Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.

Slides:



Advertisements
Similar presentations
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Advertisements

D-Link Assist Introduction Neil Patel October 2010.
WAREHOUSING MANAGEMENT
2.01C - Explain company selling policies.
Intracompany Stock Transfer Scenario Overview
 Corporate Profile  BOSS Overview  Current Solutions  BOSS Modules  COLORS - New BOSS Web Module  BOSS Benefits  Supplier XML Services and BOSS.
The 5-slot 4U DC chassis is one of a line of products that Asis has developed over the years with it’s vas experience in the ATCA field. Asis AdvancedTCA.
The 5-slot 5U AC Chassis,fully field deployable chassis with AC power supply for full redundancy. AsisAdvancedTCA Class Asis AdvancedTCA Class.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
Implementation of Non Effective Days Nexus Workgroup – March
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Module 8 Installation & Setup M1000e Chassis
Solution Overview for NIPDEC- CDAP July 15, 2005.
From Research Prototype to Production
High Sensitivity Smoke Detection
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Developed by Cool Pictures & MultiMedia PresentationsCopyright © 2004 by South-Western, a division of Thomson Learning. All rights reserved. Logistics.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
Distribution Customer Services and Logistics
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Life cycle services for automation products
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
The 2-slot 2U DC chassis is one of a line of products that Asis has developed over the years with it’s vast experience in the ATCA field. Asis AdvancedTCA.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Microsoft Dynamics ® NAV 2009 Service Management.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
State of Georgia Release Management Training
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
16/05/03Climatic Chamber & Testbench - Sophie Baron 1 Climatic Chamber & Testbench.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets Friedrich Fix 1 AdvancedTCA Systems Platforms according to PICMG.
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Intracompany Stock Transfer Scenario Overview
ATF2 Magnet Power Supplies
ALICE Muon Tracking Upgrade EDR Answers
PURCHASING AND SUPPLY MANAGEMENT
TTC System Status May 2007 System overview Production Status
Evaluation and testing of advanced low-voltage power supplies
Intracompany Stock Transfer Scenario Overview
GlueX Electronics Review Jefferson Lab July 23-24, 2003
SCT/Pixel Draft Rack Layout rcj
Sales Order Process.
Order-to-Cash (Specified Products) Scenario Overview
Track Finder Crate, Backplane and Parts
TileCal ROD Commissioning Counting Room Installation
Intracompany Stock Transfer Scenario Overview
Amendment Invoice Task Force Progress Report
Customer Contract Management Scenario Overview
Order-to-Cash (Specified Products) Scenario Overview
Front End Driver (FED) Crates and Racks +Tracker PSU racks
CAN branch PSU – Update meeting
Krzysztof Czuba ESS LLRF Quarterly Meeting
Presentation transcript:

Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004

2 Sept ph VME crates Introduction LHC crates contract Supplier - Wiener (Plein & Baus) Gmbh Schedule - Single annual order, 3 fixed deliveries ESS handles – Contract, Ordering, Reception, Inspection, Inventory & database, Forwarding and Support deliveries Deliveries 1 & 2 complete (32+38 crates) Delivery 3 expected mid Nov (75 crates)

3 Sept ph VME crates Technical overview Crate configuration options 6U / 9U Local / Remote PSU Air / Water cooled Standard / Lab variant Backplane options – VME64x, VME64xP, CPCI, Custom, J3… Other – Fan tray depth, Slot depth, 6U/9U slot options Communication – CAN as standard, TCP/IP & RS232 Rad/Mag tolerant crates ’05

4 Sept ph VME crates Crate configurations 6URemoteLocal 9URemoteLocal

5 Sept ph VME crates Crate variations Initial plans were to provide a number of ‘standard’ crates There are now 31 different types of crates & 36 PSU configurations on the inventory For support & administrative reasons it is necessary that this list does not grow any more Review the pre-existing options, there is almost certainly a suitable solution Guidance can be provided of selection of the best solution

6 Sept ph VME crates Water-cooling (PSU’s) To date: Pre-production prototypes evaluated by ESS In collaboration with Wiener, several changes made to improve reliability & cooling efficiency A few intermediate delivered to users Have been recalled for the above modification Considerations Will require care with cooling water installation to achieve required flow rate (≈1 l/min) Power supply is ‘shunted’ by rack heat- exchangers

7 Sept ph VME crates Water cooling performance LHC w/c PSU – Cyan & dark violet curves. Note that the number of internal modules affects pressure / flow characteristic.

