HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.

Slides:



Advertisements
Similar presentations
TCP Monitor and Auto Tuner. Need Analysis Enable monitoring of TCP Connections Enable maximum bandwidth utilization No such utility available in MONALISA.
Advertisements

HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
1 HBD Update Itzhak Tserruya DC meeting, April 9, 2008 April 9, 2008.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
CS 290C: Formal Models for Web Software Lecture 10: Language Based Modeling and Analysis of Navigation Errors Instructor: Tevfik Bultan.
Chapter Apache Installation in Linux- Mandrake. Acknowledgment The following information has been obtained directly from
Multiple Tiers in Action

ASP.NET 2.0 Chapter 6 Securing the ASP.NET Application.
Session Management A290/A590, Fall /25/2014.
Dealing with central events in Run 10 Au+Au collisions Mihael Makek Weizmann Institute of Science HBD Meeting, 2/6/2010.
Continuous Integration for Databases Learn how to automate your build and test Steve Jones Red Gate Software Part II of the Continuous Delivery for Databases.
Setting Up a Sandbox Presented by: Kevin Brunson Chief Technology Officer.
CN1276 Server Kemtis Kunanuraksapong MSIS with Distinction MCTS, MCDST, MCP, A+
CLEO’s User Centric Data Access System Christopher D. Jones Cornell University.
Visual Studio 2012 or 2013 VisualStudio.com (or) Github (or) Bitbucket (or more) Azure Cross-Platform Command Tools Setup if you want to play too.
DONE-10: Adminserver Survival Tips Brian Bowman Product Manager, Data Management Group.
Simply Powerful Tuesday, June 9, :00 – 10:00 AM PDT We will begin ~5 minutes past the hour Bulk Mailer Professional and Business: It makes sense.
The Moodle Reader Module: A Progress Report Thomas N. Robb Kyoto Sangyo University
1 Instant Data Warehouse Utilities Extended (Again!!) 14/7/ Today I am pleased to announce the publishing of some fantastic new functionality for.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
ENGR 1181 College of Engineering Engineering Education Innovation Center Collecting Measured Data Pre-Class Reading.
Slide 1 RDU Data Collection System Overview. Slide 2 * The RDU data system is, primarily, an RF-Tag-based system. * All process information and test results.
AEgir Maintain your Drupal sites. The name: AEgir “In Norse mythology, AEgir was the god of the oceans and if Drupal is a drop of water, AEgir is the.
FailSafe SGI’s High Availability Solution Mayank Vasa MTS, Linux FailSafe Gatekeeper
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
Management System of Event Processing and Data Files Based on XML Software Tools at Belle Ichiro Adachi, Nobu Katayama, Masahiko Yokoyama IPNS, KEK, Tsukuba,
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
Framework of Job Managing for MDC Reconstruction and Data Production Li Teng Zhang Yao Huang Xingtao SDU
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
Maintaining and Updating Windows Server Monitoring Windows Server It is important to monitor your Server system to make sure it is running smoothly.
BNL DDM Status Report Hironori Ito Brookhaven National Laboratory.
Quality Assurance How do you know your results are correct? How confident are you?
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
CS 127 Introduction to Computer Science. What is a computer?  “A machine that stores and manipulates information under the control of a changeable program”
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Flexible intelligent solid video management software.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
Online Monitoring for the CDF Run II Experiment T.Arisawa, D.Hirschbuehl, K.Ikado, K.Maeshima, H.Stadie, G.Veramendi, W.Wagner, H.Wenzel, M.Worcester MAR.
Experimental Facilities Division ORNL DAQ System Interfaces Neutron Science Software Workshop Oct 13, 2003 Rick Riedel.
Module 9 Planning and Implementing Monitoring and Maintenance.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
Pavel Nevski DDM Workshop BNL, September 27, 2006 JOB DEFINITION as a part of Production.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
Suppress our data? Deepali and Takao. Issue now Event size for HBD is large at HV=3500V –Is not very much appreciated. –Needs to set higher zero-suppression.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
D.Spiga, L.Servoli, L.Faina INFN & University of Perugia CRAB WorkFlow : CRAB: CMS Remote Analysis Builder A CMS specific tool written in python and developed.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Ch. 31 Q and A IS 333 Spring 2016 Victor Norman. SNMP, MIBs, and ASN.1 SNMP defines the protocol used to send requests and get responses. MIBs are like.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
MCSA Windows Server 2012 Pass Upgrading Your Skills to MCSA Windows Server 2012 Exam By The Help Of Exams4Sure Get Complete File From
1 Policy Based Systems Management with Puppet Sean Dague
Grado en Ingeniería de Tecnologías y Servicios de Telecomunicación
EVENT LOGGING & CONTENT VERSIONING SYSTEM
Conditions Data access using FroNTier Squid cache Server
TYPES OF SERVER. TYPES OF SERVER What is a server.
Cloud based Open Source Backup/Restore Tool
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Teacher Tutorial Welcome to the TUNEin to READING
Lecture 34: Testing II April 24, 2017 Selenium testing script 7/7/2019
Presentation transcript:

HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009

RESOURCES OF INFORMATION  The HBD HV Server possess a very stable and precisely timed HV data backup process, which clearly stands out of the crowd, as it stores the complete status of every 1471N module every 7 seconds (esp. for TripProtect) as well as HV Control internal activities by system request from the control core. The entire system has been extremely crash tested and is very reliable. Blaming this system for RANDOM fluctuation in module gain is the wrong approach to this issue!  All this HV information is publically available in our database: hvdb  In terms of gain, all runs that have successfully passed OnCal are stored in the Phenix database. With that information one can retrieve the gain via running our root analysis script. HBD HV Control & Monitoring System Manuel Proissl Page 2 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16 th, 2009

THE BASELINE FOR FURTHER STUDIES  In order to have a look at the latest produced runs, one may login as phoncs to any VA machine and run the following program: $> hbd/gain/glookup Provide a runnumber that has passed OnCal Result for example for Run (last Sunday evening): HBD HV Control & Monitoring System Manuel Proissl Page 3 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16 th, 2009 RUNNUMBER: BEGIN: :50:17 END: :48:05 EVENTS: Gain vs. HV for Run# Module | DV_mean | MV_mean | Gain | Status ES1 | 0 | 0 | | FAILED: ZERO ES2 | 3880 | | | SUCCESS ES3 | 3954 | | | SUCCESS ES4 | 3804 | | | SUCCESS ES5 | 3876 | | | SUCCESS EN1 | 4000 | | | SUCCESS EN2 | 3867 | | | SUCCESS EN3 | 3980 | | | SUCCESS EN4 | 3838 | | | SUCCESS EN5 | 3913 | | | SUCCESS WS1 | 4037 | | | SUCCESS WS2 | 3941 | | | SUCCESS WS3 | 3843 | | | SUCCESS WS4 | 3855 | | | SUCCESS WS5 | 3916 | | | SUCCESS WN1 | 3941 | | | SUCCESS WN2 | 3930 | | | SUCCESS WN3 | 3839 | | | SUCCESS WN4 | 3858 | | | SUCCESS WN5 | 3990 | | | SUCCESS

THE BASELINE FOR FURTHER STUDIES  A very different program is currently running for the past 33 hours to analyze the entire data from Run-9 and automatically generates a new database that will provide the baseline for further studies; in particular with the purpose to determine if our idea of a gain correction curve based on P/T has to be “slightly” adjusted in order to guarantee more stable performance in Run-10. The completion of this database is expected to be today, 06/16 at 2:30pm. Access tools for the Web as well as command line will be provided shortly after…  Higher P/T: lower Gain --- Lower P/T: higher Gain In order to follow these P/T variation, we adjust the HV, which is in theory absolutely correct… However, as we’ve seen multiple times in Bob’s lab: Adjusting the HV results moreover (easily) in “over-adjusting” the Gain. On the other hand, gain can also change without any change in HV! HBD HV Control & Monitoring System Manuel Proissl Page 4 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16 th, 2009

GAIN CHANGES: HV CONST HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16 th, 2009

GAIN CHANGES: P/T WITHIN T1 BIN HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 16 th, 2009