1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Replies by N.Meyners (in green) 27 August 2007ILC Questions M. Breidenbach1 ILC Detector Strategy Questions Some of us have been wondering about the fundamental.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
1 GLD Surface Assembly Y. Sugimoto KEK
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
LCWS2013 (Asian Region) CFS 12th November Experimental Hall 3D deformation analysis Asian Region Design CONVENTIONAL FACILITIES AND SITING.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
2016/9/30 Yasuhiro Infra/CFS mini-ws
CLIC Civil Engineering Update
Updated Design of Detector Hall
Introduction and Meeting Objectives
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Part II: Integrated Design of Infrastructures
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Hybrid Access Optional Study
Summary Some Issues of Future Consideration
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Detector hall in mountain regions
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Kitakami IR Access Discussions
8-10 April 2014 CFS-ADI Joint Meeting
Overview of Day One – 29 Feb 2016
Presentation transcript:

1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration

2 ILC in mountain regions Design study of accelerator and conventional facilities (CF) in mountain regions is one of the major activities in GDE Design of the detector hall in mountain regions should be done by the detector community in cooperation with GDE CF group We (T.Sanuki, Y.Makida, M.Miyahara, Y.Sugimoto, T.Tauchi, H.Yamaoka, M.Yoshioka, A.Sugiyama) are now involved in this activity (since Apr.2010)

3 An example of Asian mountain site Exp-hall Access tunnel

4 Exp-hall in mountain regions For CMS-style assembly using big vertical shafts, depth of IP should be d≤100m This requirement restricts the location of IP in mountain regions By removing the constraint of d≤100m, more flexible choice of IP location and accelerator layout can be made –Selecting the location of the cavern with better geology would reduce the cost and the construction period Exp-hall without vertical shafts may be more suitable for some candidate sites in mountain region In that case, access tunnels are used to carry detector and accelerator components into detector cavern or accelerator tunnel We have just started to study on the exp-hall design and detector assembly method without vertical shafts as an option (n.b. It does not mean that the CMS-style assembly using vertical shafts is excluded for all candidate sites in mountain regions)

5 A possible design of exp-hall Bottom access tunnels at both ends (for 2 detectors) Small alcoves at garage positions for detector opening Top (duct) tunnel is bored first, and then the arch part of the cavern is excavated With vertical shafts Without vertical shaft

6 Detector assembly Assembly hall locates at the entrance of access tunnel where wide flat surface and wide roads exist Detector would be assembled to relatively small pieces (<100~200 ton) at the assembly hall, carried to the cavern through the access tunnel, and integrated to the large detector inside the cavern (Similar to “modified CMS style assembly” which was proposed by GLD group in 2006) Barrel iron structure would be divided in  (and R) direction, rather than Z direction Solenoid coil would be wound on surface for 5 modules, and these modules are connected into one solenoid in the cavern Detailed study on the assembly method is necessary

7 Comments Comments at DESY ILD WS in July –Construction period? –Space for assembly of the solenoid and iron yoke? Comments by SiD at CFS in Aug –No problem!

8 Construction period Construction period is one of the most controversial issues for the shaft-less exp-hall Construction period of an access tunnel (L~1km) would be similar to that of a vertical shaft (  =18m, d~100m) Non-CMS style assembly was once proposed for GLD as “modified CMS assembly” which can be done within the same time period as the CMS style assembly Assembly of the iron yoke structure and the solenoid in the cavern would take ~1y, but it does not mean that non-CMS style assembly (new modified CMS-style assembly) takes 1y more than CMS style assembly

9 CMS Style CMS style Before CCR in

10 Modified CMS style CMS style Modified CMS style 1y for Yoke assembly + 1y for Sub-detector install

11 New modified CMS style

12 Space for assembly We need enough space to assemble the iron yoke and the solenoid in parallel Solenoid assembly procedure and installation method have to be studied Exp-hall should be equipped with two 200-ton cranes: usually one for each detector, and occasionally two cranes are used together to carry heavy (>200 ton) components

13 Lower risk option Larger (h~11m) access tunnel is an attractive option if the cost is not very high –Solenoid is constructed and tested on surface, and carried into the cavern through the access tunnel –This option has much less risk

14 Summary Modified CMS style assembly for shaft-less detector hall will not take longer time than CMS-style assembly Underground space needed for solenoid assembly is not clear yet Solenoid assembly/test on surface is an attractive option if the cost of larger access tunnel is not terribly high There are many issues to be studied for the exp-hall optimization; some of them are common to the CMS style assembly: –Configuration of He system (He compressor location, piping compatible with push-pull, etc.) –Power supply of Solenoid (location, electricity, cooling) –Gas ventilation in solenoid quench –Power consumption (He compressor, detector, lighting, etc.) –Cooling water (detector, dump resister, etc.) –Air conditioning (cooling) –Drainage of ground water –Human safety including escape route –Vehicle for heavy (~200 ton) components through the access tunnel –………………….

15 Backup slides

16 A possible design of exp-hall Wall can be upright if the geology is good

17 A possible design of exp-hall

18 A possible design of exp-hall

19

20 Access tunnel

21 Huge caverns in Japan More than 20 huge caverns with access tunnels have been constructed in Japan for hydroelectric power plants A 25m(W)x47m(H)x130m(L) (94,000m 3 ) cavern can be excavated only in 14 months, and a 34mx54mx210m (250,000m 3 ) was excavated in 21 months

22 Example of a cavern Underground hydroelectric power plant in Japan (Kannagawa power plant) Cavern size: 33m(W)x51.4m(H)x215.9m(L) in hard sedimentary rocks Construction (excavation) period: ~1y for arch, ~1y for bench Depth: d~600m  Heavy components of generators were carried into the cavern through access tunnels