1 Accelerator upgrades for NuMI Robert Zwaska Fermilab August 6, 2006 NBI 2006.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
SNuMI: Phase I & Phase II Nancy Grossman Phase I: $33.4M FY06$ (no contingency, no G&A) 41% contingency Phase II: $53.7M FY06$ (no contingency, no G&A)
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
F Project X Overview Dave McGinnis October 12, 2007.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
F Project X Overview Dave McGinnis August 8, 2007.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jan 12, 2005G.W.Foster - Proton Driver General Meeting Proton Driver General Meeting Kick-off Presentation G. W. Foster PD General Weekly Meeting Jan 12,
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Accelerator Status and Plans
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Superbeams with SPL at CERN
Presentation transcript:

1 Accelerator upgrades for NuMI Robert Zwaska Fermilab August 6, 2006 NBI 2006

2 Introduction Two potential neutrino experiments at Fermilab: Minerva and NOvA  NOvA requires proton exposure 5-10x that of MINOS  Additionally, studies are always underway on how to use many, many protons New Superbeams, muon sources/colliders & neutrino factory Outline Current Fermilab Accelerator Complex  Provides protons for antiproton and neutrino production  About 250 kW 120 GeV Programs to improve proton beam power 1.Proton Plan  underway 2.Super NuMI  in planning 3.HINS (proton driver)  in R&D Projections: power and timelines Can NuMI withstand these proton intensities? -> Next talk

3

4 The Main Injector Today Batch 1 (PBar) Batch 2 Batch 3 Batch 4 Batch 5 Batch 6 Booster Main Injector Provides high power, 120 GeV proton beam  80 kW for antiproton production  170 kW for neutrino production Takes 6 or 7 batches from the 8 GeV 15 Hz  4-5 × protons per Booster batch Total cycle time ≥ 1.4 s + batches/15 NuMI

5 Past-Year NuMI Running Average power of 165 kW previous to the shutdown Maximum beam power of 270 kW down the NuMI line (stably for ~ ½ hour) Peak intensity of 3×10 13 ppp on the NuMI target

6  The implementation of slip stacking to NuMI in the Main Injector will gradually increase NuMI intensity to 3.7x10 13 protons to NuMI per 2.2 second cycle or about 3x10 20 p/yr. (~320 kW)  This will increase by ~30% as protons currently used for pbar production become available. (430 kW)  The Booster rep. rate and efficiently must increase to accommodate this, and it is hoped that there will be enough excess capacity to continue to operate the BNB at the 2x10 20 p/yr level throughout this period.

7

8 What the Booster Can Do Booster can inject > 9x10 12 protons Extract as much as 6.6x10 12  At 15 Hz: 36 x /hr.  Ultimate Booster Throughput? Losses are enormous  About 1200 J / cycle  At 1 W/m: 1 x /hr Running this way would maximize the number of protons per-batch, but severely limit the integrated number of protons delivered Booster does not run this way 7.E12 4.6E12

9 Limits to Proton Intensity Total proton rate from Proton Source (Linac+Booster):  Booster batch size ~4-5E12 protons/batch  Booster repetition rate 15 Hz instantaneous Prior to shutdown: 7.5Hz average (pulsed components)  Beam loss Damage and/or activation of Booster components Above ground radiation Total protons accelerated in Main Injector:  Maximum Main Injector load Six “slots” for booster batches (3E13) Up to ~11 with slip stacking (4-5E13) Possible RF stability limitations (under study)  Cycle time: 1.4s + loading time (1/15s per booster batch)

10 1 st Booster Batch Injected into MI 2 nd Booster Batch Merged bunch train in MI EE  1 st Batch 2 nd Batch Decelerate Accelerate Time Merge two booster batches through RF manipulations Slip-stacking  Doubles the azimuthal charge in the Main Injector  Booster loading time is doubled K. Seiya et. al., PAC2003/5

11 Main Injector Loading Initial NuMI operation (“2+5”):  Two batches slip stacked for antiproton production.  Five more batches loaded for NuMI  All will be accelerated together.  This is the current standard operation. Ultimate NuMI operation (“2+9”):  Five batches will be loaded into the Main Injector, leaving one empty slot.  Six more batches will be loaded and slipped with the first to make two for antiproton production and 9 for NuMI.

12 MI-8 Dump Line Relocated Septum Dump New Dump Line

13 MI-8 Collimator Note marble cladding

14 Main injector large aperture quads

15 Booster Corrector Upgrades Prototype in progress  Fabricated and assembled  Testing in Progess System to be installed Stronger fields More poles Faster slew rates

16 SNuMI (Super-NuMI) Evolving set of upgrades that take advantage of the present accelerator complex  Tevatron will be shutdown end of 2009 (LHC willing)  No new rings  Many new devices/tunnels Phase I: Recycler Ring  Allows shorter repetition time  In active planning Phase II: Accumulator Ring  Allows higher intensity  Under consideration

