For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.

Slides:



Advertisements
Similar presentations
Copyright© 2003 John Wiley and Sons, Inc. Power Point Slides for: Financial Institutions, Markets, and Money, 8 th Edition Authors: Kidwell, Blackwell,
Advertisements

The Single Electricity Market in Ireland
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Integration of Physical and Financial risk in Australia’s National Electricity Market Les Hosking Managing Director and CEO NEMMCO.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
The Competitive Effects of Ownership of Financial Transmission Rights in a Deregulated Electricity Industry Manho Joung and Ross Baldick Electrical and.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Concerns with RUC Capacity Short Charge and Energy Trades.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Introduction to Derivatives and Risk Management Corporate Finance Dr. A. DeMaskey.
EIUG – Wheeling Methodologies
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
1 Singapore Update Presented by Dave Carlson Chief Executive Officer 30 October.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Effects of the Transmission Network on Electricity Markets © 2011 D. Kirschen and the University of Washington 1.
EE 369 POWER SYSTEM ANALYSIS
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Australia’s energy markets: change and challenge JOHN TAMBLYN CHAIRMAN AUSTRALIAN ENERGY MARKET COMMISSION ASSOCIATION OF POWER EXCHANGES OCTOBER.
Deregulated Power, Pollution, and Game Theory Frank Deviney 11/16/05.
Nodal Pricing in an LMP Energy Market
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
World Forum on Energy Regulation IV Athens, Greece October , 2009 "Reducing Regulatory and Technological Barriers to Demand Side Participation“
Seams Issues Raymond DePillo Vice-President – Power Operations and Asset Management PSEG Energy Resources & Trade LLC October 7, OPSI Annual.
Reliability Charge Colombia, an investment oportunity Paris, Octuber 15-16th, 2007.
Australian Energy Market Commission Congestion Management Review and related projects ACCC Regulatory Conference Thursday, 26 th July 2007.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
Bulk Power Transmission System
California Independent System Operator A Comparison Between The CA ISO’s Market Design 2002 Proposal (MD02) and the FERC’s Standard Market Design (SMD)
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Demand Response: Next Steps OPSI Annual Meeting October 1, 2012 Howard J. Haas.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Overview of Market Reforms and the WESM
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
CRR Deration and NPRR821 WMS 09/06/2017.
FERC Standard Market Design Working Papers
Further Information on MISO FTR Auctions
Electricity Wholesale Markets: Designs for a low-carbon future
Strategies of Reliable Transmission of Energy In A Competitive Market
Transmission Pricing & Regional Electric Markets
Presentation transcript:

For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009

© Transpower 2009 For discussion purposes onlyslide 2 Background Transpower was asked for advice on how to: –Simplify and make 2002 FTR more appealing to participants –Deal with Dr Read’s 2002 concerns –Implement an FTR market

© Transpower 2009 For discussion purposes onlyslide 3 Background Transpower’s advice is a suggested starting point for discussion Pricing should reflect underlying physics FTRs are internally consistent with locational marginal pricing Regulatory arrangements are different to 2002 FTR trading platform can be significantly simplified without affecting dispatch Start simple and evolve with users

© Transpower 2009 For discussion purposes onlyslide 4 What is the problem? Nodal prices are consistent with physical dispatch (i.e. they obey the laws of physics!) Locational price differences are caused by constraints in the transmission system NOT energy availability Commercial implications of transmission constraints: –Bilateral contracts can only hedge energy costs –Volatile and unpredictable locational price differences must be hedged separately

© Transpower 2009 For discussion purposes onlyslide 5 What is the problem? There is little ability to hedge locational price difference Incentive is to vertically integrate and regionalise generation and retail Consequences: –At best a partial locational price hedge –Barrier to retail competition –Significant cost to consumers –Inefficient use of transmission assets

© Transpower 2009 For discussion purposes onlyslide 6 What are the possible solutions? Remove locational price differences altogether –Removes demand side response Use “rentals” to fund a hedge product –The net amount that needs to be hedged is EXACTLY the rentals collected –Preserves demand side “signals”

© Transpower 2009 For discussion purposes onlyslide 7 Report Structure Part 1 – what is an FTR? How do they fit into integrated market design? Part 2 – design options Part 3 – implementation options

