USACE National Channel Framework Mapping Program

Slides:



Advertisements
Similar presentations
1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network.
Advertisements

Chapter 10: Designing Databases
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Land Boundary Information System: Navigating the New Website LABINS.org FLURISA Webinar January 21, 2015 Lamar Evers, PSM Florida Department of Environmental.
US Army Corps of Engineers BUILDING STRONG ® Welcome Hydro Survey Chart Modernization.
US Army Corps of Engineers BUILDING STRONG ® 5/7/2015 Adopting National Standards for Tidal and Geodetic Datums Jim Garster US Army Corps of Engineers.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Community College Workforce Development Center Melfa, Virginia August 16, 2013 “ A Unified Voice.
Traditional Approach to Design
Shared Graphics Skills Cameras and Clipping Planes
AIWW Deep Creek Bridge Replacement Information Update
Engineering Graphics Stephen W. Crown Ph.D.
Auxiliary Views – An Overview
Tech Ed Dept Technical Drawing Stuarts Draft High School
Dimensional Modeling CS 543 – Data Warehousing. CS Data Warehousing (Sp ) - Asim LUMS2 From Requirements to Data Models.
Floodplain Mapping using HEC-RAS and ArcView GIS Eric Tate Francisco Olivera David Maidment
PROCESS IN DATA SYSTEMS PLANNING DATA INPUT DATA STORAGE DATA ANALYSIS DATA OUTPUT ACTIVITIES USER NEEDS.
1 Chapter 7 IT Infrastructures Business-Driven Technology
USING GIS TO FOSTER DATA SHARING AND COMMUNICATION SEAN MURPHY IVS BURLINGTON, VT.
BUSINESS DRIVEN TECHNOLOGY
Creating a GIS from NOAA Electronic Navigational Charts
Coordinate systems.
US Army Corps of Engineers BUILDING STRONG ® CE-Dredge History & Status.
Spatial data Visualization spatial data Ruslan Bobov
Washington Metropolitan Area Transit Authority Voliya Arakkal Sr.GIS Analyst GIS in Public Transportation Conference September 15, 2011 Linear Referencing.
GROUP 4 FATIN NUR HAFIZAH MULLAI J.DHANNIYA FARAH AN-NUR MOHAMAD AZUWAN LAU WAN YEE.
CMIS 470 Structured Systems Design
Chapter 5 – System Modeling
6-1 DATABASE FUNDAMENTALS Information is everywhere in an organization Information is stored in databases –Database – maintains information about various.
Chapter 7 Structuring System Process Requirements
1 ENC Encryption/ISO Julia Powell Office of Coast Survey Marine Chart Division.
Architecture for a Database System
8. Geographic Data Modeling. Outline Definitions Data models / modeling GIS data models – Topology.
Harry Williams, Cartography1 Elevation: Definitions: Elevation - height above some arbitrary datum; on USGS maps this datum is mean sea level (“0” feet).
US Army Corps of Engineers BUILDING STRONG ® Preparing Your Local Data: Considerations for Cleaning-up your Geodatabase in Preparation for Adaptation Development.
7-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 7 IT Infrastructures.
Storing Organizational Information - Databases
DATA, SITE AND RESOURCE MANAGEMENT SOFTWARE. A Windows application software designed for use with Stylitis data loggers. EMMETRON consolidates resources,
Lecture 4 Conceptual Data Modeling. Objectives Define terms related to entity relationship modeling, including entity, entity instance, attribute, relationship,
Data Capture Initiatives and Stimulus Benefits IMSF Spring Conference New Orleans, LA, USA 5 May 2009 Doug McDonald, US Army Corps of Engineers.
FIT ProposalApril 29, 2015 Levee & Dike Inventory Data Development and Creation of Statewide Geodatabase Photo: Outlier Solutions Inc. and Lighthawk Steve.
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
ECoastal: Tools for Coastal Structure Analysis Rose Dopsovic GIS Developer Mobile District, Spatial Data Branch.
GIS Data Types. GIS technology utilizes two basic types of data 1. Spatial Data Describes the absolute and relative location of geographic features.
INTRODUCTION TO GIS  Used to describe computer facilities which are used to handle data referenced to the spatial domain.  Has the ability to inter-
Integrating and Standardizing Trails Data for West Virginia Evan Fedorko 13 April
DREDGEPACK® Basics.
1 Where have we come so far? By now, you should be familiar with: –What GIS is –How GIS works –Some of what GIS can do –GIS data formats Spatial data Tabular.
PLANNED LINES HYPACK 2016.
Chapter 7 Part II Structuring System Process Requirements MIS 215 System Analysis and Design.
National Waterways Conference 7-9 Nov 2007 Mobile, AL
ECoastal Training USACE Coastal CoP Meeting and Workshop Sorry for the delay. I was double booked this morning. The eCoastal workshop will begin at 8:30.
US Army Corps of Engineers BUILDING STRONG ® eCoastal: Overview & Status eCoastal Workshop Rose Dopsovic Bowhead Science & Technology, LLC for the Spatial.
Chapter 4 – System Modeling Lecture 1 1Chapter 5 System modeling.
Module 4 Data Management-Applications Coastal Applications of ArcGIS.
ECoastal Training USACE Coastal CoP Meeting and Workshop eCoastal in a Nutshell: An Introduction to the eCoastal Program & Custom Applications Rose Dopsovic.
Adopting National Standards for Tidal and Geodetic Datums
Three Dimensional Viewing
Chapter 5 – System Modeling
INTRODUCTION TO GEOGRAPHICAL INFORMATION SYSTEM
Web Engineering.
System Modeling Chapter 4
Map-Based Hydrology and Hydraulics
Object Oriented Analysis and Design
Sketching Techniques and Practice!
Introduction to Systems Analysis and Design Stefano Moshi Memorial University College System Analysis & Design BIT
Isometric and Orthographic Projections
Esri Highway Data Maintenance Solutions: An Introduction
Definition of Topographic Maps
WHERE TO FIND IT – Accessing the Inventory
Presentation transcript:

USACE National Channel Framework Mapping Program Greg Dreaper and Amanda Botts Spatial Data Branch USACE Mobile District gregory.w.dreaper@us.army.mil amanda.m.botts@sam.usace.army.mil BUILDING STRONG

Overview Goals of the Channel Framework Inventory (CFI) Benefits for developing a national channel mapping project. Understanding the components of the Channel Framework Inventory (CFI) Who provided it, and who is its primary customer? What Districts are involved How many are complete? What are the major hurdles?

Goals Standardization and centralization of the USACE authorized and maintained Federal Navigation Projects Accurately portray the channels and maintain them in a central eCoastal / eGIS system Improve communication by serving as a single point of contact between NOAA and USACE district offices

Benefits Single Feature Class that can by accessed by Multiple users Multiple formats Multiple projections The first contiguous channel dataset produced by the Corps of Engineers. Responsible for updating the National Waterway network. This network is used to track all domestic and foreign commerce.

Navigation Project vs. Sub-Project A Federal Navigation Channel Project A single or multiple channels by which Congress has authorized for the USACE to build and/or maintain. Will have a defined CWIS number A Federal Sub-Project Within the Congressional language of a Navigation project, a set section of the entire Channel. Will use its parent project’s CIWS number for funding needs.

What are Authorized, Constructed, and Maintained Channel Dimensions Authorized Channel Definition. The authorized channel is defined by original, federal authorization legislation. (engineering dimensions) This textual description, when manually tied to real world coordinates, and represented by two channel toes in either an electronic or hard copy format, is known as the authorized channel. Constructed Channel Definition. The constructed channel may differ in dimension from the authorized channel due to funding shortfalls, or local geomorphic conditions that preclude or hinder the construction of the channel to authorized dimensions. Where constructed and authorized channel dimensions differ, both dimensions must be captured in the coastal channel framework. Where constructed channel and authorized channel are the same, a note stating such must be included with the data. Maintained Channel Definition. Ideally, the channel is maintained to its authorized dimensions. However, where this is not the case, a maintained channel dimension results. This maintained channel dimension should not, however, result in a new set of channel toes, centerlines, or stations. In fact, maintained channel dimensions need be reported in relation to the authorized and constructed dimensions of the channel via the channel condition report and survey.

