2010 Hydrographic Services Review Panel David Steele, PLS DNR Geodetic Survey Director & Spatial Reference Center of Washington.

Slides:



Advertisements
Similar presentations
INDOT Height Modernization Project Ryan C. Swingley, PLS Andrew D. Baxter, PLS.
Advertisements

New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
Arizona Height Modernization Program - AZHMP
Alabama Height Modernization Project, NAD 83(2011), and GEOID 12 in Alabama Overview of Height Modernization Project Overview of Height Modernization.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.
Ohio Height Modernization Related Activities Great Lakes Regional Forum Sept 24-25, 2008 Madison, Wisconsin David Conner Geodetic Advisor to the State.
2015 Height Modernization Partner Meeting April 14, 2015.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
Federal Geodetic Control Subcommittee Update to Coordination Group Ronnie Taylor alternate Subcommittee Chair Deputy Director, National Geodetic Survey.
Texas Height Modernization and Texas Spatial Reference Center Gary Jeffress, Ph.D., RPLS Director, Conrad Blucher Institute for Surveying and Science Texas.
GIS Director: Gina Herbst Principal : Victor M. Rasgado, PLS 8113 Certified DBE/MEB
NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 30 TO MAY 1, FRANKFORT, KY 1 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013.
Surveying & Mapping. GPS on Bench Marks Campaign.
Juliana Blackwell, Director National Geodetic Survey, NOAA
Streamgage Datum Conversion Great Lakes Region Height Modernization Consortium meeting New Cumberland, PA April 13, 2011.
International Great Lakes Datum Overview Presented at a Height Modernization Program meeting January 9, 2014 by David Conner Geodetic Advisor to the State.
GEODETIC INFRASTRUCTURE Walter Volkmann Manager of Technical Operations L. D. Bradley Land Surveyors Gainesville, Florida.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA CSRC, Coordinating Council Spring Meeting La Jolla, CA April 28,
≥107 RTN USA ≥35 DOT ACADEMIC/SCIENTIFIC SPATIAL REFERENCE CENTERS VARIOUS DOTS + MACHINE GUIDANCE COUNTY CITY GEODETICSURVEYS(NC,SC) MANUFACTURERS VENDOR.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
© 2009 Herbert, Rowland & Grubic, Inc. OPUS and VRS for QA Surveys of the PAMAP Program Eric M. Orndorff, MS, PLS Zach Lupold, BS Great Lakes Region Height.
Transition of the ORGN from NAD 83(CORS96) epoch to NAD 83(2011) epoch Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT March 2013 ODOT.
Geography 370 Locating Positions on the Earth
National Height Modernization Program Overview January 24, 2006 Juliana Blackwell Height Modernization Program Manager.
Geoid Modeling at NOAA Dru A. Smith, Ph.D. National Geodetic Survey National Ocean Service, NOAA November 13, 2000.
Integrated and Collaborative Organizations Create Geospatial Solutions Geospatial Solutions by DBZ Achieving Great Heights: Toward a Better Vertical Reference.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
Height Modernization Making the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering,
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
B ≥ 4 H & V, KNOWN & TRUSTED POINTS? B LOCALIZATION RESIDUALS-OUTLIERS? B DO ANY PASSIVE MARKS NEED TO BE HELD? RT BASE WITHIN CALIBRATION (QUALITY TIE.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
The GRAV-D Project and The Future of NAD 83 and NAVD 88 A briefing for FEMA leadership Dru Smith, Chief Geodesist NOAA’s National Geodetic Survey.
The National Geodetic Survey Gravity Program Benefits and Opportunities Juliana Blackwell, Director National Geodetic Survey (NGS)
