Improving Productivity, Cycle Time, and Operating Performance By: Fletcher L. Groves, III Vice President SAI Consulting.

Slides:



Advertisements
Similar presentations
APK: WHO IS MORE IMPORTANT?
Advertisements

7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Operating under a lower G & A Carlos Garcia Owner/CEO KIRA National 8(a) Association Winter Conference 2015.
Analysis of Investing Activities
The Strategy of International Business
Regain Profit Through Quality ASQ Section 1530 Southwest Florida September 15 th, 2005 Presented by Mike Weekes Whataboutquality Whataboutquality (716)
BUILDING FASTER Reducing Cycle Time in the Contract-to-Closing Process By: Fletcher L. Groves, III Vice President SAI Consulting.
Discounting Future Cash Flows
What is Forecasting? A forecast is an estimate of what is likely to happen in the future. Forecasts are concerned with determining what the future will.
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
1 The Nature of Costs Understanding is the Key to Control.
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
Chapter 3 - Product Design & Process Selection
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Chapter 8 The Impact of Economic Forces.
Throughput World. 2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints: 2- Basics Systems Thinking and TOC  TOC Premise 1: The Goal of a business is to.
1–11–1. 1–21–2 Chapter 16 Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Financial Analysis: Estimate Price & Profitability Paper #3 Entrepreneurship & Innovation Feasibility Analysis: Part 4.
Chapter 5: Supply Chain Performance Measurement and Financial Analysis
Chapter 1: Supply Chain Management. Chapter 1Management of Business Logistics, 7 th Ed.2 Learning Objectives - After reading this chapter, you should.
Chapter 1Management of Business Logistics, 7 th Ed.1 BUS 3620 Logistics and SCM We start our lecture to firstly gain the understanding of the following.
Strategic Management Accounting
FORECASTING PERFORMANCE Presented by: Teerachai Supojchalermkwan Krisna Soonsawad Chapter 11.
The Marketing Mix Price
Integrating Sales & Marketing ~ The Lean Business Model.
Financial Assessment and
Chapter 20 The Budgeting Process.
Chapter 2: Strategy and Sales Program Planning
Outline Introduction What is a supply chain?
Controlling Preview Steps in the Control Process Three types of Control Characteristics of Effective Control Systems Financial Controls a. Financial Ratios.
Operations and Production Management
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Logistics and supply chain strategy planning
Introduction to Theory of Constraints
1 CHAPTER 18 MODERN DEVELOPMENTS IN MANAGING OPERATIONS.
Inventory/Purchasing Questions
Chapter 18 Price Setting in the Business World. How are prices set by business people? Costs provide a price floor. See what substitute products are priced.
Who has the Profit and Loss Responsibility in Your Company? Presented by: Fletcher L. Groves, III Vice President SAI Consulting.
L EAN F LIGHT I NITIATIVE C ONFERENCE ©2012 M. Srinivasan 1 Focusing on Throughput Systems Thinking and the Theory of Constraints Mandyam (“Srini”) Srinivasan.
10-2 The Financial Plan McGraw-Hill/Irwin Entrepreneurship, 7/e Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Chapter 10.
Warm Up Turn to page 25 in your textbook Read “Consumer Action” What can Yolanda do to help her business be more profitable? How will she know if her price.
DEVELOPING A BUSINESS PLAN:
DO NOT COPY Chapter 9 SERVICE operations management and business pricing.
Business management is frequently faced with making decisions about price. How will I set prices? What should pricing accomplish? What about “loss-leaders”?
Copyright © 2008 by Robert B. Carton Value Systems, Value Chains and Value-Based Management The Essence of Organizational Performance Is the Creation of.
Analysis of Financial Statements. Learning Objectives  Understand the purpose of financial statement analysis.  Perform a vertical analysis of a company’s.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Differential Cost Analysis
Chapter 25: Reporting and Evaluation McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
1 1 Chapter 10 Marketing Channels: Delivering Customer Value.
Actionable Strategies for the Design of a High Performing Organization.
CHAPTER 11 Planning and Budgeting the Marketing Mix Part 1: Pages
Demand Management and Customer Service
Management Information Systems Islamia University of Bahawalpur Delivered by: Tasawar Javed Lecture 3b.
Module – 5 Pricing.  PRICING OBJECTIVES Growth in sales Improve market share Profit level Control cash-flow Combat competition Maintaining the image.
Financial Statements, Forecasts, and Planning
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Economic Decisions and Systems. Goals for this chapter  Distinguish between NEEDS vs. WANTS  Explain difference between GOODS and SERVICES  Describe.
Human Resource Management Gaining a Competitive Advantage
Chapter 18 Consumer Behavior and Pricing Strategy
DEMAND FORCASTING. Introduction: Demand forecasting means expectation about the future course of the market demand for a product. Demand forecasting is.
BREAK EVEN POINT & ANALYSIS BREAK EVEN POINT & ANALYSISFROM  MANJULA ROY  AKHILESH GIRI  UDAY PRATAP SINGH  PRASHANT KUMAR.
ERP vendor perspective
Materials & Logistics Management
Marketing Channels Bluefield College October 26, 2010.
Marketing Channels: Delivering Customer Value
Understand that corporate-level strategies include decisions regarding diversification, international expansion, and vertical integration Describe the.
Theory of Constraint.
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Improving Productivity, Cycle Time, and Operating Performance By: Fletcher L. Groves, III Vice President SAI Consulting