© Transpower 2009 For discussion purposes onlyslide 8 Markets with locational marginal pricing A system for the efficient trading of electricity using supply and demand to set price Separate contestable and monopoly functions Characterised by “spot prices” that differ by location Wholesale market = competitive trading Retail market = customer choice

© Transpower 2009 For discussion purposes onlyslide 9 Integrated market design Co-ordinated spot market Bid-based, security- constrained, economic dispatch with nodal prices ENERGY PRICING Bilateral contracts at nodal price differences TRANSMISSION PRICING Non-distortionary access charges NEW INVESTMENT Market-driven RISK MANAGEMENT Hedge against locational price differences NEW GENERATION Location and timing NEW TRANSMISSION Location and timing DEMAND SIDE PARTICIPATION NEW TRANSMISSION Centrally planned, regulatory process, TPM TRANSMISSION CONGESTION FTR, LRA, vertical integration RISK MANAGEMENT Hedge against locational price differences TRANSMISSION CONGESTION FTR, LRA, vertical integration

© Transpower 2009 For discussion purposes onlyslide 10 Physics – Kirchoff’s law This means that... –Every injection into and off-take from the grid effects electricity flows on every circuit –Physical capacity rights cannot be meaningfully defined Which leads us to constraints and nodal prices...

© Transpower 2009 For discussion purposes onlyslide 11 Commercial risk Kirchhoff's law and the occurrence of constraints create commercial risk: –Actions of other parties can impact on nodal price –Constraints impact on nodal prices Two primary risk management tools –Bilateral energy contracts referenced against price at a node (often internalised by vertical integration) –Hedge to manage locational price risk arising from constraints

© Transpower 2009 For discussion purposes onlyslide 12 Energy contract – example 1 Generator Offered at $2 300 MW dispatched Load 300 MW 200 MW 100 MW At limit $2 Vertically integrated utility generates at A, commitment of 300 MW at $2 at B Generation: Cost to generate at A:-$600 Gets paid at A $600 Retail: Buys 300MW from A -$600 Gets paid for 300MW at B: $600

© Transpower 2009 For discussion purposes onlyslide 13 Energy contract – example 2 Third party load increases at B Generator 1 Offered at $2 240 MW dispatched Load MW 200 MW 160 MW 40 MW Constrained Generator 2 Offered at $3 120 MW dispatched $2 $4 $3 Load 2 60 MW Line A – B constrained Price at B increases to $4 Retailer can’t meet obligation of 300MW at its generation cost of $2 to load at B ($600) To meet obligation of 300MW at B retailer must purchase all 300MW at B for $4 ($1200) Additional cost to gentailer is equivalent to the rentals of the system ($600)

© Transpower 2009 For discussion purposes onlyslide 14 From an energy contract perspective The transmission price risk between A and B is the price difference B − A –Generation at A cannot offer an energy contract referenced at B without taking the transmission price risk –Load at B cannot accept an energy contract referenced at A without taking the transmission price risk Generator 1 Offered at $2 240 MW dispatched Load MW 200 MW 160 MW 40 MW Constrained Generator 2 Offered at $3 120 MW dispatched $2 $4 $3 Load 2 60 MW

© Transpower 2009 For discussion purposes onlyslide 15 How can A or B manage the transmission price risk? Either A or B needs a financial product that recompenses the value (PriceB - PriceA)/MW. –Generation at A can then offer a fixed energy price at B, or –Load at B can accept a fixed energy price hedge referenced at A The only cash stream correlated with nodal price differences is the rentals FTRs use this correlation to hedge price differences

© Transpower 2009 For discussion purposes onlyslide 16 Energy price hedge values differ by location and over time

© Transpower 2009 For discussion purposes onlyslide 17 Features of FTRs – trading risk Can be matched to an energy contract of a specified capacity and duration between two nodes – near perfect hedge Holder receives the rentals between two specified points for an agreed capacity and duration Protect the holder against extreme price risks (constraints, scarcity pricing) Can be allocated explicitly and/or through an auction Traded in secondary auctions or markets Only known product that exploits correlation of rentals with locational price differences