PRS92 Bonifacia Daet Sylvia Esperanza
Upcoming Changes to the National Spatial Reference System
Evaluating Aircraft Positioning Methods for Airborne Gravimetry: Results from GRAV-D’s “Kinematic GPS Processing Challenge” Theresa M. Damiani, Andria.
New Vertical Datum: plans, status, GRAV-D update FGCS San Diego, CA. July 11, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical.
GRAV-D Part II : Examining airborne gravity processing assumptions with an aim towards producing a better gravimetric geoid Theresa Diehl*, Sandra Preaux,
Precise Digital Leveling Section 5 Leveling Specifications.
NATIONAL READJUSTMENT WHAT WHY HOW WHEN NAD83(NSRS)
Use of High-Rate CORS for Airborne Positioning Theresa M. Damiani NOAA- National Geodetic Survey, Geosciences Research Division CGSIC 2013, Nashville 1b.
The Importance of Accurate Elevations & Case Studies Edward Carlson Pacific Region Geodetic Advisor National Geodetic Survey (808)
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
Why do Millimeters Matter? NOAA Models and Tools Support High Accuracy Positioning for Ecosystem Restoration and Ecological Research Surface too low: too.
2015 International Great Lakes Datum Height Modernization Project Dave Rigney NGS Geodetic Advisor Michigan Great Lakes Region Height.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
Revolution in Earth Measurement Traditional Surveying uses benchmarks as reference points Global Positioning uses fixed GPS receivers as reference points.
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012.
Towards optimizing the determination of accurate heights with GNSS APRIL 14, 2015 Dan Gillins, Ph.D., P.L.S. and Michael Eddy, Ph.D. student.
National Readjustment DALE PURSELL ACSM NATIONAL READJUSTMENT WHAT? WHY HOW WHEN POST QUESTIONS.
The Delta Levees Program
National Geodetic Survey Update Hydrographic Services Review Panel Honolulu, HI May 4, 2011 Juliana Blackwell Director National Geodetic Survey.
Height Modernization Activities at NGS Christine Gallagher National Partner Meeting April 30, 2014.
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
Geodetic Applications of GNSS within the United States Dr. Gerald L. Mader National Geodetic Survey NOS/NOAA Silver Spring, Maryland USA Munich Satellite.
GEOID03 in Louisiana and Alaska Dr. Yan M Wang and Dr. Daniel R Roman Geodesist, NGS/NOAA ACSM Annual Conference and Technology Exhibition Orlando, FL.
Lecture 15 – Geodetic Datums 5 March 2009 GISC3325.
Western Region Height Modernization Consortium Val Schultz PLS Surveyor / Reviewer Weber County Surveyors Office Ogden, Utah Co-Organizer along with Scott.
Proposal for a comprehensive vertical datum for North America, Central America and the Caribbean Dru Smith, Dan Roman, Vicki Childers, Mark Eckl, Monica.
GRAV-D: NGS Gravity for the Re- definition of the American Vertical Datum Project V. A. Childers, D. R. Roman, D. A. Smith, and T. M. Diehl* U.S. National.
WESTERN REGION HEIGHT MOD WEBINAR NOVEMBER 19,
SC – VRS Network To Support Surveying and Machine Control.
Nic Donnelly – Geodetic Data Analyst 5 March 2008 Vertical Datum Issues in New Zealand.
October 24, 2005 Silver Spring, Maryland MinnesotaDixon Hoyle MichiganDave Rigney Illinois Chris Pearson Ohio Dave Conner KentuckyRoss Mackay Convocation.
CO HT MOD History HT MOD funds ($75k) received in 2008 Outreach efforts conducted in Denver and Grand Junction Colorado Height Modernization Advisory.
Geodetic Control and Datums Where is it? How Accurately can we map it?
Colorado Height Modernization Forum Zelda LeCoat Zelda LeCoat.
Presentation transcript:

2010 Hydrographic Services Review Panel David Steele, PLS DNR Geodetic Survey Director & Spatial Reference Center of Washington

Height Modernization in Washington State Background and organization Activities in Washington 2

The SRCW The Spatial Reference Center of Washington (SRCW), a nonprofit organization, was organized in 2004 to oversee the funding, development and implementation of geodetic network modernization. 3

Program Management The Washington Department of Natural Resources’, Geodetic Survey Program was chosen to manage the program and collaborates with the SRCW while managing height modernization. NGS grants have been received in FY 2004, 2005, 2007, 2008 and

Height Modernization Activities Develop a GPS, Active Control Network Inventory existing geodetic control monuments Develop a Primary Base Station Network Run differential leveling projects to replace lost monuments and establish heights on new monuments and GPS stations Assist the NGS GRAV-D project 5

Washington State Reference Network 6

The Washington State Reference Network Quick Stats 89 of 102 Stations Completed 600+ Active Accounts 114,280 Minutes Avg. Monthly Fixed Solutions NAD83 (CORS 96) Epoch Cooperative – Public/Private 70+ Infrastructure Partners 80 Non-Infrastructure (Subscriptions) 42 Academic accounts 35 Trainer / Dealer accounts 7

The WSRN Business Model Infrastructure – Partner Funded and OperatedInfrastructure – Partner Funded and Operated Central Processing Center – Seattle Public Utilities Funded and Operated at Processing Center – Seattle Public Utilities Funded and Operated at Mirror Processing Center – Central Washington University Funded and Operated atMirror Processing Center – Central Washington University Funded and Operated at 8

The WSRN Business Model Operations cost offset by subscriber contributionsOperations cost offset by subscriber contributions »Single Accounts - $1,900 Annual »Five Accounts - $5,700 Annual »Ten Accounts - $10,000 Annual Academic and Trainer/Dealer – No Fee 9

WSRN Regional Integration WsDOT Mount – Walla Walla This mount will be there for a few years KOOT - Kootenai County Airport 10

11

12

Inventory Monuments 13

NGS Leveling Network 14

Primary Base Station Network DNR - SRCW 15

Primary Base Station Network The existing High Accuracy Reference Network (HARN) did not routinely include precise ground (orthometric) elevations. This degrades the geoid model quality, especially in areas of significant crustal motion. ‘A’ Order horizontal and precise ellipsoid height measurement will include 1 st order orthometric elevations with optimal spacing of 30 km across the entire state. 16

Primary Base Station Network Horizontal positions and ellipsoid heights will be measured on 60 existing 1 st and 2 nd order benchmarks and tied into 45 existing HARN stations, in addition to Federal CORS, WSRN, and PBO stations. Cost is approximately $8,000 per mark. Great care is being taken to fine tune the WSRN and all of the ground monuments on their separate datum and all will be included in the National Spatial Reference System. 17

Primary Base Station Network An improved geoid model from this data will allow GPS measurements to be made with relative accuracies less than 20 mm vertically and 5 mm horizontally. 18

19

20

Measurement Comparison published vertical to adjusted orthometric heights StationBM QualityΔ Pub to Measured N692 nd Order0.071 m F5091 st Order0.049 m Z2712 nd Order0.163 m B1431 st Order0.111 m F301 st Order m N2831 st Order m 21

22

Differential Leveling Contract Leveling Olympia tidal gauge leveling project Skamania WSRN station Spokane WSRN station Latah WSRN station Sprague WSRN station 23

Differential Leveling Cooperative Leveling Regional leveling in Tacoma (Pierce County) Grand Mound WSRN station (WsDOT) Raymond PBO station (WsDOT) Chimacum WSRN station (WsDOT) Darrington WSRN station (WsDOT) Tumwater Hill PBO station (WsDOT) North Seattle WSRN station (WsDOT) Lake Cushman WSRN station (WsDOT) 24

Support of GRAV-D NGS has pointed a way to the future elevation datum; a gravity based elevation datum. The GRAV-D program can be aided by local cooperation and Washington has requested permission to measure a network of absolute gravity stations that are spaced approximately 100 km. 25

Support of GRAV-D Absolute Gravity Station Network 26

Contacts Washington State Dept. of Natural Resources Geodetic Survey David Steele, Director PO Box Olympia, WA The Spatial Reference Center of Washington Washington State Reference Network 27