17 SNuMI Stage 1: 700 kW Recycler as an 8 GeV Proton Pre-injector After the Collider program is terminated, we can use the Recycler as a proton pre-injector  Use the Recycler to accumulate protons from the Booster while MI is running Save 0.4 s for each 6 Booster batches injected 6 batches (5×10 12 p/batch) at 120 GeV every s  430 kW Recycler momentum aperture is large enough to allow slip- stacking operation in Recycler, for up to 12 Booster batches injected  4.3×10 12 p/batch, 95% slip-stacking efficiency  4.9×10 13 ppp at 120 GeV every s  700 kW

s s Booster Recycler Injection Orbit Slipping Orbit Main Injector Previous Cycle Next Cycle To NuMI Sample Timeline

19 SNuMI 700 kW organization Beam physics & Instability issues B. Zwaska 1.MI & RR Impedance measurements 2.Longitudinal & transverse instabilities and damping 3.Electron cloud Radiation safety for RR, MI and NuMI T. Leveling 1.Shielding assessment 2.Ground water protection 3.Surface water protection 4.Activated air emission 5.Residual activation Recycler Ring Upgrades P. Derwent 1.Recycler Ring modifications (Cons Gattuso) 1.Removal of pbar specific devices 2.Injection/extraction lines 3.Kickers 2.Slip-stacking schemes (K. Seiya) 3.Recycler Ring 53 MHz RF system (D. Wildman) 4.Dampers (P. Adamson) 5.Instrumentation (P. Prieto) 1.BPM upgrade NuMI Upgrades M. Martens 1.Primary proton beam (S. Childress) 1.Power supplies, magnet cooling and NuMI kickers for 1.5 s operation 2.Target & horns (J. Hylen) 1.Target and Horns 2.Water cooling of stripline 3.Fabrication of stripline section for ME beam 4.Cooling of target chase 3.Decay pipe & hadron absorber (B. Lundberg) 1.Decay pipe upstream window 2.Decay pipe cooling 3.Eventual upgrade Hadron Absorber Booster E. Prebys 1.Booster rep rate up to 9.3 Hz 2.Beam quality Engineering Support R. Reilly 1.NuMI Target Hall and components (2 FTE) 2.Proton delivery (1 FTE) 3.Support from PPD on FEA Main Injector I. Kourbanis 1. Additional RF cavities

20 Recycler Modifications  Take anti-proton specific devices out  Build new transfer lines direct injection into RR new extraction line at RR-30 rework RR-30 straight section  Build 5 new kickers  53 MHz RF system for Recycler Injection line from MI-8 to RR Extraction line in the RR-30 section

21 Elements of the 700 kW Upgrade Transfer lines (2) Kickers (many)  Injection(twice), extraction, abort, cleaning Recycler 53 MHz RF System  300 kV, low R/Q design Recycler instrumentation  BPMs, dampers Main Injector ramp time (power supplies) Beam Loss Control Beam: same intensity as Proton Plan, but comes every s, instead of 2.2 s Fallback: slip-stacking is expected to be made operational by the Proton Plan  If slip-stacking is untenable, this upgrade still provides 30% increased beam power through repetition rate and may be able to support other stacking methods

22 SNuMI stage 2: 1.2 MW Momentum stacking in the Accumulator After the Collider program is terminated, we can also use the Accumulator as a proton ring  Transfer beam from Booster to Accumulator Booster must be able to run at 15 Hz  Accumulator used for momentum stacking momentum stack 3 Booster batches (4.6×10 12 p/batch) every 200 ms – no need to cog in the Booster when injecting into the Accumulator longitudinal emittance dilution of ~ 20% instead of a factor 3 like in slip-stacking  Box Car stack in the Recycler load in a new Accumulator batch every 200 ms place 6 Accumulator batches sequentially around the Recycler  Load the Main Injector in a single turn  8.2×10 13 ppp in MI every s  1.2 MW Requires RF upgrade

23 Momentum Stacking Beam is injected, accelerated, and debunched Multiple injections can be brought together  Different momentum beams separated horizontally Beam is accumulated until the momentum aperture of the Main Injector is reached  4 injections shown – 3 planned for SNuMI

24 Accumulator transfer lines The Booster is connected to the Accumulator via a re-built AP4 Line AP4 must cross underneath the Debuncher and rise to the same elevation as the accumulator The Accumulator is connected to MI-8 line for SNUMI injection via the new AP5 Line The AP5 line must drop ~13’ during the bend to reach the MI- 8 elevation Started on conceptual design of AP4 and AP5 AP4 Line AP5 Line Booster To Main Injector

25 SNuMI scenarios Recycler without slip stacking Recycler with slip stacking Accumulator momentum stacking Booster batch intensity 4.7E124.3E124.6E12 No. Booster batches Booster average rep rate (Hz) MI cycle time (s) MI intensity (ppp) 2.8E134.9E138.3E13 Beam power to NuMI (kW) Protons/hr 7.6E161.3E172.2E17

