MANAGING PROJECT RESOURCES

Slides:



Advertisements
Similar presentations
Project Management A Managerial Approach
Advertisements

Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 © 2007 Pearson Education.
Project Scheduling: Lagging, Crashing and Activity Networks
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
ELC 347 project management Week 11. Agenda Integrative Project –3rd part Graded –4 th part due next week –Outline of deliverables (posted in WebCT)Outline.
MGMT 483 – Week 11.  The issues involved in developing a project plan and schedule in the face of constrained resources (people or facilities)  Critical.
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
12-1 Resource Management Chapter 12 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Network Analysis and Duration Estimating Kathy S. Schwaig.
Resource Management Chapter 12.
Project Management 6e..
Resource Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 22.
Project Scheduling: Networks, Duration estimation, and Critical Path.
Project Management: A Managerial Approach
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
9-1 Resource Allocation Some definitions Resource allocation, loading, leveling Expediting and crashing projects Goldratt’s “Critical Chain”
Project Management: A Managerial Approach 4/e
12-1 ELC 347 project management Week Agenda Integrative Project –4 th part Corrected.. Fedd back sent –5 Th part due –Outline of deliverables.
Chapter 16 – Project Management
Project Management: A Managerial Approach
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
MANAGING PROJECT RESOURCES
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Allocating Resources to the Project
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 9 – Resource Allocation.
Resource Management. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall12-2 Types of Constraints  Time  Resource  Mixed Copyright.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Network Planning Methods Example PERT & CPM
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Resource analysis Project management (lecture + seminar)
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Lags in Precedence Relationships
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Resource analysis 1 Project management (seminar).
Allocate and Level Project Resources.  Resource Allocation: Defined Resource Allocation Resource Allocation is the scheduling of activities and the resources.
ALLOCATE AND LEVEL RESOURCES
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
12-1 Resource Management Chapter 12 © 2007 Pearson Education.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Time-Cost Trade-off Models
Chapter 16 – Project Management
Project Management.
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Magister Sistem Informasi Universitas Komputer Indonesia
ELC 347 project management
ENGINEERING MANAGEMENT (GE 404)
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Project Scheduling: Lagging, Crashing and Activity Networks
Resource Management Chapter 12
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Project management (seminar)
ELC 347 project management
ELC 347 project management
ELC 347 project management
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
University of Debrecen Mongolian University of Life Sciences
Resource Management Chapter 12
Presentation transcript:

MANAGING PROJECT RESOURCES PART 2

Project Crashing The process of accelerating a project is referred as crashing. Crashing a project relates to resource commitment; the more resources expended, the faster the project will finish. There are several reasons to crash a project: Initial schedule was too optimistic Market needs change and the project is in demand earlier than anticipated The project has slipped considerably behind schedule There are contractual late penalties

Project Crashing Principal methods for crashing Improving existing resources’ productivity Changing work methods Increasing the quantity of resources Increasing the quantity of resources is the most commonly used method for project crashing. There are 2 approaches: Working current resources for longer hours (overtime, weekend work) Adding more personnel

Project Crashing Time-Cost Trade-Offs for Crashing Activities Fully expedited (no expense is spared) Time-Cost Trade-Offs for Crashing Activities

Project Crashing In analyzing crash options, the goal is to find the point at which time and cost trade-offs are optimized. Various combinations of time-cost trade-offs for crash options can be determined by using the following formula: Slope = crash cost – normal cost normal time – crash time

Example 8 – 5 3 SUPPOSE: NORMAL ACTIVITY DURATION = 8 WEEKS NORMAL COST = $14,000 CRASHED ACTIVITY DURATION = 5 WEEKS CRASHED COST = $23,000 THE ACTIVITY COST SLOPE = 23,000 – 14,000 OR $9,000 = $3,000 per week 8 – 5 3 Cease crashing when the target completion time is reached the crash cost exceeds the penalty cost

Example a) Calculate the per day costs for crashing each activity Normal Crashed Activity Duration Cost Duration Cost A 4 days $1,000 3 days $2,000 B 5 days $2,500 3 days $5,000 C 3 days $750 2 days $1,200 D 7 days $3,500 5 days $5,000 E 2 days $500 1 day $2,000 F 5 days $2,000 4 days $3,000 G 9 days $4,500 7 days $6,300 a) Calculate the per day costs for crashing each activity b) Which are the most attractive candidates for crashing? Why?

Example Activity Per Day Cost A $1,000 B $1,250 C $450 D $750 E $1,500 F $1,000 G $900

Resource Allocation Problem A shortcoming of most scheduling procedures is that they do not address the issues of resource utilization and availability. Scheduling procedures tend to focus on time rather than physical resources.

Resource Allocation Problem Schedules should be evaluated not merely in terms of meeting project milestones, but also in terms of the timing and use of scarce resources. A fundamental measure of the project manager’s success in project management is the skill with which the trade-offs among performance, time, and cost are managed. “I can shorten this project by 1 day at a cost of $400. Should I do it?”

Resource Allocation Problem The extreme points of the relationship between time use and resource use are the following: Time Limited: The project must be finished by a certain time, using as few resources as possible. But it is time, not resource usage, that is critical Resource Limited: The project must be finished as soon as possible, but without exceeding some specific level of resource usage or some general resource constraint

Resource Loading Resource loading describes the amounts of individual resources an existing schedule requires during specific time periods The loads (requirements) of each resource type are listed as a function of time period Resource loading gives a general understanding of the demands a project or set of projects will make on a firm’s resources

Resource Loading The project manager must be aware of the ebbs and flows of usage for each input resource throughout the life of the project. It is the project manager’s responsibility to ensure that the required resources, in the required amounts, are available when and where they are needed.

Resource Loading Table

Resource Leveling (Smooting) Resource leveling aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances. The purpose is to create a smoother distribution of resource usage. Resource leveling, referred to as resource smoothing, has two objectives: To determine the resource requirements so that they will be available at the right time, To allow each activity to be scheduled with the smoothest possible transition across usage levels

Resource Leveling (Smooting) Resource management is a multivariate, combinatorial problem, i.e. multiple solutions with many variables, the mathematically optimal solution may be difficult or infeasible. More common approach to analyzing resource leveling problems is to apply some resource leveling heuristics.

Resource Leveling Heuristics Prioritizing resource allocation include applying resources to activities: with the smallest amount of slack with the smallest duration that start earliest with the most successor tasks requiring the most resources

Resource Leveling Steps Create a project activity network diagram Create a table showing the resources required for each activity, durations, and the total float available Develop a time-phased resource loading table Identify any resource conflicts and begin to smooth the loading table using one or more heuristics

Resource Loading Chart Display the amount of resources required as a function of time. 0 A 4 Res = 6 4 B 5 Res = 2 5 D 9 Res = 7 9 E 11 Res = 3 4 C 7 Res = 2 11 F 12 Res = 6 Start with a network diagram

Resource Loading Charts Activity Resource Duration ES Slack LF A 6 4 B 2 1 5 C 3 11 D 7 9 E F 12 Produce a table that shows the duration, early start, late finish, slack, and resource(s) required for each activity.

Resource Loading Charts Draw an initial loading chart with each activity scheduled at its ES. A 2 4 6 8 12 10 14 C B D E F Project Days Resources Resource imbalance

Resource Loading Charts Rearrange activities within their slack to create a more level profile. Splitting C creates a more level project. A 2 4 6 8 12 10 14 C B D E F Project Days Resources

Resource Loading Chart