FastForward ™ Where is the homebuilding industry headed over the next five to ten years? How will the industry handle issues like competition, growth, consolidation, alternative delivery systems, and integrated value streams?

An Industry Perspective Reference Point Our Survey of Management Practices in the Homebuilding Industry  Cycle Time  Growth Strategies  Consolidation  Supply Chain Management  Value Disciplines  Customization  Recruiting, Rewarding, and Retaining Management

“What is your mid-term (five to seven year) estimate of the number of homebuilding companies that will be active in the markets you serve?” Reference Point survey

“Within the same timeframe, where do you think your own operation will be?” Reference Point survey

“What will be the primary contributor to your growth?” Reference Point survey

“Long-term (beyond 10 years), can you see the type of drastic consolidation in local homebuilding operations that has occurred in other industries?” Reference Point survey

“Long-term, can you foresee the type outright circumvention of established delivery systems that has occurred in other industries?” Reference Point survey

“Long-term, do you see homebuilding companies taking the lead in managing all of the activities that go into the process of creating the housing product?” Reference Point survey

What does it all mean? The demand for housing cannot profitably support this aggregate level of anticipated growth. The untapped opportunity is in vertical integration. The battle will increasingly be fought over productivity-driven improvements in operating performance.

I. Making the Connection The relationship between Productivity, Cycle Time, and Operating Performance. The impact of faster Cycle Time on the operation of a homebuilding company.

II. Seeing the Big Picture Improvement is a process - not a destination. Understanding what it is you are trying to improve - and how you will measure your progress. The right approach.

III. Getting Horizontal The process perspective. Eliminating non-value-added work from operating processes and freeing capacity. Making the rest of the work flow evenly and continuously.

IV. Getting Results Finding the constraint. Managing the constraint and improving its performance. More-for-Less: Taking advantage of the improvement in productivity.

What happens to the money? Throughput (T) is the rate at which a builder generates money through sales. Inventory (I) is all the money a builder invests in things it intends to sell. Operating Expense (OE) is all the money a builder spends turning Inventory into Throughput.

Productivity Productivity is the ratio between Throughput (Contribution) and Operating Expense - the ratio between money generated and money spent. It increases when you produce the same revenue at a lower fixed cost, or more revenue at the same fixed cost.

Cycle Time Conventional view: It is the length of time it takes to complete a home. New view: It is the ratio between Units- in-Process and Units Completed over time. It is reduced only by generating more money (Throughput) while spending less money (Operating Expense).

Operating Performance Operating Performance is determined by the impact of operational decisions on Throughput, Inventory, and Operating Expense. It improves whenever Throughput is increased and Inventory and Operating Expense are decreased.

Crucial Connections Productivity, Cycle Time, and Operating Performance are linked by Cause-and- Effect - they mean nothing apart from one another. They are also linked by their common elements - Throughput, Inventory, and Operating Expense.

