Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.

Slides:



Advertisements
Similar presentations
Workshop on N* excitations at high Q 2 with CLAS12 Page 1 Workshop on N* Excitations at High Q 2 Welcome to Participants in the Workshop on Nucleon Resonance.
Advertisements

Future Sino-US Collaboration in QCD Phyics Ten-Year Anniversary of STAR-China Collaboration Haiyan Gao 高海燕 Duke University 1.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
1 Auteuil, Paris March 2011 Jefferson Lab The 12 GeV Era Hugh Montgomery.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
Thomas Jefferson National Accelerator Facility Page 1 Physics LRP December 8, 2011 Glenn R. Young Experimental Nuclear Physics Division Town Meeting Jefferson.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Hadron physics Hadron physics Challenges and Achievements Mikhail Bashkanov University of Edinburgh UK Nuclear Physics Summer School I.
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
MEIC: A Medium Energy Electron Ion Collider at Jefferson Lab QCD and Hadron Physics, Lanzhou March 30, 2013 R. D. McKeown Jefferson Lab College of William.
1 EIC Update R. D. McKeown Presentation to EICAC April 10, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, M. Farkhondeh, others)
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
MEIC: A Medium Energy Electron Ion Collider at Jefferson Lab Hadron Workshop, Huangshan July 2, 2013 R. D. McKeown Jefferson Lab College of William and.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
MEIC Detector Rolf Ent MEIC Accelerator Design Review September 15-16, 2010.
A.N.Sissakian, A.S.Sorin Very High Multiplicity Physics Seventh International Workshop JINR, Dubna, September 18, 2007 Status of the project NICA/MPD at.
Hadron Physics in America L. Cardman. Venues for Hadronic Physics Today (and their near-term plans) Two Major Facilities: Jefferson Lab (~6 GeV,
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Electron Ion Collider A. Accardi, R. Ent, V. Guzey, Tanja Horn, C. Hyde, A. Prokudin, P. Nadel-Turonski, C. Weiss, … + CASA/accelerator team LRP 2007 JLab.
Lattice /Detector Integration for Target Fragmentation, Diffraction, and other Low-t Processes Charles Hyde-Wright Old Dominion University
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
1 EIC Update R. D. McKeown Presentation to JSA Science Council January 7, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, others)
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Nuclear Physics at Jefferson Lab Part III R. D. McKeown Jefferson Lab College of William and Mary Taiwan Summer School June 30, 2011.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Charge and Overview: What are we trying to accomplish during this review L. Cardman.
Lab Update Rolf Ent January 21, January 2016 Page 2 Outline Near term schedule (note: will not include Hall C/12 GeV status as you will hear more.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
IR-Design 0.44 m Q5 D5 Q4 90 m 10 mrad m 3.67 mrad 60 m m 18.8 m 16.8 m 6.33 mrad 4 m Dipole © D.Trbojevic 30 GeV e GeV p.
JEFFERSON LAB CLOSE-OUT 6 GeV  Finish analysis on CLAS eg1-DVCS (SSAs + DSAs in   production with longitudinally polarized H and D targets) and.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
Transverse Spin Physics with an Electron Ion Collider Oleg Eyser 4 th International Workshop on Transverse Polarisation Phenomena in Hard Processes Chia,
Timelike Compton Scattering at JLab
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
Interaction Region and Detector
Jefferson Lab Overview
Future Trends in Nuclear Physics Computing Workshop
Report to UGBOD Bob McKeown January 14, 2016.
Future lepton scattering facilities
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
Jefferson Lab Status Bob McKeown May 6, 2016.
Plans for nucleon structure studies at PANDA
Samples of Hall B Results with Strong Italian Impact
Space Charge Effect Simulation Using DA Based FMM and Electron Cooling Simulation for JLab’s MEIC Project.
Introduction to Jefferson Lab
Nadia Fomin University of Virginia
for meson spectroscopy
Jefferson Lab Status Bob McKeown October 21, 2015.
View from Lab Management HPS Collaboration Meeting
Introduction and Workshop Charge
Schedule Rolf Ent HPS Meeting, May 22, 2018.
SOLID Collaboration Meeting
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012

