1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.

Slides:



Advertisements
Similar presentations
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
KLOE II Inner Tracker - FEE Status Antonio Ranieri RD51 Collaboration Meeting Paris October 2008 INFN-Bari S ervizio E lettronico L aboratori F rascati.
The MAD chip: 4 channel preamplifier + discriminator.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
6 Feb (update) A.P.Kashchuk (LNF/INFN, on leave from PNPI) 1 Triple GEM is the best candidate for station M1 regions R1/R2 Triple GEM has better.
CARIOCA (Cern and RIO Current Amplifier). The CARIOCA chip has 8 binary output, therefore DIALOG has 16 PCH as input channels and has up to 8 LCH as output.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Front-end boards tests G. Auriemma, D. Fidanza G. Pirozzi( $ ) & C. Satriano ( $ ) Present address: European Patent Office, Branch at The Hague, Patentlaan.
Dressing Test for the LHCb Muon MWP Chambers LECC 2006 Valencia Speaker: Rafael Antunes Nobrega (INFN Roma1) INFN Roma1: V. Bocci, R. Nobrega INFN Roma2:
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
CARDIAC production tests G. Auriemma, M. Martino & C. Satriano.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
In the (rare) normal operation mode main actions for editing the settings of the muon system and for checking the configuration and the noise level of.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Chamber electronics test bench Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele Santovetti.
30 September 2005, Frascati Anatoli Kachtchouk) 1 From CARDIAC version 2 to CARDIAC version 3 N.Bondar, A.Kachtchouk, P.Neustroev (PNPI)
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
On Chamber Front End electronics Test Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Trigger & Tracking detector for CMS
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
A General Purpose Charge Readout Chip for TPC Applications
Vito Palladino Straw Working Group 23/3/2015
DCH FEE 28 chs DCH prototype FEE &
Results from a preliminary analysis of the MWPC test at the GIF
EMC Electronics and Trigger Review and Trigger Plan
Front-end electronic system for large area photomultipliers readout
A Fast Binary Front - End using a Novel Current-Mode Technique
The IFR Online Detector Control at the BaBar experiment at SLAC
LHCb Muon Detector MWPC & GEM
BESIII EMC electronics
Status of the CARIOCA project
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Pre-installation Tests of the LHCb Muon Chambers
Simone Brusa / INFN – Ferrara On behalf of LHCb muon group:
Engineering Design Review
Presentation transcript:

1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega (Universita’ La Sapienza – INFN sezione I - Roma) G. Carboni, E. Santovetti (Universita’ Tor Vergata – INFN sezione II - Roma) IEEE San Diego 2006

2 5 Muon Stations Calorimeters Tracker RICH-2 Vertex Locator Magnet RICH-1 Muon Detectors Iron Filters  Chamber MWPC in Muon System  MWPC task  Fast muon triggering  Muon identification  5 Stations divided in 4 Regions  19 different geometries  1368 chambers  More than 120K channels LHCb: an experiment for precise measurements of CP violation and B mesons rare decays

3 Goal Friendly and automatic procedure for diagnose of errors of the Chamber + Electronics system Check of our 1368 MWPC (~ channels) before installation Database for Online Monitoring 1 - Chamber & Front-End Electronic (FEE) 2 - Test setup and description 3 - Results 4 - Cross check using cosmics 5 - Conclusion Topics

4 MWPC Design  40 pF < Cdet < 220 pF (geometry)  Wire (Anode) & Pad (Cathode) readout  4-gaps MWPC  gap size: 5 mm (wire plane centered)  gas mixture: Ar/CO 2 /CF 4 (40:55:5)  wire spacing: 2 mm, mechanical tension: 65 gr  HV = KV  gas gain: G ≈  gain uniformity: ≤ 30% MWPC Sandwich M5R3 full equipped M3R3 panel 6 FEEs Single pad Faraday cage

5 Chamber & Front-End Electronics (FEE) CARIOCA: 8 chs current-mode Ampl signal amplification tail cancellation base line restoration digitalization into LVDS lines DIALOG: 16 chs control chip 8-bits DACs for threshold voltage width and delay adjustment masking 24-bits scaler pulse injection feature access via LVDS-based I2C protocol The acquisition basic unit Chamber: 2 bigaps LVDS READOUT Ch(AB) OR SPB CONTROL Ch A CONTROL Ch B Single pad logic Spark protection board 2 CARIOCAs + DIALOG = FEE (CARDIAC)

6  Band-width: 10 / 25 MHz depending on Polarity  Sensitivity: 16 to 8 mV/fC  ENC: 0.3 to 2 fC  Min Detectable charge: about 40 mV/sens FEE characteristic I charge Anode Q > 14 fC Cathode Q > 8 fC Qth µ signal time dead region noise Min Det charge AFTER TEST FEE DATABASE Capacitance (pF)

7  The Discriminator Differential Threshold Voltage oLess sensitive to Noise oVth Nominal: 0 to 1.3 V oVth Effective Abs(V refA – V refB ) V refA & V refB obtained from Vth Nominal oOffSet (Vth Min Vth Effective) 740 to 860mV FEE characteristic II offset V th Nominal V refA V refB Vth Eff V th Nominal Noise Rate Analysis of Noise X Threshold Rate method