© Transpower 2009 For discussion purposes onlyslide 18 Features of FTRs – efficient investment Grid could operate with more constraints (more efficient) Signal the market value of constraints (FTR auction value) Provide an important economic signal to assist with the correct location and timing of new transmission investment

© Transpower 2009 For discussion purposes onlyslide 19 Rental flows without FTRs Electricity market Rentals allocation mechanism (TPM) Rentals Those who pay for transmission Allocation minimises impact on nodal prices – not paid to energy purchasers

© Transpower 2009 For discussion purposes onlyslide 20 FTR market participants Rentals Residual revenue Post allocation mechanism Electricity market participants FTR Auction mechanism FTR pre- allocation mechanism (optional) Auction revenue Net revenue Auctioned FTRs Preallocated FTRs FTR payments Cash flows with FTRs FTR rentals + premium FTR rentals Rentals + premium

© Transpower 2009 For discussion purposes onlyslide 21 Design emphasis? Merchant new investment? –Network investment governed by Part F of EGRs –Merchant investment in connection assets possible (probable?) –Allocation of FTRs to investors not high priority in short term Locational hedging –Reduce reliance on physical hedging –Reduce barriers to new retail entry (increased competition) –Provide means to fully hedge against transmission congestion High degree of user influence on design Start simple and build with experience and need WHAT DOES THIS MEAN FOR DESIGN?

© Transpower 2009 For discussion purposes onlyslide 22 New Investment New investment –Merchant investment no longer the primary mechanism for transmission upgrades –Allocation of FTRs to investors not high priority in short term Pre-allocation of FTRs Pre-allocation to investors No pre- allocation 2009 FTR recommendation 2002 FTR design

© Transpower 2009 For discussion purposes onlyslide 23 Coverage Node to node, hubs and nodes, hubs only Market power? Start simple FTR coverage 2002 FTR design High coverage, Complexity Low coverage, Simplicity 2009 FTR recommendation HVDC only 2 hubs Large hubs Small hubsInterconnected grid Whole grid

© Transpower 2009 For discussion purposes onlyslide 24 Constraints only? Losses should be reasonably predictable Constraints are not predictable FTRs with losses are complicated and confusing Losses and constraints 2002 FTR design Constraints only 2009 FTR recommendation

© Transpower 2009 For discussion purposes onlyslide 25 Revenue adequacy Dependent on FTR grid design Incorrect grid outage assumptions, unplanned outages, emergencies FTR Revenue Risk 2002 FTR design To FTR market participants To FTR market operator/grid owner 2009 FTR recommendation

© Transpower 2009 For discussion purposes onlyslide 26 Revenue adequacy PJM, CAISO, MISO –FTR Credits are prorated proportionally Payments derated when revenue shortfall occurs Excess rentals and auction revenue occurring over a month are transferred to a balancing fund At end of period balancing fund is used to clear unpaid FTRs (pro rata) –NYISO Revenue shortfall is compensated for by imposing an uplift charge on transmission owners Attempts to link transmission maintenance standards with revenue adequacy

© Transpower 2009 For discussion purposes onlyslide 27 Revenue adequacy in PJM

© Transpower 2009 For discussion purposes onlyslide 28 FTR Duration Any duration required Start low for accelerated learning Change with market requirement FTR duration 2002 FTR design Long duration Short duration 2009 FTR recommendation Hours WeeksMonthsYearsDecades 1 Month

© Transpower 2009 For discussion purposes onlyslide 29 Obligations or options? Obligation FTRs can become a cost (obligation FTRs are directional) Obligation FTRs still hedge price difference even when –ve Option FTRs always cash positive BUT lower capacity and computationally different Options Obligations or options Obligations 2002 FTR design 2009 FTR recommendation

© Transpower 2009 For discussion purposes onlyslide 30 Post allocation of residual revenue Any allocation possible Change results in value transfers Simplest approach is to initially make no change Pre-allocation of FTRs Pre-allocation to investors No pre- allocation 2009 FTR recommendation 2002 FTR design

© Transpower 2009 For discussion purposes onlyslide 31 Implementation Transpower’s system is “up and running” Can assist establishing an FTR market quickly if required Transitional arrangements could see separation of systems from Transpower