CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.

Slides:



Advertisements
Similar presentations
Pertemuan ofc Matakuliah: M0304/Corporate Information System Management Tahun: 2008.
Advertisements

Cost Estimation and Budgeting
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Cost Management Estimation Budget Cost Control
Time and Cost Estimation
What is Project Cost Management?
Project Management Basics
LSU 07/25/2004Estimating Costs1 Estimating Project Costs & Time Project Management Unit, Lecture 5.
Budgeting and Cost Estimation
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
S/W Project Management
Chapter 4 ©2001 South-Western College Publishing Pamela S. Lewis Stephen H. Goodman Patricia M. Fandt Slides Prepared by Bruce R. Barringer University.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
1 Outsourcing: Managing the relationship Example: Reclining chair project FIGURE 12.1.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Review network diagram Forward/backward pass Critical path/activities Float Funding a project Costs estimates Type of costs Financial reports 7-1.
Setting Your Fees Project Cost and Setting Your Fees.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Chapter 4: Project Cost Management
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Project Life Cycle.
Controlling MRK151 Chapter 6. Controlling Detecting and correcting significant variations in the results obtained from planned activities. Controlling.
Welcome to Session 3 – Project Management Process Overview
Management & Development of Complex Projects Course Code - 706
Work Breakdown Structure Use and Demo
In Chapter 4: Budgeting the Project Budgeting: the process of forecasting what resources the project will require. Cost estimating process: evaluating.
Project Cost Estimation. 2 What is Cost and Project Cost Management? Cost is a resource sacrificed or foregone to achieve a specific objective, or something.
Elmar Meyer Pierre Janse van Vuuren Nathi Ndlovu Ferdinand Chauke Moses Fakude 9/15/20101PMP Exam Prep.
~ pertemuan 9 ~ Oleh: Ir. Abdul Hayat, MTI April 2009 [Abdul Hayat, Project Cost Management-1, Semester Genap 2008/2009] 1 PROJECT COST MANAGEMENT (1)
Chapter 7 Budgeting: Estimating Costs and Risks © 2012 John Wiley & Sons Inc.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Project Cost Management
4-1 Chapter 4 Budgeting the Project. 4-2 Introduction 4 Budgets are plans for allocating organizational resources to project activities. –forecasting.
Chapter 14 Pricing and Estimating. Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information.
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Budgetary and Cost.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Management & Development of Complex Projects Course Code - 706
MEM 612 Project Management
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Lecture #10 UNIT SEVEN OPERATIONS MANAGEMENT. An area of business concerned with the production of goods & services & involves the responsibility of ensuring.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SOFTWARE PROJECT MANAGEMENT
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Budgeting and Cost Estimation
Systems Analysis and Design in a Changing World, 4th Edition
Cost Estimation and Budgeting
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Chapter 4 Budgeting the Project.
Budgeting: Estimating Costs and Risks
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Budgeting: Estimating Costs and Risks
What is Project Cost Management?
Project Management Process Groups
PowerPoint presentation
Estimating Projects Estimating Types of Estimates
Evaluating the Performance of Salespeople
Presentation transcript:

CS-411W VIII – Budgeting, Costing, and Pricing

Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically investment dollars, labor costs, materials costs, subcontract costs, overhead expenses etc. Price - the amount of payment or compensation established for a good, service or asset. Profit – the difference between Price and Cost Loss – occurs when Cost is greater than Price

Definitions (cont) PriceCost Profit Operating at a Profit PriceCost Profit (Loss) Operating at a Loss

Definitions (cont) Cost Estimate - an assessment, approximation, or estimate of the investment of labor, materials, and overhead expenses required to complete a project or task. –Based on analysis and judgment –Result of a formal or an informal process –May employ metrics/historical data (lines of code per man day etc.)

