Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Booster Cogging Robert Zwaska Fermilab (University of Texas at Austin) Accelerator Physics & Technology Seminar Dec. 8, 2005.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
MAP Meeting, IUCFMarch 12-13, Progress in Barrier Stacking W. Chou, J.Griffin, K.Y. Ng, D. Wildman Fermilab Presented to MAP Meeting IUCF, Indiana.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
1 Accelerator upgrades for NuMI Robert Zwaska Fermilab August 6, 2006 NBI 2006.
SNuMI: Phase I & Phase II Nancy Grossman Phase I: $33.4M FY06$ (no contingency, no G&A) 41% contingency Phase II: $53.7M FY06$ (no contingency, no G&A)
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Proton Plan Eric Prebys, FNAL Accelerator Division.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Proton Source Reference Notes for mu2e at Fermilab 1 Section 1: Compilation of parameters describing the existing Fermilab accelerator complex and the.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Presentation transcript:

Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline I.Introduction to the accelerator complex II.Planned and possible upgrades III.Proton power projections

Making Neutrino Beams Two operating beams at Fermilab –Use 8 or 120 GeV protons –Secondaries produced with solid target and focused A rough figure of merit: proton power on target –Average current × Beam energy –120 GeV beam does better Other factors (not covered): –Neutrino beam elements & design –Detector size & design NuMI

The Main Injector Today Batch 1 (PBar) Batch 2 Batch 3 Batch 4 Batch 5 Batch 6 Booster Main Injector Provides high power, 120 GeV proton beam –80 kW for antiproton production –170 kW for neutrino production Takes 6 or 7 batches from the 8 GeV 15 Hz –4-5 × protons per Booster batch Total cycle time ≥ s + batches/15 NuMI

Past-Year NuMI Running Average power of 165 kW in the last few months Maximum beam power of 270 kW down the NuMI line (stably for ~ ½ hour) Peak intensity of 3×10 13 ppp on the NuMI target Protons per pulse (  ) May 1 ‘ March 1 ‘06 Power (kW ) 100 May 1 ‘05 March 1 ‘

1 st Booster Batch Injected into MI 2 nd Booster Batch Merged bunch train in MI EE  1 st Batch 2 nd Batch Decelerate Accelerate Time Merge two booster batches through RF manipulations K. Seiya et. al., PAC2003 Slip-stacking (Proton Plan)  Doubles the azimuthal charge in the Main Injector  Booster loading time is doubled → 440 kW of protons

SnuMI: Recycler as an 8 GeV proton accumulator After the Collider program is terminated, we can use the Recycler as a proton accumulator –Booster batches are injected at 15 Hz rep rate Accumulate protons from the Booster while MI is running –save 0.4 s for each 6 Booster batches injected Can also slip-stack beam in the Recycler –Up to 12 Booster batches injected (save 0.8 s) 5.4×10 13 ppp every s → 700 kW D. McGinnis, Beams-doc-1782, 2138

SNuMI: Momentum stacking in the Accumulator After the Collider program is terminated, we can also use the Accumulator in the Anti-proton Source as a proton accumulator –Momentum stack 4 (3) Booster in Accumulator batches every 267 (200) ms –Limit Booster batch size to ~ 4×10 12 protons –Box Car stack in the Recycler –Load in a new Accumulator batch every 267 (200) ms 6 Accumulator (24 or 18 Booster) batches in Recycler Load the Main Injector in a single turn 9.1×10 13 every 1.6 s → 1.1 MW –7.2×10 13 every 1.33 s → 1.0 MW D. McGinnis, Beams-doc-1782, 2138

High Intensity Neutrino Source 8 GeV Superconducting Linac as replacement for Booster –Nominal injection charge ~1.5×10 14 ppp Cycling every 1.4 s corresponds to a beam power of 2 MW at 120 GeV –Requires major upgrades to Main Injector RF Significant MI RF and magnet upgrades could reduce acceleration time –Maybe up to 4 MW

Proton Power Projections Proton plan (in progress) –Ramp to 440 kW in 2009 Recycler/Accumulator upgrades (in design – not approved yet) –One year shutdown in 2010 –Ramp to 1.1 MW (700 kW) in 2012 High Intensity Neutrino Source (under consideration) –2 MW sometime in the future Note: ~ 1.7×10 7 s/yr (effective, at peak power)

Lowering the primary proton energy ? D. Wolff  Injection dwell time 80 ms  Flattop time 50 ms  Maximum dp/dt 240 GeV/s 120 GeV, 1.34 s 50 GeV, 0.81 s 40 GeV, 0.73 s 30 GeV, 0.62 s  this is achievable now (conservative)  limit injection dwell time to ~ 30 ms ?  faster down ramp ?

Proton Energy Scaling Reducing proton beam energy does not results in an equal reduction in cycle time –Worst for cases where Booster is heavily utilized Neutrino beams based on lower-energy protons will have lower beam power

Conclusions Fermilab proton complex can be upgraded to produce a Neutrino Superbeam –320 kW peak (250 kW ave.) available today –440 kW upgrades are in progress Proton Plan → E. Prebys et al. –700 kW & 1.1 MW upgrades are under study (likely?) SNuMI → A. Marchionni et al. –≥ 2 MW beams are under consideration HINS → G. Appolinari et al. Primary proton energy needs to be understood –Lowering proton energy below 120 GeV always reduces the beam power on target Neutrino beam production needs to be considered –There is no beamline to Henderson –Does not need to be a conventional beam: Neutrino Factory (A. Tollestrup et al.) Beta Beam (A. Jansson)