Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Bob Grubbs Lead Bridge Engineer ODOT Region 3, Tech Center Lessons Learned FAST 14, Boston MA FHWA Highways for Life Showcase.
Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
ODOT Structure Project Manager Training
ODOT Structure Project Manager Seminar Concrete Decks
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.
Grade Separation Alternative
Chapter-2 Parts of Steel Bridge.
Connection Details for Prefabricated Bridge Elements and Systems
What do I need to know to build one ……….. Types of Bridges Arch Bridge Beam Bridge Suspension Bridge Cable Stays Bridge Combination Bridge.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Forest Lake EDA Meeting June 27, CR 2 and I-35 Bridge/Interchange First Ave NW (Backage Road) CR 2/Broadway Avenue Roadway Utilities Hardwood Creek.
Heavy Concrete Construction Formwork
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Nothing too heavy, nothing too high BRIDGES ON THE MOVE Sean Poynter, LEED-AP Senior ABC Estimator.
SHRP2 Project R04 Bridge Designs for ABC
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director PIAC HAM ; PID Major Rehab - Design Build Project Letting.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Connection Details for Prefabricated Bridge Elements and Systems
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
 Project Delivery  Design Considerations  Lessons Learned.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
CIA Biennial Conference Melbourne October 2005 High Performance Concrete in Bridge Decks Opportunities for Innovation.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Group N Chris Jones Ella Feekins Nikoline Hong
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
District VI, Florida Department of Transportation BARRIER DESIGN ALTERNATIVES FOR CRASH MITIGATION SE 2 nd Avenue and Biscayne Blvd Way (SE 4 th Street)
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
High Bridge Re-Deck Project
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Seismic Design Impact to
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
New Bridge Construction
Accelerated Bridge Construction; Raising the Bar
Presentation transcript:

Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.

About the Bridge Built in 1939 Two span concrete encased steel girder bridge with an open joint at the centerline of the deck creating four superstructure quadrants/sections. Vertical underclearances –13-9 southbound –14-0 northbound Bridge exhibits numerous locations of impact damage with loss of encasement and damage to bottom flange of fascia stringers. Numerous overhead utilities impact constructability. These lines cross immediately over the east and west abutments of the structure and cross Route 9 above the north fascia of the bridge.

About the Bridge

Proposed improvements Replace the entire superstructure and deck to increase the underclearance to a minimum of 15-0 Electro-Chemical Chloride extraction for substructure preservation Prefabricated superstructure units to reduce the construction duration Self-Propelled Modular Transporters (SPMTs) to remove existing superstructure in sections and install replacement units without relocating utilities Superstructure replacement will be completed in ONE weekend, beginning at 9PM Friday and ending 6AM Monday. No other significant traffic impacts anticipated.

Self-Propelled Modular Transporters (SPMTs) Heavy lift system traditionally used in the oil industry A series of interconnected or linked modules, which are computer controlled to operate as a single lifting unit Each module has its own power supply system and has an unrestricted range of movement on the ground System can move forward, backward, sideways, diagonally, as well as in circular and carousel (spin) motions Units adjust vertically between 10 and 16 depending on the manufacturer.

Video presentation Island Park Bridge Ottawa, Ontario

To start video, double click photo

Tennent Rd. Gordons Corner Rd. Wickatunk Rd. Franklin Ln. US Route 9 North Franklin Ln.

Tennent Rd. Gordons Corner Rd. Wickatunk Rd. Franklin Ln. US Route 9 North Southbound Demolition Staging Area (Municipal Parking Lot) Staging Area (Municipal Parking Lot) Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access

Tennent Rd. Gordons Corner Rd. Wickatunk Rd. Franklin Ln. US Route 9 North Southbound Installation Franklin Ln. Staging Area (Municipal Parking Lot) Staging Area (Municipal Parking Lot) Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access

Tennent Rd. Gordons Corner Rd. Wickatunk Rd. Franklin Ln. US Route 9 North Northbound Demolition Franklin Ln. Staging Area (Municipal Parking Lot) Staging Area (Municipal Parking Lot) Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access

Tennent Rd. Gordons Corner Rd. Wickatunk Rd. Franklin Ln. US Route 9 North Northbound Installation Franklin Ln. Staging Area (Municipal Parking Lot) Staging Area (Municipal Parking Lot) Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access Alternate Ramp Access

Advantages Eliminates 8 to 12 months of utility relocations vs. crane installation. Eliminates daytime lane restrictions for utility relocation. Saves over $600,000 in estimated utility relocation costs. Work will be completed in one weekend rather than 10 to 14 months.

SPMT Considerations Pick weights generally not a concern. Allows multiple construction activities to occur concurrently Construction activities no longer linear; reduces time. SPMTs can be costly. $375,000 for equipment on this project. Staging area selection critical. Close to site and adequate area required. Different suppliers use different techniques affecting staging requirements.

SPMT Considerations Check utilities in staging area. Still need lifting equipment. SPMT costs requires very compressed construction schedule. Design and planning are critical. SPMT use cant be dictated. Use incentive/disincentive provisions with very compressed schedule to encourage use. Refer to FHWA website. Provide detailed equipment specifications. Similar systems are not the same. Circular, carousel and crab movements are critical to defining SPMT. Get the suppliers to visit the site!!!

Project Design Considerations Pier set as control for geometry - narrow width. Existing headers removed to top of seats to eliminate conflicts. Prefabricated superstructure with replacement headers. Removing headers provides greater width to accommodate construction adjustments. Existing wingwalls removed to top of seats to eliminate conflicts. Partial demo required to replace bridge parapet, demo simply extended. Steel bolster eliminates one round of grouting. Disc bearings provides greater construction tolerances. Innovative incentive/disincentive provision. Incentive period ends 6PM Sunday, disincentive begins 6AM Monday.

Thank You!