What is your IST Organizational Culture like? by NextEra Energy Seabrook Station LLC Bob Parry, Tim Couture, and Debbie Masters Inservice Test Owner’s.

Slides:



Advertisements
Similar presentations
24/7 Systems Mission Integrate, communicate, and analyze PLANT RELIABILITY INFORMATION From multiple plant condition, repair, overhaul, installation, and.
Advertisements

Building a Cradle-to-Grave Approach with Your Design Documentation and Data Denise D. Dion, EduQuest, Inc. and Gina To, Breathe Technologies, Inc.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Job Search Accountability A presentation on how to facilitate reviewing and mentoring members' job search progress at weekly meetup groups. Ron McClure,
Software Quality Assurance Plan
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
EQUIPMENT VALIDATION.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O BJECTIVES AND D ESCRIPTION OF THE CDM O PERATIONS P LAN.
A A A N C N U I N F O R M A T I O N T E C H N O L O G Y : IT OPERATIONS 1 Problem Management Jim Heronime, Manager, ITSM Program Tanya Friehauf-Dungca,
Pipeline Personnel Qualification
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Requirements Elicitation Chapter 4. Establishing Requirements Two questions –What is the purpose of the system –What is inside and what is outside the.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
Project Management Solutions Using SharePoint April 14, 2010.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Chapter 4 Interpreting the CMM. Group (3) Fahmi Alkhalifi Pam Page Pardha Mugunda.
Introduction to Software Quality Assurance (SQA)
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Maintaining Information Systems Modern Systems Analysis and Design.
N By: Md Rezaul Huda Reza n
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
1 Project Name Team Lead Location Month XX, Year.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
FIRE PROTECTION TOPICS OF INTEREST Defense Nuclear Facilities Safety Board.
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
Leadership and Culture SEA Managed Process Continuous Improvement Process Presented May 24, Phone: 1(203)
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Develop Project Charter
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
AIRCRAFT RELIABILITY Y.K.Sinha Rajalakshmi Engineering College AIR TRANSPORTAION AND AIRCRAFT MAINTENANCE (AE1012)
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Session 6: Data Flow, Data Management, and Data Quality.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
System Development Life Cycle (SDLC). Activities Common to Software Projects Planning : Principles Principle #1. Understand the scope of the project.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
 System Requirement Specification and System Planning.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Iterative Risk Management Workflow Tool
Software Project Configuration Management
2016 Maintenance Innovation Challenge
Software Engineering (CSI 321)
Current Plant Performance
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
IEEE Std 1074: Standard for Software Lifecycle
Flooding Walkdown Guidance
Overview – Guide to Developing Safety Improvement Plan
NRC CM Pilot Inspections Methodology and Results
Overview – Guide to Developing Safety Improvement Plan
Ageing Management Session Name: Principles of Ageing Management
Maintaining Information Systems (SAD- 18)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Jim Powers - Director, Fleet Engineering
Workshop 1: Processing Facility Configuration Information
Vendor Technical Information
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

What is your IST Organizational Culture like? by NextEra Energy Seabrook Station LLC Bob Parry, Tim Couture, and Debbie Masters Inservice Test Owner’s Group (ISTOG) Meeting December 2010

2 Organizational Culture –the shared basic assumptions that are developed in an organization as it learns and copes with problems. –the basic assumptions that have worked well enough to be considered valid are taught to new members of the organization as the correct way to perceive, think, act, and feel. Safety Culture –An organization’s values and behaviors – modeled by its leaders and internalized by its members – that serve to make nuclear safety the overriding priority. INPO’s Principles for a Strong Nuclear Safety Culture Safety Culture

3 Who owns the IST Issues? –IST Engineer? –Component Engineer? –System Engineer? –Maintenance Engineering or even from a Broke/Fix standpoint, Maintenance? Each site will have their own unique issues, or culture. –Work in progress, constantly evolving as we address issues Detailed Program Documents will help improve your IST Culture: –IST Program Bases Document (LAN) to show what is/what is not/and why. –IST Database (LAN) with adequate depth of content. –IST Implementing Procedures – Generic, Pump, Valves. –Visible Interface with other key groups on site. IST Culture – Issues A Team Effort?

4 Instruments used for IST out of tolerance – Adverse trend? What is the interval? First time event? Stroke Time – What is the trend? How to know when it is adverse – what rules are applied? IST Pump - Close to ALERT value, or fails surveillance test – What was the trend? What/who is tracking the issue? Relief Valve fails setpoint test – Repeat? Contingency? Expanded Scope? What other valves are impacted? What S/N is involved? Relief Valve not tested within required timeframe – How and who is tracking? Change in model? Check Valves – How to describe Check Valve Condition Monitoring activities – Forward, reverse, interval, PMT issues? IST Culture Some Seabrook issues where we are working to get ahead of the issue

5 IST Culture – Issues Instrumentation Pumps –Recent IC Design calculations for Accuracy –IC Maintenance Procedures or PM Tasks scheduled in Work Management process –Protected steps for key attributes – M&TE, intervals, when to adjust, etc. –Known locations for this info. –Reviewed by IST Group for acceptability. –Adequate Technical Rigor used in these reviews? Partnering with Pump and System Engineer for margin issues? (KPIs) –Database feature – select by instrument, historical sheet showing AF/AL results, past AR’s and corrective actions. –OX contains all relevant acceptance criteria info – used as the technical bases for Operations.

