LNG Regulatory Update 2 nd Annual Global LNG Outlook October 27, 2005 Houston, Texas Jeff C. Wright, Chief Energy Infrastructure Policy Group Office of.

Slides:



Advertisements
Similar presentations
Pat Wood III, Chairman Federal Energy Regulatory Commission New Englands Platform for Infrastructure Development Boston September 13, 2004.
Advertisements

Cove Point On The One-yard Line WVONGA Fall Meeting September 11, 2013.
FERC 1 APGA Annual Conference Halifax, Nova Scotia FERC Priorities in an Evolving Natural Gas Market Suedeen G. Kelly Commissioner, FERC August 2, 2005.
1 The Honorable Suedeen G. Kelly Commissioner, Federal Energy Regulatory Commission IPAA 2004 Mid-Year Meeting June 14, 2004 “A FERC Perspective on Natural.
All Things Natural Gas Infrastructure, Rates and Policy
LNG A BRIDGE TO OUR ENERGY FUTURE. 2 This presentation contains certain statements that are, or may be deemed to be, “forward-looking statements” within.
Capitol Hill Ocean Week Managing Emerging Demands for LNG.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
Environmental Regulation and Liquefied Natural Gas Commissioner Suedeen G. Kelly, FERC Duke Environmental Law & Policy Forum November 19, 2004.
Pat Wood, III, Chairman Federal Energy Regulatory Commission Energy Infrastructure Washington D.C. April 5, 2005.
What’s Up With Infrastructure? Interstate Pipeline Regulatory Committee Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects.
Dena E. Wiggins February 16, 2015 National Association of Regulatory Utility Commissioners Winter Meeting CONNECTING THE DOTS: FROM THE WELLHEAD.
SEARUC 2003 Annual Meeting Pinehurst, North Carolina June 9, 2003 Pat Wood, III Federal Energy Regulatory Commission.
February 22, 2001 Alaskan Pipeline Meeting Agenda Introduction to Enron & El Paso Assessing the Alaskan Gas Impact Enron & El Paso Value Added.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
LNG Trade Prospects in the Atlantic Basin. Punchlines Atlantic LNG -- volume and facilities Trade volume will triple by 2010 Supply – flood of new projects.
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct of 2005 Effect on Review of LNG Facilities & Working with FERC CSO Annual meeting.
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
1 California’s Role in the West Coast and Pacific Basin LNG Markets.
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005.
Outlook on Natural Gas and LNG. Fuel Diversity in New England Recent build-out ~10,700 MW Gas-fired generation (% Total NE GWh) –1999: 16% –2003: 41%
NATURAL GAS ROUNDTABLE Commissioner Suedeen G. Kelly, FERC February 24, 2004 “Pending Natural Gas Issues”
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
Liquid Natural Gas (LNG) Facilities. LNG: What is it? Natural gas converted to liquid at -260 F Natural gas converted to liquid at -260 F 1/600 of original.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Robert Cupina, Principal Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Hot Button Issues and Priorities SGA Fall Leadership.
Commissioner Suedeen Kelly Federal Energy Regulatory Commission Energy Infrastructure in the West February 24, 2006.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct 2005 Authorities & FY06 Status of LNG Facilities and Pipelines IRWA Federal.
Public Symposium on LNG Bowdoin College Brunswick, Maine Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Regulatory Overview of LNG LSU Center for Energy Studies Energy Summit Baton Rouge, Louisiana October 20, 2005 Robert Cupina, Deputy Director, Office of.
FERC Organization Chart
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
Natural Gas Transmission Regulation in the US Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects Federal Energy Regulatory.
A wholly owned subsidiary of Cheniere Energy, Inc. American Stock Exchange: LNG Cheniere LNG Energy Summit 2004 “Securing Louisiana’s Economic Growth in.
Natural Gas: Fuel of Choice Indefinitely? By: John Harpole Presentation to: CREA Energy Innovations Summit October 28, 2013.
Regulation and Investment in the U.S. Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission GIE Annual Conference.
HYDROPOWER: A Comparative Energy Review J. Mark Robinson JMR Energy Infra, LLC NWHA February 23, 2011.
LNG in North America Tommy Stone – Vice President, Operations & Engineering Trunkline LNG Company, LLC – Lake Charles, LA Tommy Stone – Vice President,
FERC Office of Energy Projects 1 Global LNG Outlook 2004 Regulatory Status & Challenges in the U.S. Richard R. Hoffmann, Director Division of Gas – Environment.
= Yr NG price high point Data Source - AFDC. Natural gas prices historically have remained, in general, below crude oil prices, except during the winter.
The FERC Review Process and The Importance of Safe Pipeline and LNG Terminal Operation NASFM Annual Meeting- July 8, 2005 Office of Energy Projects Federal.
Usage Guidelines Slide Description: Cover Slide Usage: Introductory slide. Try to keep the slide title and subtitle short and clear. Optionally include.
Michael Dirrane Director, Northeast Marketing NASUCA 2012 Annual Meeting November 13, 2012.
LNG: Regulatory and Regional Considerations The Energy Council’s LNG/CNG Workshop Biloxi, Mississippi April 8, 2005 Robert Cupina, Deputy Director, Office.
Frank J. Macchiarola Executive Vice President May 6, 2015 Conference of Western Attorneys General The LNG Export Opportunity.
TEXAS TEXAS Current Status of Liquid Natural Gas Terminals & Offshore Wind Farms Jerry Patterson Commissioner Capitol Hill Ocean Week 2006 – State and.
THE NORTH AMERICAN LNG OPPORTUNITY APEGGA, Calgary, Alberta.
LNG USA Houston, Texas J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission September 23, 2004.
1 Federal Energy Regulatory Commission John M. Wood, Acting Director Division of Pipeline Certificates Office of Energy Projects FERC Update Florida Energy.
1 Energy Crisis and Solutions for California Oilfield Producers Gas Supply and Demand and Future Outlook Presented by William J. Keese, Chairman California.
California Energy Commission 1 California’s Role in the West Coast and Pacific Basin LNG Markets LNG Asia Pacific 2006 Event February 13, 2006 Seoul, Korea.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
Managing Our Future: A Case for LNG NARUC Summer Committee Meetings Keith Meyer President, Cheniere Marketing July 2007 CHENIERE ENERGY, INC.
Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure.
California Energy Commission LNG’s Role for Expanding Natural Gas Supplies and Update on West Coast Projects Presented to West Coast PTTC Workshop Valencia,
Landon Derentz Energy Policy Advisor Bureau of Energy Resources U.S. Department of State Shale Gas and Tight Oil Production in the United States 1.
Philadelphia’s LNG Controversy Samantha Linton ES 333 December 6, 2005.
Continuing Progress of LNG Terminals in the Gulf Coast Region
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure February 13, 2004.
LNG Terminal Permitting J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission before the California Senate Energy,
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
United States LNG Terminal Update
Natural Gas World Presentation T
CPES Meeting Cromwell, CT
Presentation transcript:

