airport: Issues 5-6k NOTAMS per year 8 Minutes for 5k NOTAMS- 40k m or 667 hrs DDN – expect less than one minute. 5k m or less. or 83 hrs

Current Status Currently 10 airports are using the DDN NOTAM Manager System under the test: Atlantic City (ACY) Baltimore Int’l Thurgood Marshall (BWI) Denver Int’l (DEN) Fairbanks Int’l (FAI) Ft. Wayne Int’l (FWA) Memphis Int’l (MEM) Norfolk Int’l (ORF) Richmond Int’l (RIC) Ronald Reagan National (DCA) Washington Dulles Int’l (IAD)

Current Status Additional 14 airports ready to implement after server move to OEX: Louisville - Standiford (SDF) St. Louis Lambert (STL) Dallas Ft.Worth (DFW) Dallas Love (DAL) Ft. Worth Meachem (FTW) Ft. Worth Alliance (AFW) Houston George Bush Intercontinental (IAH) Houston Hobby (HOU) Ellington - Houston (EFD) San Francisco (SFO) Oakland (OAK) Chicago O’Hare (ORD) Phoenix Sky Harbor (PHX) Anchorage (ANC)

Current Process with Airports Establish contacts with airport managers and Air Traffic Control Tower managers Review NOTAMS previous 12 months Request current Airport Plan Map (ALP) Current Airport Signage Map ArcGIS Airport Diagram (NASR, etc.) Review NACO Diagram of Airport Layout

Initial Meeting Introduce NISC Team to airport personnel Build working relationships Validate all airport surfaces RWY TWY APRON RAMP

Data Preparation IT completion of ArcGIS build SRMD LOA MOA Training needs assessment Develop site specific training

Training and Test Implementation Train System Administrators Train NOTAM Issuers Implement NOTAM Manager Gather Feedback

Airport DDN Certification Plan Through automation and electronic media, NISC will facilitate airports with an Airport-Certification process. Through the use of a website airports will be able to validate airport surface areas and post required agreements. Training and deployments will be conducted via electronic media.

Airport Priority List for Test FAA Focus 30 Airports International Airports Airports with large numbers of NOTAMs ATCT 24/7 Less Complex ATCT 24/7 Less than 24/7 ATCT or non-ATCT Airports Airport NOTAM Certification (ANC) Plan - Developing Airport Certification Website

Reach out to other airports covered under the current safety case What’s Next? Reach out to other airports covered under the current safety case Finish Remaining Focus 30 Airports Secondary Focus airports with 24/7 towers that are listed on test NCP Following the completion of the additional safety cases we can begin deployment at: Facilities with Non-24 hour towers Tower Light (TLO) Operational Control Centers (OCC) Other NOTAM originators

QUESTIONS DDN NOTAM Manager Demonstration