Updates on Pakistan Kidney Centre (PKC)
PKC Introductory Function July 2012
Donation Database Donor Information DatabaseBank Transfer DetailsCost Schedule
PKC Site Location
Inauguration Ceremony Foundation laid by Dr. Abdul Qadir Khan On December 02, 2012
Key Operational Dates Fully Functional: December 2014 Out Patient Dept. (OPD): March 2014 Mobile Field Hospital: March 2014
Architectural and Structural Design: Designmen Ltd, Islamabad Construction Contractors: Capital Construction Ltd, Islamabad
Expenditure Details
Target - A (up to 03 August)
Target -B (03 August to September)
Project Execution Plan
Our Final Goal, insha’ Allah “…if anyone saved a life, it would be as if he saved the life of the whole people” Quran (5, 32).