ATLAS-CMS Batteries ATLAS - - 2x MSS battery banks + 2x Quench Heater banks - - MSS systems OK (6 hrs minimum) - - HEC batteries promised for week 25,

Slides:



Advertisements
Similar presentations
New Marking and Monitoring Techniques for Fish BPA Project Presenter: Sandra L. Downing (NMFS - NWFSC) New name: Development and Evaluation of.
Advertisements

Exporting Raw/ESD data from Tier-0 Tier-1s Wrap-up.
T-Mon SERVER CONNECTOR
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Smart.IC II project Forklift truck connection Forklift truck connection, outside of the connector Automatic data download through GPRS and anlaysis of.
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Basic Use, Care, and Maintenance of an LCD Projector Presenter.
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
2- Figure shows a circuit diagram. Determine the current,
 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
2. Run. Hours button 1. Run. Hours screen Running hours.
PH/DT MCP & MNO Xavier Pons on behalf of MCP team – 25/03/2013.
PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
BUILDING SECURITY ALARM SYSTEM. BUILDING SECURITY ALARM SYSTEM Any electrical or mechanical device which is designed or used for the detection of an unauthorized.
Monitoring Requirements Virginia Department of Health Summer Food Service Program (SFSP) 2014.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Micro Wind for Remote Sites James Jarvis APRS World, LLC
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
German point of view Results of the national meeting of German experts Automatic Emergency Call Systems.
Winter 2011/2012 shutdown On-call service - FSU Future projects AOB G. Olesen - PH-DT-DI.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Messengers of Peace. Team Mahatma Gandhi Challenges Connectivity Language Electricity Skill Financial Crisis.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
Modernisation of Signalling System Project No. 2001/LV/16/P/PT/006 EU Monitoring Committee meeting: EC, MoT, MoF, LDz
A possible Future Career For a career I chose to be an Automobile Mechanic.And for my dream career I chose a Mechanical Engineer.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
EHN1 North Wall Dismantling Schedule Bastien Rae.
WEEK 1 You have 10 seconds to name…
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
GGUS Slides for the 2012/07/24 MB Drills cover the period of 2012/06/18 (Monday) until 2012/07/12 given my holiday starting the following weekend. Remove.
Low Level Coded Product Structure Tree
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
Remote Gymnasium Equipment Occupancy Monitor Alex Brown Advisor: Professor Hedrick.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
Validation of SAM3 monitoring data (availability & reliability of services) Ivan Dzhunov, Pablo Saiz (CERN), Elena Tikhonenko (JINR, Dubna) April 11, 2014.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
NA62 CV activities Piero Valente 5 th September
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
System Analysis and Design Copyright © Genetic Computer School 2007 SAD14-1 CHAPTER OVERVIEW  Overview Of System Maintenance  Tasks Performed During.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
ATLAS FroNTier cache consistency stress testing David Front Weizmann Institute 1September 2009 ATLASFroNTier chache consistency stress testing.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
IBBelle: Status & Plans
BE-CO Activities for PSB
هجرة الشباب الدولية والتنمية الفرص والتحديات
Quicken Installation Related Problems More info :
IBBelle: Status Commissioning at MPP Transport to KEK
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
Emergency Electrical Power Supply for Buildings
دانشگاه آزاد اسلامی واحد زاهدان
UVU Panic Alarm Systems
Electric Circuits Watch this video and see if you can think of what we will need to build a circuit? Energy & Electricity in Science : How Does an Electric.
Two factor Authentication
Warm Magnet Thresholds
Presentation transcript:

ATLAS-CMS Batteries ATLAS - - 2x MSS battery banks + 2x Quench Heater banks - - MSS systems OK (6 hrs minimum) - - HEC batteries promised for week 25, not yet arrived PH-DT-DI

ATLAS-CMS Batteries CMS - - 2x MSS battery banks - - Batteries promised for week Installation according to machine schedule - - Autonomy should be sufficient PH-DT-DI

ATLAS-CMS Batteries Monitoring - Maintenance - - Several signals have been connected - - Arrangements for maintenance have to be enforced - - Corrective maintenance? PH-DT-DI