NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
How electricity is made
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Distributed Intelligence Provides Self-Healing for the Grid
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Goshen Area Bus Reconfiguration
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
2014 System Operator Conference 1 Protection System Misoperations: Why Should a System Operator Give a Hoot? April 17 & May 1, 2014 – Charlotte, NC September.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
EAS Lessons Learned Summary Lessons Learned Published in May 2014.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Rocky Mountain Region PA/PC Meeting March 18-19, 2014 Denver, Colorado.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.
WECC and NERC Protection Criteria and Standards
Reliability Standards Update
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
Connection of Wind Farms to Weak AC Network Marian Piekutowski Hydro Tasmania, Australia 30 May 2013.
Houston Area Dynamic Reactive Project March 11,
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
Steady State Analysis Of A Microgrid Connected To A Power System
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
NERC Project PRC-005 FERC Order No. 803 Directive ​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
1 CREPC 101 September 19, 2005 San Diego. 2 CREPC 101 CREPC History – Doug Larson Operation of Committee – Marsha Smith Relationship with other Western.
NERC Lessons Learned Summary LLs Published in September 2015.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
N-1-1 Contingency Analysis & Relay Protection 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MOPC Meeting Oct , 2016 Little Rock, AR
WECC Regional Standards Update
Next Steps in Load Modeling
Compliance Report to ERCOT TAC February 2007
Project WECC-0100 Update Load Modeling Task Force
NERC OC Update Greg Park, NWPP (In place of Rich Hydzik)
WECC August 2017 Reliability Workshop James Merlo, PhD
NERC PRC Drafting Team Voltage Ride-Through (VRT) Curve Genesis
WECC August 2017 Reliability Workshop James Merlo, PhD
NERC OC Update Greg Park, NWPP (In place of Rich Hydzik)
Project WECC-0100 Update Load Modeling Task Force
NERC Planning Committee Update
Presentation transcript:

NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange

2 Active Event Analysis Teams  MRO System Separation – Sept. 18, 2007 Writing final report  FRCC South Florida Disturbance – Feb. 26, 2008 Writing final report  RFC PEPCO Disturbance – June 13, 2008 RFC Event Analysis Team – collecting data  SPP Southwestern Public Service Company Separation – June 17, 2008

3 Ongoing & Emerging Trends

4 Emerging & Ongoing Trends  Unexpected Generator Turbine Control Action (31)  Voltage sensitivity of generation auxiliary power systems (13)  Transmission equipment failures (11)  Human Error (8)  Protection system misoperation (8)  Near-term load forecasting error (6)  Wiring errors (6)  Inter-area oscillations (5)  Protection equipment failures (4)  System Integrity Protection Scheme Misoperations (SPS & RAS) (4)  Generation vs transmission protection miscoordination (3)  Lack of Redundancy (3)

5 Emerging & Ongoing Trends  Loss of station observability (SCADA) (3)  Relay loadability (3) – 1 of these was in Europe  Relay settings (drifting) (3)  Relays / controls out-of-date with manufacturers’ tech. bulletins (3)  Uncoordinated load restoration (3)  Handling of missing/bad data by EMS systems (2)  Failed or run-away operation of substation automation (2)  Gas supply / gen. dispatch coordination (2)  Line hardware / conductor failures (2)  Protection system design errors / misapplications (2)  SCADA system misoperation (1)

6 EA Trends – Top Two Disturbance Elements  31 – Unexpected generator turbine control actions 28 in 7 events since August 2007 (and counting) 2 units CAUSAL in a system separation event  13 – Voltage sensitivity of generation auxiliary power systems (not included above)  Problem: THESE BEHAVIORS ARE NOT MODELED OR STUDIED Turbine controls (non-governor) are not modeled Typically only analyzing t = 0 to t = 20 seconds

7 Generator – System Interface Issues Gen Protection Gen Controls Turbine / Boiler Controls Trans Protection System Controls System Conditions PRC-001 Coordination

8 System Protection Performance Improvement Initiative

9 Protection & Control Performance Issues  Relay Loadability Standard PRC-023 – Relay Loadability passed by NERC Board, awaiting FERC approval  Protection System Redundancy SPCTF White Paper & SAR – December  PRC Standards Technical Support Protection misoperation analysis, maintenance, etc.  Protection System Coordination Trans & Gen Protection Coordination – IEEE collaboration Transmission Protection Coordination  System Performance & Protection Coordination with Turbine/Boiler Controls

10 Protection & Control Performance Issues  Elevate System Protection and Controls Task Force to Subcommittee status Increased emphasis on the importance of system protection  Collaborative efforts with IEEE Power & Energy Society IEEE Power System Relay Committee Bridge between IEEE standards and NERC system performance requirements (in NERC standards)

11 System Modeling Improvement Initiative

12 Modeling Issues  If something in not modeled, how can you predict system behavior or interaction???? Dynamics Modeling Issues  Missing models  Data errors  Models may not match field equipment and settings  Issue of “proprietary models”  No models for many wind farms No good indication of where wind farms are connected Registrations issues

13 Need for New Modeling  Turbine / boiler control models needed Units may remain stable, but ramp to zero and trip  Far more complex dynamic load models needed to analyze and predict FIDVR (Fault- Induced Delayed Voltage Recovery) behavior More load composition data needed to do this  Better governor models  Better SPS/RAS models  Models for new power electronic devices

14