Ocean City Beachfill Ocean City, NJ Bureau of Coastal Engineering New Jersey Dept. of Environmental Protection Office of Engineering & Construction.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

4 pm, July 22 nd (high tide = 6pm) 12 th Street19 th Street.
Syracuse City Council March 8, EIS Process & Schedule.
Status report on Oil Infrastructure post Hurricanes A presentation by Leigh Phillips Biehl & Co., L.P.
Subterranean Success: Geothermal Energy Powering Schools
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
Gadsden City High School Construction Progress. Gadsden City High School March 30, 2005.
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Why we need to learn a second language? Because its a ruff world out there.
Section 5.5 – Exponential and Logarithmic Models
Alabama Water Resources Conference 2013
1 Dennis Daughters, P.E. City Engineer / Director of Engineering, City of Sarasota Lido Key Beach Renourishment Program & New Pass Dredging.
Station Fire Project Status Presented by Los Angeles County Flood Control District.
State of Connecticut Department of Construction Services Bureau of Boilers.
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
Coastal Erosion Planning and Response Act (CEPRA) Program
Copyright Oxford University Press 2011 Chapter 2 Engineering Costs and Cost Estimating.
Innovative design ideas that save right of way acquisition costs: Service roadsRetaining walls Modified designBridge span extension. 232.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
Gordon G. Thomson, P.E., D.CE. Director, Coastal Planning & Engineering, Inc. – A Shaw Group Company Monitoring and Performance Evaluation of Emergency.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
City of Los Angeles Venice Dual Force Main Project
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
Industry Day May 6, Acres Semi-confined placement Pipe will be moved frequently No dewatering structures Marsh will be at different elevations.
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
Restoring and protecting Louisiana’s coast Barrier Plan June 16, 2010 Kyle Graham Deputy Director of Planning and Programs Office of the Governor – Coastal.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Corps Regional Sediment Management and Habitat Restoration: Cape May, NJ J. Bailey Smith National Planning Center of Expertise for Coastal Storm Damage.
Federal Policy III Deductions for mortgage interest and property taxes on second homes Casualty loss deduction for damage caused by natural hazard Rental.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
Coastal Management. Coastal Storms Tropical cyclones (hurricanes) and Nor’easters can devastate coastal areas Damage from coastal storms costs billions.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
Mouth of the Columbia River Jetties Major Rehabilitation.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
Folly Beach 1-yr Post-Construction Monitoring Report Nicole Elko, Ph.D. September 8, 2015.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Drift River Terminal - Emergency Flood Protection.
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
PRESENTATION & DISCUSSION Dave Bergen Southold Town Trustee July 18, 2015.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
Urban Storm Water Runoff and Inland Lakes: A Tale of Two Cities Jarron D. Hewitt and Martin T. Auer Department of Civil and Environmental Engineering,
San Francisco Ocean Beach-Great Highway Erosion Control Project.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE.
Modern Real Estate Practice in Pennsylvania 12th Edition Chapter 4: Legal Descriptions.
Sand Dollars Federal Shore Protection Appropriations
Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development.
UPPER NEWPORT BAY ECOSYSTEM RESTORATION PROJECT NEWPORT BEACH CITY COUNCIL STUDY SESSION FEBRUARY 14, 2006.
The Outer Banks Barrier Islands Cape Hatteras. Cape Hatteras Lighthouse.
5th Street Bridge Replacement Project Contract No
Hunting Island State Park Beach Restoration Project
Strategic shoreline placement from coast to coast
Coastal engineering in NC
John Barnes | October 18, 2018 | SWANA Regulatory Training
Breaches.
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Beach Erosion.
FLAGLER COUNTY, FLORIDA
Presentation transcript:

Ocean City Beachfill Ocean City, NJ Bureau of Coastal Engineering New Jersey Dept. of Environmental Protection Office of Engineering & Construction

Existing Conditions

History

Location Between Waverly and Seaspray, at the terminal groin, and 12 th StreetBetween Waverly and Seaspray, at the terminal groin, and 12 th Street Sand is to be placed from North to SouthSand is to be placed from North to South

Scope of Work 660,000 cubic yards of compatible sand660,000 cubic yards of compatible sand To be dredged from ebb tidal shoal of the Great Egg Harbor Inlet, approximately 5000 feet offshoreTo be dredged from ebb tidal shoal of the Great Egg Harbor Inlet, approximately 5000 feet offshore Potential to pump nearly 35,000 cubic yards of sand per dayPotential to pump nearly 35,000 cubic yards of sand per day linear feet per day linear feet per day

Inlet Complex/Borrow Area

Design Beach berm at a Fixed elevation of +6.5 feet NAVD88.Beach berm at a Fixed elevation of +6.5 feet NAVD88. Berm width varies with locationBerm width varies with location Pumped to a offshore slope of 30:1 with a 20:1 toe slopePumped to a offshore slope of 30:1 with a 20:1 toe slope

Financial Total cost of Project is $6,050,000Total cost of Project is $6,050,000 Cost Share:Cost Share: –75% State = $4,537,500 –25% Municipality = $1,512,500 Option = $690,000Option = $690,000

Dredge ILLINOIS 30 inch discharge diameter Capable of pumping 2500 cubic yards of sand 25,000 feet per hour Great Lakes Dredge and Dock Company

Schedule 90 Day contract time Mobilized second week of April Begin pumping second week of May End pumping second week of June Demobilize third week of June

What To Expect Pipeline on the beach Closing of a minimum 1000 foot sections of beach –Provide public safety and adequate staging 24 hour operation with continuous State inspection Structure Monitoring –Contractor will set up vibration monitors adjacent to structures

Environmental Concerns Piping Plover –Current conditions not favorable for plover habitat but they have historically used the area Shipwrecks –Known Cultural Resources Outside of Project Area Munitions/Debris –Double Screening At Cutterhead At Discharge Pipe

New Jersey Department of Environmental Protection Shore Protection Program