Construction Centerline Components Top of Slope TOE Line Construction Centerline Station Lines Channel Toe Definition. Channel toes represent external channel limits measured horizontally from and perpendicularly to the channel centerline. Channel toes form the boundaries which encompass entire federal projects and sub-projects. Representation. Toes are represented by single, continuous vectors extending from the beginning to the end of each federal project or sub project. The depth of the channel toe should be provided as an attribute attached to each channel vertex. Top of Slope Line Definition. The slope line is derived from the channel toe line depth and angle of slope values as provided with each station line. Where a line, starting from the channel toe, intersects project datum elevation 0, that is where the top of slope line is drawn. The channel slope angle, as well as depth of channel toe, is provided as an attribute of each channel station. Representation. TOS lines are represented by single, continuous vectors extending from the beginning to the end of each federal project or sub project. The depth of the channel toe should be provided as an attribute attached to each channel vertex. Channel Stationing Definition. A channel station is a reference line, primarily used during channel surveying and dredging operations, and meant to convey locations along a channel’s length. A station is placed within a channel at consistent intervals, perpendicular to the centerline, and extends horizontally to each channel toe. Traditionally, channel stations are placed every 100 feet along a channel’s length. In addition to positioning stations at regular intervals, stations also must be placed where channel toes change direction (horizontal inflection). Representation. Channel stations are represented by individual vectors. Station names are conveyed through associated text fields. The depth of the channel toe should be provided as an attribute attached to each channel vertex.

Components Channel Reach Channel Quarter Channel Condition Report Right Outside Quarter Right Inside Quarter Left Outside Quarter Left Inside Quarter Channel Reach Definition. The area within a project or sub-project traditionally used in reporting channel condition information via a channel condition report (ENG Form XX.XX). A reach may, or may not, possess a one-to-one spatial relationship to a project or sub-project. Reaches, if used for reporting purposes, must describe the entire project length. Representation. Channel reaches are represented by individual vectors placed parallel to the channel centerline at the beginning/end of each reach. Channel Quarter Definition. For channels 100 to 400 feet wide (ENG Form 4021-R) see paragraph 7 Appendix D - ENG FORM 4021-R, Nov 90 and for channels 400 feet wide and greater (ENG Form 4020-R) see paragraph 8 Appendix E - ENG FORM 4020-R, Nov 90 Channel Condition Report Definition USACE continues to utilize a tabular system for reporting channel condition reports. This standardized form calls for the structuring of such reporting into either three, or four channel sections depending on the width of the channel in question.

Why build the Framework? Updates to NOAA charts Provide NOAA an accurate inventory and location for all Corps Navigation Projects. Better reporting of current conditions to USCG, NOAA, and the public. Quick response during disaster events. Better understanding of the costs verses benefits for maintaining the safe and consistent navigation for our customers.

Current Inventory

Hurdles Accurately define extents of complete Projects and Sub-Projects Understanding Project history Maintained verses authorized dimensions District communication Data Consistency Dirty graphics Layer separation

Channel Framework in Action

Future Provide automatically generated CCR to NOAA and the Public Provide automatically generated CCI data to HQ

Project Manager: Duane Morrison Topographic Engineering Center / 703-428-6758 duane.morrison@usace.army.mil GIS Analyst: Greg Dreaper Bowhead / Mobile District USACE / 251-694-3728 gregory.w.dreaper@usace.army.mil GIS Analyst: Amanda Botts Bowhead / Mobile District USACE / 251-694-3750 amanda.botts@usace.army.mil BUILDING STRONG