8 Test Setup Control FEE via I 2 C (Service Board & CANopen) Internal Counters (Dialog feature) External Counters (ACQ & Gate Boards and USB-VME) BarCode Reader PC (WIN, Visual C++ & ROOT) Barcode and Test Program Full Equipped Chamber (UNDER TEST) FEE ACQ LVDS TTL Gate Board Task input output UNDER TEST USB Service Board (SB) controls FEE in the experiment. ACQ is a 64-channels VME module used as external counter. Gate Board translates the SB gate signal sent to the FEE to be used also by the ACQ. MWPC FEE 8X 16X

9 Association of Chamber to FEE boards LOCATION DATABASE Extraction of Chamber and FEE parameters The Test Protocol Read the Chamber and FEE barcodes USER TASK In dressing area (1) Preparatio n SOFTWARE GOAL Complete Test Initialize Press Check LVDS output line Check Chamber-FEE association Search for Dead Channels Estimate Cdet (Rate Method) Search for Short-Circuit Search for Open Channels Check Level 3 specific thresholds Read Chamber barcode In test area (2) Test Procedure

10 Check if FEE is working properly (pulse injection, internal counters, output lines) Inject 500 pulses to all channels Reading by dialog & ACQ counters Comparison First Step Check LVDS output line Cable Checking Check if cables are swapped It can be useful to check cables in pit Pulse Injection Test

11 Check the Position of FEE comparison of OFFSET values obtained here to the ones found on FEE database Check dead FEE channels by the simple existence of Noise (min 3 pts) Second Step Threshold Scan Test Check Chamber-FEE association Search for Dead Channels

12 Estimate Cdet (Rate Method) Search for Short-Circuit Search for Open Channels Third Step: Cdet The detector capacitance determines the noise level since it acts as a series noise source SPB 2 nF bigap Threshold Scan Test Rate= Nexp 2 ENV 2 -V th 2 offset Min Det signal Offset & Min detect signal ENV ENC(Cdet) Sensitivity(Cdet) Cdet functionsNoise fit Short-Circuit : Noise (2nF)~Noise (300pF) saturation due CARIOCA band-width Open Channel : Cdet ~ 0pF easy to discriminate even for M2R2 40pF

13  Third Step: Cdet Criteria  channels Cdet  + -   > 2.5    > 3  or ERROR Mostly associated to setup itself Very important Alarms ! Cdet > 300 pF or Cdet < 20 pF

14 Criteria for Noise Rate at 3 specific Thresholds OK / WARNING / ERROR if Rate > 1 KHz Cathode Readout: fC Anode Readout: fC Check Level 3 specific thresholds Fourth Step Electronic Noise can be ~100 Hz / channel 1 KHz in Noisy channels is acceptable Chamber Eff Th = 8 fC (cathode) & 14 fC (anode) threshold

15 Results Format: DATABASE Diagnostic file Output file PLots & Histograms Detailed description of all steps through the pre-defined ranges of: OKs, Warnings, Errors messages List of 33 relevant parameters, including FEE database. Allow further comparisons Leds & Buttons OK Warning ERROR Info: Where is the problem ! Histograms of the main output parameters Graph of the Noise X Thr of all FEE/channels OffSet signature Vertex position (cross of each combination of two channels) Acquisition facility: any threshold/gate-time/ bigap- logic PLOT Raw-Noise file All points in Threshold Scan Can be used for further re- analysis and comparisons

16 Results: First Chambers LNF Cdet Alarms ! Those tests were performed using a MaxNoiseRate cut = 2 MHz Recently we have observed a FEE patology that distorted the Th-Scan at high Noise Rate We upgrade MaxNoiseRate = 20 MHz to detect it About 10% needed some intervention pointed out by the Test System Mostly Change FEE (dead,noisy) Also bad connection, SPB, I2C (chain) M5R4 Cdet (sim) = 220 pF 22 - M3R3 Cdet (sim) = 140 pF 06 - M5R2 Cdet (sim) = 120 pF chambers

17 More Plots: th = 10 fC & 6 fC th = 12 fC & 7 fC th = 14 fC & 8 fC 10 KHz 1 KHz 100 Hz Noise Rate of 4 M5R4 chambers 12 th = 14fC M5R4 & M3R3 & M5R2 OffSet

18 Cross-Check using Cosmics Cosmic Acquisition is being done at CERN on chambers tested in LNF Low Eff channel 2 chambers without PLATEAU HV scan, gas, Operational Threshold & signal coincidence between 2 Bigaps 15 M5R4 analysed up to now 100% of the defects found were successfully detected by the Upgraded Test System High Cdet signature More Statistic (mainly with other chamber types) must be collected

19 Conclusions Automatic and fast (5-10 minutes) system has been implemented to be used also for non-experts System has shown to be very effective on 130 INFN chambers tested: fundamental guide to fix problematic chambers (10%) Cosmic Acquisition pointed an unexpected kind of problem in 0.5% of the channels. A retest using the Upgraded version of Test System has been able to discriminate all those channels Now we have 4 systems operating: CERN (2), LNF (1) and in the pit (1) We aim to minimize drastically the installation of chambers with problems