Thomas Jefferson National Accelerator Facility R.. McKeown Page 2 Outline PAC and science program New Projects Update -Super Bigbite Spectrometer (SBS) -MOLLER -SoLID -others NSAC Subcommittee MEIC

Thomas Jefferson National Accelerator Facility R.. McKeown Page 3 PAC 39 Result (June 2012) Considered 13 new proposals, 6 previously conditionally approved, 3 Letters of Intent, 5 Proposals recommended for Approval 6 Proposals deferred 5 Conditionally approved (C1 – do not return to PAC) 3 Conditionally approved (C2 - must return to PAC)

Thomas Jefferson National Accelerator Facility R.. McKeown Page 4 12 GeV Approved Experiments by Physics Topics TopicHall A Hall BHall C Hall D Tota l The Hadron spectra as probes of QCD (GluEx and heavy baryon and meson spectroscopy) 112 The transverse structure of the hadrons (Elastic and transition Form Factors) 4329 The longitudinal structure of the hadrons (Unpolarized and polarized parton distribution functions) 2259 The 3D structure of the hadrons (Generalized Parton Distributions and Transverse Momentum Distributions) Hadrons and cold nuclear matter (Medium modification of the nucleons, quark hadronization, F N-N correlations, hypernuclear spectroscopy, few-body experiments) Low-energy tests of the Standard Model and Fundamental Symmetries 213 Total

Thomas Jefferson National Accelerator Facility R.. McKeown Page 5 12 GeV Approved Experiments by PAC Days More than 7 years of approved experiments

Thomas Jefferson National Accelerator Facility R.. McKeown Page 6 Proposal for Backlog Management Re-evaluate Priorities Timing: ~2015 Charge: select high impact experiments for 3 years (beyond commissioning) Nominally consider about 300 pac-days per hall Start with A rated approved experiments (+ selected others?) Equip. availability input from Hall Leaders

Thomas Jefferson National Accelerator Facility R.. McKeown Page 7 Other PAC Issues New charge (no longer “top ½ of first 5 years”) Reconsider proposal process for Hall B (parallel running) – possible impact on other halls (e.g., SoLID, Hall D) New categories for resource availability: - Stage I: resources need to be identified/obtained - Stage II: resources are essentially available

Thomas Jefferson National Accelerator Facility R.. McKeown Page 8 Future Projects Super BigBite Spectrometer (Approved for FY13-15 construction) - high Q 2 form factors - SIDIS MOLLER experiment (MIE – FY14-18?) - Standard Model Test SoLID (SIDIS, PVDIS) Chinese collaboration CLEO Solenoid? Directors review:

Thomas Jefferson National Accelerator Facility R.. McKeown Page 9 Other Projects/Upgrades Windowless target for proton charge radius experiment (NSF/MRI) Hall B (CLAS12): -Forward tagger (NSF/MRI + INFN) - planning for one-sector RICH for Hall B - Micromegas for CLAS12 (IRFU agreement) Backward-nucleon detector (Israel) and planning for  0 spectrometer in Hall C Planning for Cherenkov and FCAL upgrade in Hall D These are upgrades/enhancements to 12 GeV projects, still under development (various degrees).

Thomas Jefferson National Accelerator Facility R.. McKeown Page 10 Status: A’ Experiments APEX - completed test run (published) - awaiting radiation impact review, $$ HPS - completed parasitic test run, now C1 - review results, promote C1  Approval? - HEP funding… DarkLIGHT - completed test run at FEL - held briefing Oct. 22 for approval – more HW due - HEP/NP funding?