LNG Regulatory Update 2 nd Annual Global LNG Outlook October 27, 2005 Houston, Texas Jeff C. Wright, Chief Energy Infrastructure Policy Group Office of Energy Policy Federal Energy Regulatory Commission

FERC Office of Energy Projects 2 Alan Greenspan Chairman of the Board of Governors of the Federal Reserve System. July 20, 2005 “...the current and prospective expansion of U.S. capability to import liquefied natural gas will help ease longer-term natural gas stringencies and perhaps bring natural gas prices in the United States down to world levels.” June 10, 2003 “...we cannot, on the one hand, encourage the use of environmentally desirable natural gas in this country while being conflicted on larger imports of LNG.”

FERC Office of Energy Projects 3 Energy Policy Act of LNG Process coordination State and local considerations Pre-filing is mandatory Hackberry policy is now codified Cooperation with Dept. of Defense

FERC Office of Energy Projects 4 Energy Policy Act of LNG Process Coordination FERC is the exclusive siting authority and lead agency for processing FERC record is the one record upon which all appeals of Federal actions are based Judicial streamlining

FERC Office of Energy Projects 5 Governor shall appoint a state agency for consultation FERC must consult with this agency State may file a safety advisory report and FERC must review and respond State agency may conduct safety inspections FERC order must require an Emergency Response Plan which includes a cost- sharing plan Energy Policy Act of LNG State and Local Considerations

FERC Office of Energy Projects 6 Regulations issued on October 7 th Pre-filing is mandatory for all new LNG terminals and related facilities Mandatory pre-filing for expansions, if deemed appropriate Federal, state and local consideration/cooperation Energy Policy Act of LNG Pre-Filing

FERC Office of Energy Projects 7 FERC cannot deny an application on the basis that the LNG terminal will not be open access –Sunsets on January 1, 2015 Expansion of an existing LNG terminal will not result in subsidization of expansion capacity, degradation of service or undue discrimination to existing customers Energy Policy Act of LNG Hackberry Decision Codified