8 Sept ph VME crates Cable management In ‘remote’ PSU configurations, the loom of DC cables from the PSU to the crate required management, to ensure: Minimum length (dynamic load requirement) Full access to rear transition area Minimize conflict with experimental cables in the rack Ensure cables are undamaged by access operations All remote PSU ‘bins’ will now include cable management (next slide) Ensure that there are no conflicts with other services (water, experimental cables)

9 Sept ph VME crates Cable management

10 Sept ph VME crates Cooling A number of instances of Slot 1 (2,3,4) cooling problems have been seen. ESS\Wiener are investigating methods of mitigating this classic issue, including: airflow modification, assisted force cooling In the meantime… All crates are now supplied with Information sheets giving guidance on a few key aspects. All 9U crates supplied in 2005 onwards will have a blanking panel fitted to the J3 area, if there is nothing ordered in this position. Users may remove this if required to fit a J3 backplane. This should improve the overall airflow in the crate.

11 Sept ph VME crates Rad/Mag tolerant crates  Prototype – 9U, no fan tray, VME64x  PSU water cooled with remote AC/DC & control board 9U LHC Crate Variant 1 Water Cooled Power Supply 766mm 726mm 840mm 1U726mm 9U 690mm 6Ux160mm Board 6U SUBRACK POWER SUPPLY FAN TRAY J1 RP0 9Ux400mm Board J0 9Ux220mm Board J2 RP2 WATER COOLED POWER SUPPLY Power Connection AC/DC 6U Control in crate Mains Hostile Safe

12 Sept ph VME crates Questions? Any Technical Questions?

13 Sept ph VME crates Ordering for 2005 No major change from 2004 Costs Updated price list available from October Normal annual increase from Wiener PH-ESS will add a supplement to cover variations in the CHF/EUR exchange rate and transport (~2%) Discuss your requirements with Paul Harwood Technical Information: Delivery schedule (which batch?) Deliveries in 3 batches May, August and November 2005

14 Sept ph VME crates Ordering for 2005 Deliveries In 2003/4 a considerable number of crates have been forwarded outside CERN, with increasing volumes this will no longer be possible ESS will only now deliver by Internal Transport Users must arrange their own onward shipping if necessary Order amendments Several instances of order amendments have occurred in 2004 This is often expensive, and creates a large workload Please ensure crate orders are correct at the time of ordering Spares ESS do not hold spares for crates Each experiment / user should evaluate their needs and ensure that spares are maintained as necessary

15 Sept ph VME crates Timescales (deadlines) Requirements (Sept - Dec) Discussion of requirements / prices / delivery Internal orders confirmed (End of Dec) All requirements must be received by this date Prepayment (January) PH-ESS issue TIDs, which must be approved before order will be placed (by 31 st Jan) External order placed(Feb 1 st ) PH-ESS issues release order to supplier Deliveries 12, 24, 36 wks after release order

16 Sept ph VME crates Database ESS maintains a database of LHC crates Used for: Finding crate components / prices Order tracking & delivery information Inventory (bar code labels) & owner info Commercial & technical history Actions recorded: Order status, delivery date, warranty info, reception, testing, dispatch, fault records, repair…. Users may now access this database and select “LHC crates – Public” Database is password protected for commercial reasons, please apply to ESS for access

17 Sept ph VME crates Discussion Any Questions? Any other points to raise?