Booster Beam Notching Overview for 2012 S. Chaurize December 7, 2011.

Slides:



Advertisements
Similar presentations
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Muon g-2 Experiment at Fermilab Recycler Extraction Kicker Dan Wolff/Chris Jensen 8/29/08.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Booster Cogging Bob Zwaska University of Texas at Austin Bill Pellico FNAL.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
Booster Beam Notching Installation Update PIP Talk Salah Chaurize February 20, 2013.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandra Bhat Todd’s Operation Meeting /12/2015 Chandra Bhat Abstract:
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
PAC Meeting, December 12, Prebys 1 The Problem.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PPP Booster. Outline of Booster PPP tasks Beam Quality Goals K Seiya W Pellico Injection Dave Johnson CY Tan W Pellico Capture CY Tan K Seiya W Pellico.
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
Choppers Comparison of three schemes of choppers is made 2.5 MeV and 2.1 MeV beam energies are considered Presented by Boris Shteynas May,
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LINAC4 ADVISORY COMMITTEE
Design Fabrication and Processing Group H. Padamsee
TE4862 Thyratron Power Triggering System for the CERN Kicker Systems
Fast losses at collimators during 16L2 dumps
PSB rf manipulations PSB cavities
FCC-hh injection group 7
Beam Injection and Extraction Scheme
CNGS Primary Beam Results 2010
Electron Source Configuration
2017 CAS Erice case study: Design of a beam dumping system for FCC
LHC Morning Meeting - G. Arduini
KICKER STATUS G-2 meeting March 5, 2014
Status of energy deposition studies IR7
A. Freyberg Aug 2016 ECT’16 =>
PSB magnetic cycle 900 ms MeV to 2 GeV
Kicker specifications for Damping Rings
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Presentation transcript:

Booster Beam Notching Overview for 2012 S. Chaurize December 7, 2011

Current Notching in 2011 – A 3 bucket gap is created using two kickers located at Long 5 and Long 12 Notcher – A High Voltage(55kV) Kicker at Long 5 Noker - Lower Voltage Kicker (20-40 kV) at Long 12 – Used to clean out remnant Notched Beam in buckets At 700 MeV – Beam is kicked vertically into collimator region at Long 6 and Long 13 with upstream gradient magnets seeing some deposited notched beam loss. – The notch timing and synchronization is accomplished by modules in the Booster LLRF Room and local timing modules. – Beam notch for non-cogged cycles occurs at 400 Mev – Cogged notch occurs close to 700 MeV

Notching in 2012 Phase 1 – A 3 bucket gap is created using three Long kickers located at Long 12 3 Notcher – High Voltage(46kV) Kicker at Long 12 Notcher converted to Notch1 Noker converted to Notch2 Build/Commission new Notch3 mostly with parts on hand. – Beam is kicked vertically Horizontally At L12 into new absorber at Long 13 – The notch timing and synchronization is accomplished by modules in Booster LLRF Room. (Same as before) – Beam notch for non-cogged cycles occurs at 400 Mev. (Same as before) – Cogged notch occurs close to 700 MeV. (Same as before)

The Notch 3 Bucket Notch Width non-cogged Cycle 400MeV Cogged Cycle ~700MeV Extraction Loss

L5 Notcher Current Location Notcher magnet will be moved to L12 Vertical Pinger magnet will be removed from L12 and put here in its placeNotcher Hor. Pinger

L6a Absorber/Collimator

L5 Notcher Power supply components such as these Will need to be moved to support Long 12 region CX1168 tube Low Level equipment CX1168 tube cabinet

L12 Noker Current Location Noker Beam direction

L12 Noker Current Location De-commissioned Horz. Pinger Ver. Pinger Noker MKS04 Beam direction

L12 Noker Current Location Notch3 MKS04 Notch2 Notch1

Kicker magnets rotated to kick Horizontally

L12 Noker & Extraction Kicker MKS04 Power supply components such as these will need to be installed/relocated to support notch2 & notch3 in east Booster Gallery CX1168 tube cabinet Beam sync Modules and other NIM crate Support modules.

Make Room For 2 more systems In East Gallery

Build another Thyratron Cabinet For Notch3

Long 13 Current Noked beam absorber Beam direction

Long 13 Current Noked beam absorber Beam direction

Notching in later 2012-Beyond Phase 2 – Convert 3 Long kicker magnet notchers to short doublets magnets – 6 short style kicker magnets would be driven by faster thyratrons to allow quicker fill times creating a cleaner notch – 2 short magnets will mount in the foot print of one long magnet(current) kicker.

New short kicker prototype faster rise/fill time

Short Kicker/Long kicker (25 ohm setup) on CX1168 Thyratron tube test-setup. J. Lackey, R. Mraz, S. Chaurize Typical Booster kicker rise time 40 ns MKS04 (Long Kicker) Rise = 30nS Fall = 50nS ShortKick (Short Kicker) Rise = 21nS Fall = 33nS

Conclusion – Phase 1 of new notching scheme should reduce extraction losses with a cleaner notch still using long kicker modules. – Losses will be better directed to a more optimized absorber close to the notching kickers. – Phase 2 will implement faster rise kicker modules to further reduce losses. – With higher beam throughput in 2012 and beyond this new notch system configuration should help reduce losses and minimize activation of critical areas in the Booster enclosure.

More L13 tunnel Pictures

10” 31””

30” 96” 24” 75” 18’-11 ” 12’-3 ” 10 ‘ All Measurements Approximate