6

7

8 IST Culture – Issues Stroke Time Variations What has the historical trend been? Slow and gradual?, versus sudden step? Margin issue? How determined? “At- a-glance”, or graphical, or statistical analysis? When does troubleshooting begin? Some valves, like AOVs, require partnering with Program Engineer (KPIs) Immediate retest performed? Control Room or local? Database feature – graphical presentation OX contains all relevant acceptance criteria information – used as our technical bases for Operations.

9

10

11

12

13

14

15 IST Culture – Issues Pump Issues Hydraulic Condition – what is the bases? –Degradation taken in long term view (e.g. stair step versus basement view), Head curve as original test bases? (KPIs) –Scatter issues used to improve test methodology? Mechanical Condition – –Smooth running pumps and use of analysis being identified as margin issue? –Design issues identified with corrective actions? –Operations interface – ON LINE versus Outage –Baseline procedure protocols Shop head Curve test with vibrations as practical In situ Head Curve performed with IST (patience) CBM taking vibrations and performing analysis

16 IST Culture – Issues Pump Issues IST Database features –Reference Values –Test Results –Instrumentation OX SS-EE Engineering Systems Minimum Performance

From Program Plan

18

19

20

21 IST Culture – Issues Relief Valve Issues Database demonstration –Spreadsheet Concept Group, Model, AF/AL, S/N, when tested, Contingency and outage sequencing

22

23

24

25 IST Culture – Issues Relief Valve Issues RV Issues –Some Design changes to replace obsolete valve designs Change in trending –Standardization of tail pipe to permit interchangeability –Outage Planning for failures – train rolls, additional testing. –Not much expanded acceptance criteria (PZRs, MSSVs for AF testing) –Hot/Hot Testing –ES Procedure, EX for IST Valves –Tracking of AL post refueling Outage?? In house AR PZRs shipped

26 IST Culture – Issues Check Valve Condition Monitoring Issues Two separate databases –One on LAN and one in Group Drive –Needed increased visibility Database Demonstration –Analysis bases –Forward Activity – by activity/interval –Reverse Activity – by activity/interval Technical Rigor –Two person review – next outage focus. Instrumentation issues – instrument accuracy

27 IST Culture – Issues Check Valve Condition Monitoring Issues IST Database denotes the valve is in Check Valve Condition Monitoring Active button opens the Check Valve Condition Monitoring Database for information on the Check Valve

28 IST Culture – Issues Check Valve Condition Monitoring Issues Initial Grouping of the valve including the date for inclusion

29 IST Culture – Issues Check Valve Condition Monitoring Issues Valve Information – future enhancements may include link to valve picture and location map

30 IST Culture – Issues Check Valve Condition Monitoring Issues Maintenance History to review

31 IST Culture – Issues Check Valve Condition Monitoring Issues Maintenance and Test History has been reviewed as well as operating experience from the industry and vendor.

32 IST Culture – Issues Check Valve Condition Monitoring Issues Reverse Test done during PIV testing on a refueling (18 month) frequency Instrumentation Information

33 IST Culture – Issues Check Valve Condition Monitoring Issues Recorded Test Results – future enhancement to graph test results.

34 IST Culture – Issues Check Valve Condition Monitoring Issues Test Interval – looks both past and future

35 IST Culture – Issues Check Valve Condition Monitoring Issues Forward Flow Activity – Frequency, OPS activity and OPS procedure Instrumentation Information

36 IST Culture – Issues Check Valve Condition Monitoring Issues Recorded Test Results

37 IST Culture – Issues Check Valve Condition Monitoring Issues Test Interval – looks at the past as well as scheduling in the future

38 IST Culture – Issues Check Valve Condition Monitoring Issues Post Maintenance Testing issues –Planner Interface –Component Engineer interface –Outage Planning – correct sequencing Performance Monitoring –PWR PIV testing performance based –Trending for next outage issues –Transfer to OPS for SI Test Header Operation Not just getting to SAT Sequencing of the testing – test second outs before first outs get seated by RCS Pressure.

39 IST Culture – Issues Trending vs. Data Entry Data Entry does not equal trending Technical Specification compliance – verification of the activity and that it meet acceptance criteria Performance Monitoring review - multi layered –Identify adverse trend –Focus on next outage activities –Adjust “knowledge” of component performance –Interface with System, Component, or other Program Engineers

40 IST Culture – Issues Summary Evolving effort Highlights only – could not get into all of the details Welcome comments or questions Welcome recommendations