Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.

Slides:



Advertisements
Similar presentations
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Advertisements

A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
1 PST Heaters 4 panels per segment along pixel support tube. Each segment is 236mm long at the moment. Copper-on-kapton. Nominal 20 ohms per full panel.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
M. Gilchriese Phone Meeting December 18, M. Gilchriese 2 PP1 Region Update “Bag” gas barrier Passive insulation? Region for external beam pipe supports?
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Installation of the T600 at Fermilab CSN2, September 22,
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
Design of the Injection Can
Update of MVD services and requests
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Development of a low material endplate for LP1 and ILD
LHC Experimental Vacuum Systems Status October ‘07
Integration issues at IHEP
TPC Support and Constraint TPC Support
ATL-IC-ES new version available - approval starts
Cryomodule Assembly Plan
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Patch Panel 1 Services and Beam Pipe Support Structure SCT Barrel TRT Forward Side CSide A Services and Beam Pipe Support Structure Pixel Detector TRT Forward

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, PP1 Region Functions Cooling connections Electrical connections Optical fiber connections N 2 connections Complete gas seal Complete electrical shield PP1 Region PP1b PP1a <- Towards IP

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, PP1 Requirements Provide cooling, electrical and fiber connections as specified in ATL-IP-ES-0007(“Pixel Services”) and described in ATL-IP-ES Gas seal for 4 mbar maximum pressure differential consistent with 6 l/mbar-hour leak from the pixel volume. Penetrations for cooling pipes to allow up to 3mm contraction from room temperature to cold temperature. Access to beam pipe adjustment & allowance for beam pipe survey. Cutouts for PST rails to allow pixel package insertion. Outer diameter consistent with insertion of pixel package with PP1 attached to service panels Electrical connection to PST and beam pipe EMI shields. Temporary support of beam pipe during installation of the pixel package.

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, PP1 Endplate Picture of prototype endplate. Machined aluminum, 6mm thick. Seal plates For cooling and gas connections Slots for fibers Slots for electrical feedthroughs For beampipe support and adjustment

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Coolant Fittings Lack of space, the need to allow contraction of the pipes and minimize forces on the endplate and the need for an electrical break requires us to use a custom fitting. PEEK seal to pipe Bellows for contraction of pipes upon cooldown Threaded insert into endplate Tube flared in place PEEK insert electrical break PEEK nut

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, More Coolant Connections Commercial fittings at PP1b desired but not yet selected Filter between PP1b and PP1a, also not selected. Custom wrenches for PP1a are needed (under design). Space is very limited. Same for PP1b? Not clear yet

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Electrical Feedthroughs Fabricated for simple functional tests and for mockup. –Connections to PP0(largely already made on prototype) –Thermal tests –HV isolation –Add PP1b connectors, read out real modules

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Optical Fibers Ericsson study of MT16 connectors with bare ribbons on the PP0 side and corresponding cables on the PP1a side. Mechanical(glued) interface to PP1 endplate slot.

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, PP1 Prototype Plan is to make enough coolant fittings for one quadrant. Custom bellows ordered Other parts either ready to order or sent to shops. Would then assemble into quadrant of prototype endplate to get experience. Current plan is to use paper(rad-hard and cheap) gaskets for seal. Will test this idea in small setup also after irradiation, in addition to full scale. Would mount endplate as shown with coolant connections(and blanked off electrical and fiber connections) to measure leak rate attached to 30cm PST prototype with flanges. Repeat after adding electrical connections. Fiber plan not yet clear – scope of Ericsson prototypes not likely to fill all of slot.

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Mockup at CERN Assembly started

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Cost and Effort Estimate Included in estimate: Bulkhead Bulkhead seal ring and gasket Bulkhead center support, bellows, connection to beam pipe Coolant pipe feedthrus (supply and return) Striplines Corrugated support for PP1b electrical cable connectors Full prototype of one PP1 quadrant Contingency Not included in estimate (as they are in other cost estimates): Fiber optic cables PP1a fiber optic cable feedthrus PP1a beam pipe adjusters PP1a to PP1b coolant pipes PP1b coolant pipe connectors PP1a to PP1b electrical cables PP1b electrical cable connectors PP1b filter/pressure drop devices

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Cost and Effort Estimate

Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, Conclusion Preliminary design of PP1 and related items well advanced. More work is needed to complete design. Prototypes of critical components either fabricated or under fabrication. 1-to-1 mockup assembly started at CERN Next major steps are to complete quarter-scale prototype and to finish mockup studies. Preliminary cost and effort estimate: –Total cost: $472K –Total effort: 27 FTE-months