BAPA Business Advertisement / Promotion Application By Will Dombrowski Dave Ladao ACS560 Software Engineering.

Slides:



Advertisements
Similar presentations
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Advertisements

Supporting Programmers in Naming Identifiers Surafel Lemma Abebe and Paolo Tonella Software Engineering Research Unit Fondazione Bruno Kessler Trento,
[Product Name] Marketing Plan
School of Engineering & Technology Computer Architecture Pipeline.
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
National Aeronautics and Space Administration Systems Engineering (SE) Tools National Aeronautics and Space Administration Example.
Chapter Nine Project Scheduling 9-3 Gantt Chart for Five Activities (Refer to Example 9.1) Fig. 9-1.
Project Management 30 January. Odds and ends Tournament on the webweb In the newsnews.
Mary Lou Maher University DECO2005, Semester 2, 2005 Project Management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management.
Approaches to System Development Chapter 3. Methodologies, Models, Tools and Techniques A system development methodology –provides guidelines to follow.
PROJECT MANGMENT SAMPLES By: Prof. Lili Saghafi. Contents of a Scope Statement Contents and length will vary based on the project. Typical contents include:
Telecom Grade Cloud Computing László Szilágyi 26 April 2013.
Recreation and Wellness Intranet Project
* Plan for mechanics * Problem statement * Design concept * Literature search * Project management * Coordination.
Electronic CommerceNonhlanhla Shongwe  Introduction  Mission statement  Product  Business model  SWOT Analysis  Conclusion.
Project Management for Software Engineering Starting at “I’ve got a project” How do you decide: –What do I need to do? –When should I do it? –How long.
Lecture4 : Project planning Lecturer: Kawther Abas 447CS – Management of Programming Projects.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
ME 481 Mechanical Engineering Design Projects Project Management.
TextMonTuesWedThursFriSatSun Text example GANTT CHARTS Example text Text.
Computer Science and Engineering Parallel and Distributed Processing CSE 8380 March 01, 2005 Session 14.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
Request for Proposal (RFP)
Software Engineering 1 The Life Cicle of Software Lesson 4.
CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Class Project – Software Development Plan Class will start momentarily. Please Stand By … CS.
David Hans Tracking and Updating with Project Server The Project Update Cycle Best Practise v Reality 11 th February 2004.
Project Management Theory. Planning a Project Identify the problems and inefficiency of system. – Design brief Design brief: A statement that contains.
National Science Foundation Industry/University Cooperative Research Center for e-Design Strategic Planning Meeting – July 31 st & August 1 st, 2013 National.
ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011.
MSD Total Supplier Performance and Inventory Control
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
The Software Engineering Process Discussion Slides.
Monica Gloudemans Ekaterina Schwartz Gloudemans/Schwartz ACS 560 CMAP.
BAPA Business Advertisement / Promotion Application By Will Dombrowski Dave Ladao ACS560 Software Engineering.
The 3 P’s Introduction Graphic Communication uses what is collectively known as the 3P’s: Preliminary Production Promotional graphics. We will look at.
Student name Student ID Degree program Area of specialization.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Presented BY SIVA S Zinavo Technologies PAY PER CLICK.
MGT 450 Week 4 Quiz New Check this A+ tutorial guideline at 1. Ultimate responsibility.
Introduction to Android Programming. Features of Android.
Chapter 7: Introduction to Data Communications and Networking
Student name Student ID Degree program Area of specialization
Software Project Planning and Tracking
Patricia Lago: now Teaching interests: Research interests:
Business Advertisement / Promotion Application
GANTT CHART Text Text Example
GANTT CHARTS Example Example Example Example text Tasks Example 1
Unit 4 Project Design, implementation and evaluation
(b) (ii) Project Plan.
BSCOM 300 RANK Lessons in Excellence--bscom300rank.com.
BSCOM 300 RANK Education for Service--bscom300rank.com.
Design Analysis.
Student name Student ID Degree program Area of specialization
Group Activity Discuss major challenges AND things your organizations are doing well. Develop a vision for your community. Identify one or two concrete.
Performance– Meaning and Metrics
r4=2 c4=1 r2=1 d4=6 c2=2 d2=5 r5=2 c5=1 d5=8 r1=0 c1=2
CIS 210 Systems Analysis and Development
Project Name Group Members.
The Software Engineering Process
FYP II PROJECT TITLE References Abstract Introduction
Footprinting. Сбор данных
Google POV Google 0.1 Understand the structure of links on the web.
FSTM FYP 1 PRESENTATION SESSION /2019
FSTM FYP 1 PRESENTATION SESSION /2019
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Company and Marketing Strategy
Networking Super Power
Y12 Business Studies All: Review Mission / Vision and SMART objectives
Presentation transcript:

BAPA Business Advertisement / Promotion Application By Will Dombrowski Dave Ladao ACS560 Software Engineering

BAPA Introduction Location-Based Advertising Consumers can filter to display advertisements relevant to their interests. Producers can view metrics to determine consumer interest in their promotions. Social networking aspects such as ranking results and sharing favorites.

Completed Tasks Vision Statement v1.1 Application Architecture v1.1 Software Requirement Specification v1.3 Project Management Plan v1.0 Gantt chart v1.0 DSM, Design Matrix, FMEA ~ v1.0 Research

Immediate Plan SRS v2.0 PMP v2.0 More Research Gantt chart (plan into the future)