Thomas Jefferson National Accelerator Facility R.. McKeown Page 11 Charge to NSAC ( )

Thomas Jefferson National Accelerator Facility R.. McKeown Page 12 NSAC subcommittee events Subcommittee met May 15 for planning Presentations to subcommittee Sept. 7-9 NSAC, Sept. 21 Fall DNP (10/ Newport Beach, CA) - Thurs. evening: mini-Town meetings - Fri. evening: DNP Town Meeting Subcommittee meeting ~mid-Nov.? Report due: December 2012

Thomas Jefferson National Accelerator Facility R.. McKeown Page 13 White Paper 1Executive Summary 2Meson Spectroscopy, Hybrid Mesons & Confinement 3The Internal Structure of Hadrons 4QCD and Nuclei 5The Standard Model and Beyond 6 Appendix A: Experimental Equipment

Thomas Jefferson National Accelerator Facility R.. McKeown Page 14 Jlab Presentations (Sept. 8) 8-8:45MEP OverviewR. Holt 8:45-9:05JLab Recent AccomplishmentsR. Ent 9:05-9:35JLab Future Science ProgramR. McKeown 9:35-9:55Meson Spectroscopy and GlueXJ. Dudek 9:55-10:15Nucleon ImagingM. Guidal 10:15-10:30Break 10:30-10:5012 GeV Project StatusC. Rode 10:50-11:10 Accelerator ScienceA. Hutton 11:10-11:30Budget ImpactsA. Lung 11:30-11:45Summary and outlookH. Montgomery

Thomas Jefferson National Accelerator Facility R.. McKeown Page 15 Electron Ion Collider 15 NSAC 2007 Long-Range Plan: “An Electron-Ion Collider (EIC) with polarized beams has been embraced by the U.S. nuclear science community as embodying the vision for reaching the next QCD frontier. EIC would provide unique capabilities for the study of QCD well beyond those available at existing facilities worldwide and complementary to those planned for the next generation of accelerators in Europe and Asia.” White Paper developed by JLab/BNL communities, posted for comment JLab MEIC design well-developed, design report posted Next NSAC Long Range Plan?

Thomas Jefferson National Accelerator Facility R.. McKeown Page 16

Thomas Jefferson National Accelerator Facility R.. McKeown Page 17 MEIC Design Report ArXiv: Stable design for 3 years

Thomas Jefferson National Accelerator Facility R.. McKeown Page 18 Medium Energy JLab Concept Initial configuration (MEIC): 3-11 GeV on GeV ep/eA collider fully-polarized, longitudinal and transverse luminosity: up to few x e-nucleons cm -2 s -1 Upgradable to higher energies (250 GeV protons) Pre-booster Ion source Transfer beam line Medium energy IP Electron collider ring (3 to 12 GeV) Injector 12 GeV CEBAF SRF linac Warm large booster (up to 20 GeV) Cold ion collider ring (up to 100 GeV)

Thomas Jefferson National Accelerator Facility R.. McKeown Page 19 solenoid electron FFQs 50 mrad 0 mrad ion dipole w/ detectors ions electrons IP ion FFQs 2+3 m 2 m Detect particles with angles below 0.5 o beyond ion FFQs and in arcs. Need 4 m machine element free region detectors Central detector Detect particles with angles down to 0.5 o before ion FFQs. Need 1-2 Tm dipole. EM Calorimeter Hadron Calorimeter Muon Detector EM Calorimeter Solenoid yoke + Muon Detector TOF HTCC RICH RICH or DIRC/LTCC Tracking 4-5m Solenoid yoke + Hadronic Calorimeter Very-forward detector Large dipole 20 meter from IP (to correct the 50 mr ion horizontal crossing angle) allows for very-small angle detection (<0.3 o ). Need 20 m machine element free region Full MEIC: Full Acceptance Detector 7 meters Three-stage detection

Thomas Jefferson National Accelerator Facility R.. McKeown Page 20 Summary PAC process evolving to match 12 GeV program Revisit priorities with PAC in ~2015 Queue of projects is making progress We provided much input to NSAC subcommittee MEIC design, science case, moving forward