City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.

Slides:



Advertisements
Similar presentations
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Advertisements

Rodrick A. Crousey April 18, 2007 GEORGE W. HAYS PK-8 CINCINNATI, OH Mechanical Focus Senior Thesis The Pennsylvania State University Architectural Engineering.
Make the most of your energy Head Office – Case Study.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
ARMY ADMINISTRATION FACILITY Mid-Atlantic Region Alexander Quercetti Mechanical Option Advisor: Dr. Stephen Treado.
Thermal Energy Storage and Peak Load Reduction Mark M. MacCracken, PE, LEED AP, Pte CALMAC Mfg. Corp. Fair Lawn, NJ Calmac.com NARUC Summer Meeting
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
CHW Optimization Case Studies
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Energy Valve Delta T Manager
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Science & Technology Center. Chestnut Hill Academy - Philadelphia, PA David Klug. Mechanical Option. Advisor - Dr. Freihaut April 15 th, 2009 Architectural.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
SENIOR THESIS PRESENTATION An Evaluation of Water-Side Economics & Emissions Sinai Hospital South Tower Vertical Expansion 2401 W. Belvedere Ave. | Baltimore,
SENIOR THESIS PRESENTATION
David Sivin – Mechanical Bellevue Ambulatory Care Pavilion AE 882 Senior Thesis Faculty Advisor: Dr. Jelena Srebric The Pennsylvania State University.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
Lecture Objectives: Discuss Project 1 Learn about thermal storage systems.
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
Jon Burke 2006 Mechanical Faculty Consultant: Dr. Jelena Srebric An In-depth Look at a Green Roof.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
2003 ASHRAE Annual Meeting Kansas City Energy Conservation Benefits of a DOAS with Parallel Sensible Cooling by Ceiling Radiant Panels Jae-Weon Jeong Stanley.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Lecture Objectives: Cooling towers and modeling Project 1 Thermal storage systems.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA Jayme Antolik Architectural.
The Montgomery County Conference Center and Hotel 5701 Marinelli Road, Rockville, MD.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
GeoExchange / Thermal Energy Storage Systems Reduce Overall Energy Use and Peak Demand.
Lecture Objectives: Learn about thermal storage systems
Sustainability Best Practices
Eastern High School Baltimore, MD
Lecture Objectives: Continue with Sorption Cooling
Grunenwald Science and Technology Building
Thermal Energy Storage
Eastern Pennsylvania Laboratory Facility
Munters DOAS, Chilled Beams and VRV
Energy Efficiency in District Coiling System
Feasibility of Ice Storage
Presentation transcript:

City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena Srebric

Disclaimer Due to limited information regarding the central plant, the Amini Center was removed from the central cooling plant and provided its own independent primary chilled water loop. This redesigned system serves as the baseline of comparison for my thesis depth redesign. For the remainder of this presentation, the “Existing System” refers to the Amini Center’s independent cooling plant.

Building Information Location: Durante, California (L.A. Suburb) Size: 3-Stories, 59,800 sf New Construction Occupancy: Clinic, Lab, Office, Moderate Hazard Storage Design-Bid-Build Construction Dates: –

Building Load Profile

Existing Mechanical Systems Primary/secondary chilled water system (2) Air-Cooled Chillers on roof (2) Primary Pumps in Mech. room Rooftop AHUs & Scattered FCUs CV and VAV terminals PRVs step down HPS to LPS HX makes HW for building coils

Existing CHW System Flow Diagram 185 Ton Chillers 7.5 HP Primary Pumps 2-way control valve 296 gpm 5” CHW piping 42 deg. F CHWS Loop Fluid = Water

Existing Primary Loop

Annual Energy Consumption

Utility Rate

Annual Energy Cost

Primary Loop First Cost

Mechanical Redesign Objectives & Analyses Reduce annual energy cost Maintain reasonable first cost Reduce chiller demand load Design Ice Storage System Shift Load to off peak hours Cheaper Utility Rates

Mechanical Redesign Ice Storage System Ice making chillers & storage tanks Primary Pumps 25% Ethylene Glycol (2) 3-way modulating valves Internal melt ice-on-coil system Control Sequencing –Full Storage –Load Leveling Partial Storage –Demand Limiting Partial Storage

Ice Storage Flow Diagram

Full Ice Storage System Entire on-peak capacity shifted to off-peak hours Large chillers and storage capacity

Full Ice Storage System

Full Ice Storage Sizing

Full Ice Storage System 185 Ton Chillers 5 HP Primary Pumps (2) 594 Ton-hour Tanks (2) 3-way modulating control valves 232 gpm 5” CHW piping 38 deg. F CHWS Loop Fluid = 25% Ethylene Glycol

Annual Energy Consumption

Utility Rate Utility Rate Incentives

Full Storage Annual Energy Cost

Full Storage Primary Loop First Cost

Load Leveling Partial Ice Storage System Partial on-peak capacity shifted to non-peak hours Design Day: chiller Operates at full capacity 24-7 Bldg. Load < Chiller capacity – chiller stores excess capacity Bldg. Load > Chiller capacity – storage capacity discharges to supplement chiller Small chillers and storage capacity

Load Leveling Partial Ice Storage System

Load Leveling Partial Ice Storage Sizing

Load Leveling Partial Ice Storage System 125 Ton Chillers 5 HP Primary Pumps (1) 761 Ton-hour Tank (2) 3-way modulating control valves 157 gpm 4” CHW piping 38 deg. F CHWS Loop Fluid = 25% Ethylene Glycol

Annual Energy Consumption

Utility Rate Utility Rate Incentives

Load Leveling Partial Ice Storage Annual Energy Cost

Load Leveling Partial Ice Storage Primary Loop First Cost

Demand Limiting Partial Ice Storage System Partial on-peak capacity shifted to non-peak hours Similar to load leveling w/ on-peak exception Chiller capacity reduced to 45% during on-peak hours Middle of road chillers and storage capacity

Demand Limiting Partial Ice Storage System

Demand Limiting Partial Ice Storage Sizing

Demand Limiting Partial Ice Storage System 140 Ton Chillers 5 HP Primary Pumps (2) 476 Ton-hour Tanks (2) 3-way modulating control valves 176 gpm 4” CHW piping 38 deg. F CHWS Loop Fluid = 25% Ethylene Glycol

Annual Energy Consumption

Utility Rate Utility Rate Incentives

Demand Limiting Partial Ice Storage Annual Energy Cost

Demand Limiting Partial Ice Storage Primary Loop First Cost

Chiller Summary

Energy & Cost Summary

Ice Storage Redesign Recommendation Load Leveling Scenario –Lowest first cost –Lowest Annual cost –Smallest Chiller and pump size –Smallest ice storage capacity –Smaller piping –Roof framing smaller

Advantages / Disadvantages Advantages –Lowest Annual cost –Smaller Chiller, pump, and piping sizes –Slight energy savings (cleaner energy off- hours) –Utility Incentives –Lower CHWS Temp. Disadvantages –First cost –Physical size and weight of storage tanks –Ethylene glycol need –Increased controls and length of piping

Questions?