API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.

Slides:



Advertisements
Similar presentations
Workshop on freight train derailments - Next steps - Emmanuel Ruffin Safety Unit 06 – 05 – st Workshop on freight train derailments N° 1.
Advertisements

COMPREHENSIVE MISSION COMMITTEE Committee formed at May 2011 BOR meeting Co-chairs: Deputy Commissioner John Cech MSUB Chancellor Rolf Groseth.
1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
Don Wells Hess Corporation
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
API Subcommittee 17 Industry Standards for Subsea Equipment
London Grid for Learning schools conference 30th april 2012.
API RBI Vision Updated 2006 API RBI is a Management Tool that is: The premier RBI methodology accepted worldwide by jurisdictions Involved in every mechanical.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Company Confidential Rewrite Team Proposal Tim Lee - OPMT.
Don Wells Hess Corporation
The Road to Version 3 27 th October  Created and maintained through a group of DIA (Drug Information Association) volunteers ◦ ~350 contributors.
ADOM Implementation Project Te Pou and Matua Raki Collaboration November 2011.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
1 SDS&ADaM sub-team 28 January 2004 Mineko FUJIMOTO Rieko ICHIHARA Kazue TOMITA Hiroaki MATSUDA.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.
Introduction to Proposed New July 22, This is a work in progress. Changes are happening based on field test and ongoing feedback.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Transit Bus Safety and Security Program Update AASHTO Standing Committee on Public Transportation Multi-State Technical Assistance Program (MTAP) Fall.
GIT 6 Update on Local Leadership Management Strategy Local Leadership management strategy submitted on December 15 th to Bay Program Office Management.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
19th January 2012 Don Wells (Hess)
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
1 International Education Standards for Professional Accountants Mark Allison, Executive Director Institute of Chartered Accountants of Scotland and Technical.
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Introduction : WEF Capital Project Complexity AA Packages Bulk materials BB SPAR Power- generation module Turbine generator package CC Valves, line pipe.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
What is an Integrated Management System? It is a management system that integrates all of an organization's systems and processes in to one complete framework,
knowledge, skills and good practice EI: Sharing energy knowledge… Delivering good practice and professionalism Energy Management Panel.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
Summary of discussions of the NGAP Implementation Working Group 6 and 7 December 2016 Mary Nelson – Implementation Working Group Chair 8th December 2016.
John Drengenberg Consumer Affairs Manager
Task Group Status January ,11, 2017
PEM PAL IA COP AiP Working Group Guidance to Audit Engagement Planning
API 17Q – Subsea Equipment Qualification
Task Group Status January 13, 2016
Summary of JIP Objective:
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
Status Update on API 16Q / 16R / 16F
JRC’s Follow-up work to improve GES assessment
International Subsea Standardization
Progress Report on proposed GUID on Information System Security Audit
First 8 slides are what was presented in San Fransisco…
Violation Risk Factor (VRF) Tool Update March, 2010
Progress Works, recommendations and future work programme
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Reliability Standards Development Plan
Don Wells Hess Corporation
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
Do more. Share more. Be more
Portfolio, Programme and Project
WG GES: Decision review progress
Discussion Points API RP 17A Task Group Members
Scene setter European Commission DG Environment
NICE has many methods and processes
Task Group Status January 2013
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
API 17P TASK GROUP June 26, 2013.
John Drengenberg Consumer Affairs Manager
Presentation transcript:

API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011

Progress November API RIMS Charter drafted 1st Dec Kick off Meeting – Committee members appointed by Chair/Co-chairs – API 17 RIMS charter circulated and comment invited – Inputs expected from 2 SURF IM JIPs recently kicked off – Additional committee members to be invited as needed depending on experience and expertise – Committee members invited to: Review current version of 17N Review Charter draft Issue comments and suggestions to John Strutt Committee to present proposals and updated charter to API working group by the end of January Next Meeting tentatively scheduled mid-February 2011

Initial Committee Goals Identify best practice and improvements to the management and assessment of Subsea reliability, technical risk and operational Integrity in Subsea industry Develop guidance on management practices and tools to assess, optimise, manage and meet safety, environment and production goals. Identify improvements to the alignment of reliability and integrity management activities during design and operational stages Provide guidance which will deliver better: – leadership and direction, Consistency and coherence between the project and Operations teams and Feedback and Learning

Additional Goals Update section on use of TRL in qualification of New technology and align with new DNV A 203 – New version of DnV A203 soon to be issued Provide improved guidance on relevant reliability data and use of reliability and Integrity assessment tools Align with new BOEMRE NTL – probably to be issued in Q Integration of API 17N with standard ISO (Jans Neurenkerken) Provide input to and guidance on the implementation of API 17N RIMS training programmes

Committee Members Mark SiegmundChair (BP) John AllenCo-Chair (GE) Don WellsCo-Chair (Hess) John StruttChampion (Astrimar) Adriana BottoSecretary (WGIM) Ken PowellMember (Cameron) John FasseroMember (EXM) Karina VitaleMember (CVX) John MacNeillMember (Stress) Graeme DaviesMember (DNV) Runar Ostebo Others:? (aiming for 20-22) Member (Statoil) Shell, Teledyne, FMC, Atkins, Woodside, Petrobras, TBA…