EGEE-III INFSO-RI-222667 Enabling Grids for E-sciencE www.eu-egee.org EGEE and gLite are registered trademarks LHCOPN Ops WG Act 4 – Conclusion Guillaume.

Slides:



Advertisements
Similar presentations
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Network trouble ticket standardisation -
Advertisements

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
INFSO-RI Enabling Grids for E-sciencE Incident Response Policies and Procedures Carlos Fuentes
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operations update Guillaume Cessieux.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Romanian SA1 report Alexandru Stanciu ICI.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What GGUS can do for you JRA1 All hands.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Ops WG Act 5 Guillaume Cessieux (CNRS/IN2P3-CC,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks PPS All sites Meeting: Introduction & Agenda.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROD model assessment ROC UKI John Walsh.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Kelsey RAL/STFC,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
EGEE-III Enabling Grids for E-sciencE EGEE and gLite are registered trademarks 2008 report on LHCOPN from ASPDrawer
LHCOPN operational working group Guillaume Cessieux (CNRS/FR-CCIN2P3 – EGEE SA2) third meeting CERN – December th, 2008
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team James Casey EGEE’08.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Service Availability Monitoring – Status.
Enabling Grids for E- sciencE EGEE and gLite are registered trademarks EGEE-III INFSO-RI Analysis of Overhead and waiting times.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Overview of STEP09 monitoring issues Julia Andreeva, IT/GS STEP09 Postmortem.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Report from GGUS BoF Session at the WLCG.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Stephen Childs Trinity College Dublin &
LHCOPN operational working group report Guillaume Cessieux (FR-CCIN2P3 / EGEE-SA2) on behalf of the Ops WG LHCOPN meeting, , Copenhagen.
NORDUnet Nordic Infrastructure for Research & Education Workshop Introduction - Finding the Match Lars Fischer LHCONE Workshop CERN, December 2012.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Network activity overall Xavier.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks DSA1.4 – Objectives and Status Ioannis Liabotis.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Regional Dashboard Cyril L’Orphelin - CNRS/IN2P3.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Xavier Jeannin (CNRS/UREC Paris, FR) 24.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Task tracking SA3 All Hands Meeting Prague.
DTI Mission – 29 June LCG Security Ian Neilson LCG Security Officer Grid Deployment Group CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC - Status and plans Guillaume Cessieux.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Standard network trouble tickets exchange.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks John Gordon SA1 Face to Face CERN, June.
WLCG Service Report ~~~ WLCG Management Board, 16 th September 2008 Minutes from daily meetings.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Communication tools between Grid Virtual.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Operations procedures: summary for round table Maite Barroso OCC, CERN
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Alistair.
LHCOPN: Operations status LHCOPN: Operations status cc.in2p3.fr Network team, FR-CCIN2P3 LHCOPN meeting, Barcelona,
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Ian Bird All Activity Meeting, Sofia
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2: Dissemination Outreach & Communication Hannelore Hämmerle – NA2 Activity Manager.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Patch Preparation SA3 All Hands Meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks A three years thorough review of a project’s.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks MSA3.4.1 “The process document” Oliver Keeble.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1 & SA2-ENOC Interactions status and plans.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operations WS: Introduction & Objectives.
LHCOPN operational model - 4 use-cases Guillaume Cessieux (FR-CCIN2P3 / EGEE networking support) on behalf of the Ops WG LHCOPN meeting, , Berlin.
SA2 All Hands Meeting — V. Konoplev — 27 March 2009 – Rome Enabling Grids for E-sciencE Veniamin Konoplev (RRC-KI) All Hands meeting GARR/Rome.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 Resources Robin McConnell.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Best Practices and Use cases David Bouvet,
LHCOPN operational model Guillaume Cessieux (CNRS/FR-CCIN2P3, EGEE SA2) On behalf of the LHCOPN Ops WG GDB CERN – November 12 th, 2008.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC model assessment AP ROC ShuTing Liao.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks COD-17
INFSO-RI Enabling Grids for E-sciencE GOCDB2 Matt Thorpe / Philippa Strange RAL, UK.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Trouble Ticket exchange standardization Mathieu.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC status LHC-OPN meeting – ,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operating an Optical Private Network: the.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks An insight into GOCDB for ROD Operators.
LHCOPN operational handbook Documenting processes & procedures Presented by Guillaume Cessieux (CNRS/IN2P3-CC) on behalf of CERN & EGEE-SA2 LHCOPN meeting,
LHCOPN Operations: Yearly review
Presentation transcript:

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Ops WG Act 4 – Conclusion Guillaume Cessieux (FR IN2P3-CC, EGEE SA2) CERN

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Twiki not designed to be a database –But previously really convenient  Lot of work to switch – currently kept – Process to review information to be proposed  Assign informational tickets to sites with all links into Responsibilities and validations –Long term  Switch to a real constrained database  Implement proper AuthN and AuthZ –Template for backup tests to be more constrained FAQ –Primary link down: Connectivity vs performance - Unclear –Precise how and where updating all required information on twiki 2

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Webcalendar –Lot of event but only past – should not be so disturbing  Potential wish list Timezone handling (Filter events by sites) Hyperlinks on processes’ picture –Very good idea, sadly not technically currently achievable  Long term… 3

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Around GGUS –Ask them for possible automatic twiki update on change management  Could not CMDB be only a particular view of change’s tickets? We have no longer change tickets – tick a box to request info stored Avoid duplicating information Might require migrating CMDB somewhere else –Downtimes of TTS to be handled with informational tickets  No notification to sites only for the record –Keep ENOC/DANTE notification fields –Ask details to TW-ASGC for their requested monthly report –Notifications to be tested every 3 months  Also access to information repositories: twiki, monitoring information etc. –Timezone: Enable submitting in the timezone you want  Long term: User based timezone preference for everything –Level of support to be discussed with them to arbitrate our requests  Separate bugs resolutions from enhancement requests –Could we ensure maintenance delay windows are respected? –New possible status “escalated” needed on tickets 4

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX T1-T1 issues –Put and document responsibilities on T1-T1 links  Even arbitral to start What is a LHCOPN links –Part of “network specifically put in place to allow distribution of data from T0/T1” – dedicated links only –Each sites to monitor its flows to ensure LHCOPN is not bypassed or misused 5

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Security –Existing security groups to be involved  What are traffic patterns to be allowed on the LHCOPN  How to handle security events - Is our model fine and enough? –If filtering to be set up better before LHC start-up...  Firewalling complex (and expensive) Unexpected events –Any event with an impact on the service should be reported and followed  1 ticket per issue not per event  Having complicated links is not an excuse :) 6

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Create fake event if no events to test ops processes –But not affecting services –“Unexpected backup tests” Process to put links in production to be shortly documented –Best practice only, not rules enforced –1 week monitoring before claiming production quality seems reasonable 7

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX KPIs (1/2) KPIs for operation, not infrastructure quality Two kind of KPIs 1.We want to measure way processes are implemented  Pure ops KPI  Beware processes are not only tickets 2.And to correlate what we handle with what really occurs  Correlated KPI  Need data from monitoring View per sites needed –Then where to account T1-T1 things? Problems –Tools not constrained enough to provide really meaningful indicators –We only measure what we see... 8

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX KPIs (2/2) 1.Pure ops KPIs –Problems durations –Number of reported problems lasting more than one week –Are maintenance delays respected 2.Correlated KPIs –Provide a mapping of link status and tickets on a timeline  Per linkID  Need monitoring information available in a exploitable format Beginning with low granularity –No in-depth analysis –Will be improved in the future with more details 9

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Periodical ops phoneconf –Review infrastructure and ops behaviour  Goal: To improve ops and infrastructure –Focus on issues –CH-CERN to support that –15:30 UTC seems most convenient  Site unable to attend welcome to submit through –TBD during next LHCOPN meeting Enforcement of backup test –Now ideally before service challenge in June... –Backup link of UK-T1-RAL should hopefully appear before –3 months left before stressing the infrastructure 10

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Ops WG meetings –Why not more involvement from sites?  Is this only travelling issues?  TDB at next LHCOPN meeting –What about doing them before LHCOPN meetings  Also mixing f2f and phoneconf meetings DEISA – PRACE etc. –Investigate collaboration LHCOPN meeting –No possible convenient location for everyone :( 11

Enabling Grids for E-sciencE LHCOPN Ops meeting 4, CERN, GCX Conclusion Lot of things discussed –Lot of things put in “long term requirements”  Maybe we miss some short term improvements Ops should be ready for service challenge in June! See you in Amsterdam! 12