Cause-and-Effect When Cycle Time gets... longer... shorter... Throughput Backlog Working Capital Work-in-Process Operating Expense

Building faster reduces Cost - both variable and fixed... increases Production Capacity... improves Cash Flow... reduces Working Capital Requirements... reduces Work-in-Process... improves Quality and On-Time Delivery... shortens Lead Time... increases NOI and ROA

“From contract to closing, how long does it typically take your company to complete a home?” Reference Point study

“How long does it take your company to complete work in the following sub-processes?” Reference Point survey

The Problem with Estimates Estimates are not accurate - builders almost always under-estimate their cycle times. Estimates tend to reflect averages, and average cycle time is not a useful measure. Estimates and averages do not provide any useful insight into Operating Performance and Productivity.

“How many days does it take to complete work in these sub-processes?... How many homes are in-process at one time and how many homes do you complete?” Reference Point survey

Calculating Cycle Time

Calculating Cycle Time in the Contract-to-Closing Process (Contract-to-Start) ( ) ÷ 47 x 30 = 59 days 2 (Start-to-Completion) ( ) ÷ 47 x 30 = 150 days 2

Get Horizontal Processes are the only means by which work is performed and value is created. The process-centered view is a complete departure from the perspective of most homebuilders. Performance improvement starts with the design of your processes.

Change the Way You Work Eliminate the non-value-added work, free capacity, and make the rest of the work flow evenly and continuously. Focus on the outcomes that meet the buyer’s expectations and eliminate the non-value-added work. Create simple processes and populate them with complex tasks.

Eliminate the stop-and-start, hurry-up- and-wait sequence of work - replace it with a system that produces sales, starts, and closings at a level and continuous rate. Stop pushing product through the system - use the productivity gained from even-flow production to reduce dependence on inventory starts to meet production requirements.

Stop pushing designs into the market - which increases cost and lead time - by only producing the plan designs that buyers order when they order it. Move from a vertical functional structure to a horizontal, team-based structure aligned with the flow of work. Set specific performance requirements for processes and make the connection with better operating performance.

Design your processes to meet the specific requirements of a narrowly defined market of buyers. Processes don’t perform work - you need to pay just as much attention to the “why” and the “want-to” as you do to the “what” and the “how-to”.

The Improvement Process The process for improving something requires you to find the answers to three questions: What to change? What to change to? How to make the change?

“How long does it take you to complete a home? How many days could the CTC process be shortened?” 1999 Reference Point survey

“How would you prioritize the improvement effort?” Reference Point survey

“If you started a project to improve cycle time, how would you allocate resources to the effort?” Reference Point survey

What’s the Goal? The reason you are in business is to make money. The Goal of your company is to make more money - now and in the future. Everything else is just a necessary condition for achieving that goal.

Measuring Progress How do you measure progress or - in operational terms - what does it mean to “make more money”? Increasing Contribution (Throughput) Reducing Inventory Leveraging the investment in Fixed (Operating) Expense

Resolving Conflicts In order to “make money”, you have to make the best operating decisions regarding Throughput (Contribution), Inventory, and Operating Expense. If you are faced with a decision in which two or more of these measures are in conflict - make the decision that has the best impact on Throughput.

Focusing the Effort Three basic choices: Fix the easiest problems first? Sacrificing long-term improvement for short-term gain Fix everything that needs fixing? Complexity and the reciprocal of 80/20 Fix the real problem? Focus on the constraint.

Systems as Chains

Understanding Constraints Every homebuilding company has at least one constraint - and probably only one constraint. The constraint is usually the company’s core problem - the root cause of most of the visible symptoms.

You have to know what the constraint is, and where it is located. Constraints can be logistical, managerial, or behavioral. Constraints can be external or internal. Once you understand what the constraint is - and where it is located - you have to eliminate it or manage it.

Final Thoughts Make the Connection. Improvement is a process - not a destination. Eliminate non-value-added work and make the rest of the work flow. Find the weakest link- make it stronger. Do more for less.

Questions and Information: Fletcher Groves is a Vice President with SAI Consulting. He can be reached at (904) , or by at