26 8 GeV SC Linac a.k.a. Proton Driver a.k.a. High Intensity Neutrino Source (HINS) New* idea incorporating concepts from the ILC, the Spallation Neutron Source, RIA and APT.  Copy SNS, RIA, and J-PARC Linac design up to 1.3 GeV  Use ILC Cryomodules from GeV  H - Injection at 8 GeV in Main Injector “Super Beams” in Fermilab Main Injector:  2 MW Beam power at both 8 GeV and 120 GeV 150x10 12 protons per cycle  Small emittances => Small losses in Main Injector  Minimum (1.5 sec) cycle time (or less) * The 8 GeV Linac concept actually originated with Vinod Bharadwaj and Bob Noble in 1994,when it made no sense because the SCRF gradients weren’t there. Revived and expanded by G.W.Foster in 2004

27 ~ 700m Active Length 8 GeV Linac 8 GeV neutrino Main MW Anti- Proton SY-120 Fixed- Target Neutrino “Super- Beams” NUMI Off- Axis 8 GeV Superconducting Linac

28 β=1 Modulator β=1 Modulator 36 Cavites / Klystron ILC LINAC 8 Klystrons 288 Cavities in 36 Cryomodules 1300 MHz β=1 β<1 ILC LINAC 2 Klystrons 96 Elliptical Cavities 12 Cryomodules 1300 MHz GeV β=1 Modulator β=1 Modulator β=1 Modulator β=1 Modulator β=1 Modulator β=1 Modulator 10 MW ILC Multi-Beam Klystrons 48 Cavites / Klystron β=.81 Modulator β=.81 8 Cavites / Cryomodule 0.5 MW Initial 8 GeV Linac 11 Klystrons (2 types) 449 Cavities 51 Cryomodules “PULSED RIA” Front End Linac 325 MHz MeV H-RFQMEBTRTSRSSRDSR Single 3 MW JPARC Klystron Multi-Cavity Fanout at kW/cavity Phase and Amplitude Control w/ Ferrite Tuners DSR β=.47 Modulator β=.47β=.61 or… 325 MHz Spoke Resonators Elliptical Option Modulator 10 MW ILC Klystrons 80 % of the Production Cost ~80 % of the Engineering & Technical System Complexity

29 M Pulse Transformer& Oil Tank IGBT Switch & Bouncer CAP BANK 10 kV 110 kV Charging Supply 300kW MODULATOR: FNAL/TTF Reconfigurable for 1,2 or 3 msec beam pulse Single Klystron 325MHz 3 MW WR2300 Distribution Waveguide TOSHIBA E3740A IQMIQM E IQMIQM B IQMIQM T IQMIQM R F Q IQMIQM Cables to Tunnel Fast Ferrite Isolated I/Q Modulators RF Couplers S IQMIQM S IQMIQM R IQMIQM S IQMIQM S IQMIQM R IQMIQM 600kW 40 kW max D IQMIQM S IQMIQM R IQMIQM D IQMIQM S IQMIQM R IQMIQM 120 kW max 10kV H- Room Temperature Copper Cavities (16+2) Radio Frequency Quadrupole Cryomodule #1-2 SSR1 (18) Cryomodule #3-4 SSR2 (22) 60 kW max 325 MHz Front End a.k.a. One Klystron Linac

30 Proton Math Current complex No Improvements  Shared Beam  NuMI Alone Proton Plan Increase Beam Intensity  Shared Beam  NuMI Alone SNuMI – Recycler Reduce Cycle Time SNuMI – Accumulator Increase Beam Intensity HINS Increase Beam Intensity Protons ÷ Cycle Time =Power 25 x s200 kW 30 x s280 kW 37 x s320 kW 49 x s430 kW 49 x s700 kW 83 x s1200 kW 150 x s2200 kW

31 Schedule & Proton Power Projections Proton plan (in progress)  Ramp to a capacity of 430 kW in 2009 SNuMI Recycler/Accumulator upgrades (in design – not approved yet)  Long shutdowns in 2010 & 2011  Ramp to 1.2 MW (700 kW) in 2013 (2012) High Intensity Neutrino Source (under consideration / R&D)  2+ MW sometime in the future Note: ~ 1.7×10 7 s/yr (effective, at peak power) FERMILAB-BEAMS-DOC-2393

32 Lowering the primary proton energy ? D. Wolff  Injection dwell time 80 ms  Flattop time 50 ms  Maximum dp/dt 240 GeV/s 120 GeV, 1.34 s 50 GeV, 0.81 s 40 GeV, 0.73 s 30 GeV, 0.62 s  this is achievable now (conservative)  Faster ramps possible (with PS upgrades)

33 Proton Energy Scaling Some ideas for neutrino beams have lower primary energy Reducing proton beam energy does not results in an equal reduction in cycle time  Worst for upgrades where Booster is heavily utilized Neutrino beams based on lower-energy protons will have lower beam power HINS SNuMI – Accum. SNuMI – Recyc. Prot. Plan Current Sawtooth

34 Conclusions Fermilab proton complex can be upgraded to produce a Neutrino Superbeam  270 kW peak (170 kW ave.) available today  430 kW upgrades are in progress Proton Plan → E. Prebys et al.  700 kW & 1.2 MW upgrades are under study (likely if NO A) SNuMI → A. Marchionni et al.  ≥ 2 MW beams are under consideration – active R&D HINS → G. Appolinari et al. These later upgrades all are technically feasible for the accelerators  Limitations are resources and the capacity of the NuMI line