Page 1 Project Information Active Projects Process Measures Business Impact (Closed Projects) Validation Execution 2009 % Validate Toll Gates on Time:

Slides:



Advertisements
Similar presentations
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
Advertisements

Six Sigma Kevin Curry TQM December 6, Six Sigma is a proven disciplined approach for improving measurable results Six Sigma is a proven disciplined.
Phase Difference = Phase Difference = 0.05.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Six Sigma TOTAL QUALITY MANAGEMENT 6 
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
SIX SIGMA. What is six sigma? Sigma is a measure of “goodness: the capability of a process to produce perfect work. A “defect” is any mistake that results.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Company Overview October Who is PSMG Results oriented consulting firm specializing in delivery of process improvement and leading edge business.
Development of Six Sigma
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Using Microsoft Project for Implementation of Six Sigma Projects A Tools and Tips Presentation Nora Gessert, Pcubed.
Six Sigma. What is Six Sigma??  A statistical concept that represents amount of variation in a process relative to a specification  % defect.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
DMAIC Process Storyboard
1-1 1 Quality Management Chapter Total Quality Management (TQM) Total quality management is defined as managing the entire organization so that.
Welcome to Lean Six Sigma Green Belt Training
E2 skills & competencies certification
The Office of Audit and Performance Manuel Mendez Director.
Nyttige implementeringsværktøjer Praktiske eksempler fra Lean Six Sigma Bo Maach-Møller.
Copyright © 2006 Six Sigma Academy International, LLC All rights reserved; for use only in compliance with SSA license. Rhodia – Deployment Champion Planning.
Starting at the right level
Items Required for Process Hand-off
TRAINING AND REALIZING RESULTS USING GREENBELT ACROSS DIVISIONS: A CASE STUDY WITH THE SCHOOL DISTRICT OF MENOMONEE FALLS Wisconsin State Education Convention.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
Alpharma Six Sigma Deployment Proposal November, 2003.
1) Replacing current DMAIC training for Green Belts
Chapter 8 Problem-Solving Using Define, Measure, Analyze, Improve, Control.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
CSE 577b - Six Sigma1 Outline What is Six Sigma? Six Sigma methodologies Process Improvement — DMAIC Define – Measure – Analyze – Design – Verify (DMADV)
Six Sigma102 The Define Phase of the DMAIC Model.
[Date] Next Review [Date] [Agency] Project Review 1.
Kaizen Event Flow Kaizen Facilitation Project Management.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Pg 0 Key Deployment Considerations Based on our experience we have noted.
Copyright © Six Sigma Academy International, LLC All rights reserved; for use only in compliance with SSA license. Client Update December 8 th,
Tyco Safety Products Six Sigma
Project Chartering & Approval Process
BVS Steering Committee Operation February Steering Committee Structure Six Sigma Steering Committee Six Sigma Steering Committee: Who…Client Sr.
Finance Support.
Six Sigma Project Communications Plan Laura Wells Master Black Belt Andrew Twadelle Vice President, Six Sigma.
TF&S – Deployment Structure February 24, Proposed Deployment Structure Exec. Consultant Paul Gillard TFS Ken Chmiel Division Steering Committee.
Communications. 2 The TFS Communication Plan Elements ◦Define Who – Why – How – When ◦Tagline message and Logo ◦Define and assemble Toolkits for Communicators.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Pg 0 What Has Changed Since Baltimore? Citizens State Of Business: -Economic.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Project Proposal Doucument Project Title 2015 APEC e-Learning Training Program Name of Presenter Date, 2015.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Путешествуй со мной и узнаешь, где я сегодня побывал.
Reduce Waste, Improve Processes, and Change Your Organization Travis Lozier.
TM 720: Statistical Process Control DMAIC Problem Solving
The Certified Quality Process Analyst Handbook Continuous Improvement Models Chapter 10: (1st edition) Chapter 6: ( 2nd edition) Presented by Dr. Joan.
Lean Six Sigma DMAIC Improvement Story
PROJECT FLOW MANAGEMENT A guide for GBs, BBs and MBBs
Improve Phase Welcome to Improve
E2 skills & competencies certification
Value Stream Management for Lean Healthcare
The Certified Quality Process Analyst Handbook Continuous Improvement Models Chapter 10: (1st edition) Chapter 6: ( 2nd edition) Presented by Dr. Joan.
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
The Define Phase Templates and Worksheets
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
The Certified Quality Process Analyst Handbook Continuous Improvement Models Chapter 10: (1st edition) Chapter 6: ( 2nd edition) Presented by Dr. Joan.
Value Stream Management for Lean Healthcare
The Certified Quality Process Handbook Chapter 6: Continuous Improvement Models (2nd edition) Chapter 10: Continuous Improvement Models (1st edition)
ورشة عمل استراتيجيات التحسين والتميُّز في الأداء
Program Content Day 1 Day 2 1. Introduction to Six Sigma Morning Break
LESSON 8-1 Recording Adjusting Entries
EDLC(Embedded system Development Life Cycle ).
JUST-DO PMP KAIZEN SIX SIGMA
The Certified Quality Process Analyst Handbook Continuous Improvement Models Chapter 10: (1st edition) Chapter 6: ( 2nd edition) Presented by Dr. Joan.
Thing / Person:____________________ Dates:_________________
The Certified Quality Process Analyst Handbook Continuous Improvement Models Chapter 6: ( 2nd edition) Chapter 7 - partial: ( 2nd edition) Presented.
Presentation transcript:

Page 1 Project Information Active Projects Process Measures Business Impact (Closed Projects) Validation Execution 2009 % Validate Toll Gates on Time: 0% Project Cycle Time X-Cal Six Sigma Scorecard (Aug09) Project Name Project Type Project Phase Project LeaderSponsor Accounts ReceivableKaizen BB CommissioningTBDNathan Validation Schedule (for completed projects) Project Type 2009 Cycle Time (Days) 2010 Cycle Time (Days) Kaizen BB DMAIC BB DMAIC GB Year # Closed ProjectsSavings 20090$ Project NameProject LeaderSponsorCurrent Plan Validation Close Date

Page X-Cal Proposed Project Launch Plan Color Key Kaizen Green Belt Project

Page 3 List of X-Cal Six Sigma Greenbelts Name here(no current active project)