FERC Office of Energy Projects 8 MOU with Department of Defense Concurrence of Secretary of Defense Energy Policy Act of LNG Dept. of Defense

FERC Office of Energy Projects 9 Convene at least three forums within next year Identify and develop best practices for issues associated with LNG Energy Policy Act of LNG LNG Forums

FERC Office of Energy Projects 10 McMoRan (1,500) Compass Pass (1,000) Algonquin (800) Pearl Crossing (2,000) Golden Pass (2,000) Logan Lateral (Texas Eastern) (900) Seafarer Pipeline (El Paso) (800) Dominion Southern (200) Major Pipeline Projects Pending (MMcf/d) October BCF/D Total 879 Miles Dominion (700) Cameron (1,500) Columbia (172) Cheniere Creole Trail (3,300) ANR (168) Midwestern (120) Point Comfort (1,000) Cypress Pipeline (Southern Natural) (500) NE ConneXion (Tennessee) (800) Jewell Ridge (East Tennessee) (235) Triple-T Extension (Tennessee) (200) Florida Gas (160)

FERC Office of Energy Projects 11 Caledonia (11.7) Falcon MoBay (20.0) County Line (6.0) Copper Eagle (3.2) EnCana (8.0) Bluewater (27.0) Saltville (5.8) Columbia (12.4) Pine Prairie (24.0) Natural (10.0) Dominion (9.4) Texas Gas (8.2) Freebird (6.1) CenterPoint (15.0) Starks (19.2) Falcon Hill-Lake (10.4) Liberty (17.0) Petal (5.0) Port Barre (10.5) SemGas (5.5) Certificated Since 1/1/04 On The Horizon Currently Pending Storage Projects (Capacity in Bcf) October 2005 Falcon Worsham-Steed (12.0) Unocal Windy Hill (6.0) Columbia (16.4) Natural (10.0)

28 CONSTRUCTED A. Everett, MA : Bcfd (Tractebel - DOMAC) B. Cove Point, MD : 1.0 Bcfd (Dominion - Cove Point LNG) C. Elba Island, GA : 0.68 Bcfd (El Paso - Southern LNG) D. Lake Charles, LA : 1.0 Bcfd (Southern Union - Trunkline LNG) E. Gulf of Mexico: 0.5 Bcfd, (Gulf Gateway Energy Bridge - Excelerate Energy) APPROVED BY FERC 1. Lake Charles, LA: 0.8 Bcfd (Southern Union - Trunkline LNG) 2. Hackberry, LA : 1.5 Bcfd, (Sempra Energy) 3. Bahamas : 0.84 Bcfd, (AES Ocean Express)* 4. Bahamas : 0.83 Bcfd, (Calypso Tractebel)* 5. Freeport, TX : 1.5 Bcfd, (Cheniere/Freeport LNG Dev.) 6. Sabine, LA : 2.6 Bcfd (Cheniere LNG) 7. Elba Island, GA: 0.54 Bcfd (El Paso - Southern LNG) 8. Corpus Christi, TX: 2.6 Bcfd, (Cheniere LNG) 9. Corpus Christi, TX : 1.0 Bcfd (Vista Del Sol - ExxonMobil) 10. Fall River, MA : 0.8 Bcfd, (Weaver's Cove Energy/Hess LNG) 11. Sabine, TX : 1.0 Bcfd (Golden Pass - ExxonMobil) 12. Corpus Christi, TX: 1.0 Bcfd (Ingleside Energy - Occidental Energy Ventures) APPROVED BY MARAD/COAST GUARD 13. Port Pelican: 1.6 Bcfd, (Chevron Texaco) 14. Louisiana Offshore : 1.0 Bcfd (Gulf Landing - Shell) CANADIAN APPROVED TERMINALS 15. St. John, NB : 1.0 Bcfd, (Canaport - Irving Oil) 16. Point Tupper, NS 1.0 Bcf/d (Bear Head LNG - Anadarko) MEXICAN APPROVED TERMINALS 17. Altamira, Tamulipas : 0.7 Bcfd, (Shell/Total/Mitsui) 18. Baja California, MX : 1.0 Bcfd, (Sempra) 19. Baja California - Offshore : 1.4 Bcfd, (Chevron Texaco) PROPOSED TO FERC 20. Long Beach, CA : 0.7 Bcfd, (Mitsubishi/ConocoPhillips - Sound Energy Solutions) 21. Logan Township, NJ : 1.2 Bcfd (Crown Landing LNG - BP) 22. Bahamas : 0.5 Bcfd, (Seafarer - El Paso/FPL ) 23. Port Arthur, TX: 1.5 Bcfd (Sempra) 24. Cove Point, MD : 0.8 Bcfd (Dominion) 25. LI Sound, NY: 1.0 Bcfd (Broadwater Energy - TransCanada/Shell) 26. Pascagoula, MS: 1.0 Bcfd (Gulf LNG Energy LLC) 27. Bradwood, OR: 1.0 Bcfd (Northern Star LNG - Northern Star Natural Gas LLC) 28. Pascagoula, MS: 1.3 Bcfd (Casotte Landing - ChevronTexaco) 29. Cameron, LA: 3.3 Bcfd (Creole Trail LNG - Cheniere LNG) 30. Port Lavaca, TX: 1.0 Bcfd (Calhoun LNG - Gulf Coast LNG Partners) 31. Freeport, TX: 2.5 Bcfd (Cheniere/Freeport LNG Dev. - Expansion) 32. Sabine, LA: 1.4 Bcfd (Cheniere LNG - Expansion) PROPOSED TO MARAD/COAST GUARD 33. California Offshore: 1.5 Bcfd (Cabrillo Port - BHP Billiton) 34. So. California Offshore : 0.5 Bcfd, (Crystal Energy) 35. Louisiana Offshore : 1.0 Bcfd (Main Pass McMoRan Exp.) 36. Gulf of Mexico: 1.0 Bcfd (Compass Port - ConocoPhillips) 37. Gulf of Mexico: 2.8 Bcfd (Pearl Crossing - ExxonMobil) 38. Gulf of Mexico: 1.5 Bcfd (Beacon Port Clean Energy Terminal - ConocoPhillips) 39. Offshore Boston, MA: 0.4 Bcfd (Neptune LNG - Tractebel) 40. Offshore Boston, MA: 0.8 Bcfd (Northeast Gateway - Excelerate Energy) Existing and Proposed North American LNG Terminals As of October 24, 2005 FERC Office of Energy Projects A B US Jurisdiction FERC US Coast Guard * US pipeline approved; LNG terminal pending in Bahamas C 2 D ,31 9 6, E