Definitions (cont) Budget –the process of combining the estimated costs of individual activities or work packages to establish a baseline profile of project costs over time –Also provides a plan for obtaining resources and tracking costs throughout the project life-cycle –Requires having all cost estimating processes completed –Most common methods: Top Down, Bottom Up, Iterative

Definitions (cont) Cost Management – the processes required to ensure that a project team completes a project within approved budget. Successful cost management requires: –Well-defined project scope –Accurate cost estimates –Realistic budget

Estimating Costs Elements of Cost –Labor –Materials –External Resources Subcontractors Consultants, etc. –Overhead Expenses Facilities/Utilities Benefits Taxes Management Costs Financing

Estimating Costs Factors Affecting Cost –Specification of Scope and/or Requirements: more detail allows better cost estimating Detailed requirements provides for better task breakdown Less contingency required for uncertainty –Experience of Project Team Highly experienced teams typically more efficient in achieving project objectives Highly experienced team members typically more expensive (per labor hour) Balance of experience and labor cost must be achieved

Estimating Costs Factors Affecting Cost (cont) –Project Schedule Highly compact schedule requires on-demand availability of resources, experienced team and short lead time on materials and equipment Long, disjointed schedule injects dead-time, allows for loss of momentum and focus and inefficient use of resources Realistic schedule based on team experience and availability of resources most cost effective

Estimating Costs Factors Affecting Cost (cont) –External Factors Availability of specialty equipment, materials, or experience Economic factors - such as lending rates, currency exchange rates when dealing with “offshore” partners and vendors World affairs – such as increased fuel costs affecting travel and shipping rates, high demand for unique personnel experience or products critical to completion of the project –Simple example: building materials costs skyrocketed after Katrina. Projects dependent on availability of materials at a market price that pre-dated Katrina suffered significant adverse cost impact (I.e. less profit – or more loss)

Estimating Costs Types of Cost Estimates –Rough Order of Magnitude (ROM) –Budgetary –Definitive

Estimating Costs Rough Order of Magnitude (ROM) –Typically a best-estimate based on similar (prior) efforts, experience, and various assumptions –Should be “high” to provide for downward adjustment as more detail is available –Provided purely for planning purposes to establish an initial framework or upper boundary for estimated costs

Estimating Costs Budgetary Estimate –Provided when more detail is available regarding project scope, schedule, etc. –Established based on preliminary cost estimates and anticipated project schedule –Typically accurate to within 25% of final budget

Estimating Costs Definitive Estimate –Final assessment based on all available information –Addresses scope, resource availability, external costs (materials, subcontracors, other factors), and schedule –Includes appropriate contingencies for scope, schedule, and other risk uncertainties

Budget Preparation Methods: –Top-down: Budgets for top level tasks established first – then broken down to lower-level task allocations –Bottom-up: Budgets for lowest-level tasks established first – then rolled up to establish upper-level budgets –Iterative: Budgets are established at each level by responsible person(s) assigned. Upper-level budgets are established as an outcome of a negotiation between upper and lower-level estimates

Top Down Budgeting –Process High-level budget made first High-level budget used to dictate low level budgets –Advantages Provides high degree of control for experienced managers Helps address overlap between tasks –Disadvantages Lower-level tasks may be under-funded Individuals responsible for lower level tasks may not have a sense of ownership for the budget Budget Preparation

Bottom Up Budgeting –Process Budgets established at lower-levels first Lower-level budgets combined to establish upper-level budgets –Advantages High degree of accuracy for individual tasks Individuals responsible for low-level tasks “own” the budgets (i.e. they developed them). –Disadvantages More tendency towards duplication where tasks partially overlap (I.e. each task treated in isolation) Roll-up of lower-level budgets to overall budget frequently exceeds overall budget constraints (due to duplication in estimates and inflated low-level estimates).

Budget Preparation Iterative Budgeting –Process Obtain budget estimates at each level Negotiate between upper and lower-levels to agree on a final budget –Advantages Establishes ownership of budgets at all levels Provides good mechanism for identifying tradeoffs necessary to meet budgeting goals and disseminating ideas throughout the project team –Disadvantages Time-consuming process typically required to negotiate budgets between levels Final Budget Estimated Budget

Profile of Top-Level Tasks as proportion of Overall Budget

Relationship Between Cost Estimate and Budget

Pricing Concepts Revisited: Cost is the total of all expenses associated with completing a project Price is the total amount of compensation received for completion of a project or sale of a product Profit is the difference between Cost and Price PriceCost Profit

Pricing Factors Affecting Price and Profitability –Competitive Environment: More competition drives Price down –Degree of Specialization: Requirement for highly specialized skill set, experience, or equipment reduces competitive field and typically drives price up –Risk and/or Uncertainty: Degree of risk or uncertainty associated with technical, schedule, or performance aspects increases cost or profit contingencies associated with risk and increase price