POTENTIAL U.S. SITES IDENTIFIED BY PROJECT SPONSORS 41. Coos Bay, OR: 0.13 Bcfd, (Energy Projects Development) 42. California - Offshore: 0.75 Bcfd, (Chevron Texaco) 43. Pleasant Point, ME : 0.5 Bcfd (Quoddy Bay, LLC) 44. St. Helens, OR: 0.7 Bcfd (Port Westward LNG LLC) 45. Galveston, TX: 1.2 Bcfd (Pelican Island - BP) 46. Philadelphia, PA: 0.6 Bcfd (Freedom Energy Center - PGW) 47. Astoria, OR: 1.0 Bcfd (Skipanon LNG - Calpine) 48. Robbinston, ME: 0.5 Bcfd (Downeast LNG - Kestrel Energy/Dean Girdis) 49. Boston, MA: 0.8 Bcfd (AES Battery Rock LLC - AES Corp.) 50. Calais, ME: ? Bcfd (BP Consulting LLC) POTENTIAL CANADIAN SITES IDENTIFIED BY PROJECT SPONSORS 51. Quebec City, QC : 0.5 Bcfd (Project Rabaska - Enbridge/Gaz Met/Gaz de France) 52. Rivière-du- Loup, QC: 0.5 Bcfd (Cacouna Energy - TransCanada/PetroCanada) 53. Kitimat, BC: 0.61 Bcfd (Galveston LNG) 54. Prince Rupert, BC: 0.30 Bcfd (WestPac Terminals) 55. Goldboro, NS 1.0 Bcfd (Keltic Petrochemicals) POTENTIAL MEXICAN SITES IDENTIFIED BY PROJECT SPONSORS 56. Lázaro Cárdenas, MX : 0.5 Bcfd (Tractebel/Repsol) 57. Puerto Libertad, MX: 1.3 Bcfd (Sonora Pacific LNG) 58. Offshore Gulf, MX: 1.0 Bcfd (Dorado - Tidelands) 59. Manzanillo, MX: 0.5 Bcfd 60. Topolobampo, MX: 0.5 Bcfd Potential North American LNG Terminals As of October 24, 2005 FERC Office of Energy Projects US Jurisdiction FERC US Coast Guard

FERC 14 Maximum LNG Deliverability Growth ++++

FERC 15 US Natural Gas Balance