ERTAC 1DRAFT - DO NOT DISTRIBUTE. Presentation Overview 1.Process Overview and Timelines 2.Inputs 3.Algorithm Details 4.Results 5.Outstanding issues 2DRAFT.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

EPA’S DRAFT GUIDELINES TO STATES FOR THE DEVELOPMENT OF STATE 111(d) PLANS MIDWESTERN POWER SECTOR COLLABORATIVE JUNE 17, 2014 FRANZ LITZ PROGRAM CONSULTANT.
Will CO2 Change What We Do?
ERTAC EGU MACE/MACW Case Study December 10, 2012 DRAFT - DO NOT DISTRIBUTE1.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
ERTAC EGU Growth Model Executive Summary September
Draft-Version #17 12/20/10 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
Draft-Version #19 5/15/13 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD Hourly.
The Monte Carlo Method A Case Study for 1-Hour NO2 Modeled Impacts Greg Quina SC DHEC Bureau of Air Quality
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Review May 7 th, 8 th 2009 Model Overview Presented by Walter Short Stochastic Energy Deployment System (SEDS)
SGM P.R. Shukla. Second Generation Model Top-Down Economic Models  Project baseline carbon emissions over time for a country or group of countries 
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Integrated Planning Model (IPM) What It Is, Who Uses It, How It Works, What It Can Show You Presentation for For the Clean Air Act Advisory Committee Permits/New.
Pennsylvania Draft Regulations for the Control of Mercury From Coal-fired Electric Generating Units Allegheny Section- AWMA Air Quality Issues Workshop.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
ERTAC EGU Growth Code “Proof of Concept” USEPA Briefing Washington, DC December,
CLEAN ENERGY TO PROMOTE CLEAN AIR & IMPROVE ELECTRICITY PRICE STABILITY Alden Hathaway, ERT Debra Jacobson, GWU Law School April 6, 2006.
Status of ERTAC EGU Growth Committee September 16 th 2013.
2018 CO 2 Emission Projections for the SESARM States Prepared by: Byeong-Uk Kim, Jim Boylan, and Keith Bentley GA EPD – Air Protection Branch October 22,
1 EPA Plans/Projects Involving Projections Marc Houyoux, US EPA Presentation to the RPO National Workgroup November 4-6, 2004 St. Louis, Missouri.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Did the recession impact recent decreases in observed sulfate concentrations? Shao-Hang Chu, US EPA/OAQPS/AQAD October, 2011.
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
ERTAC EGU Growth Tool Stakeholder Rollout Lake Michigan Air Directors(LADCO) Rosemont, IL May 20 th,
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Preparation of Control Strategies October 18, 2007 NAAQS RIA Workshop Darryl Weatherhead, Kevin Culligan, Serpil Kayin, David Misenheimer, Larry Sorrels.
DORIS MCLEOD AIR QUALITY PLANNER VIRGINIA DEQ 804/ ERTAC Tool Logic and Flowcharts.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
OTR Results ERTAC EGU –RESULTS WEBINAR May 16,
ERTAC 1. P RESENTATION O VERVIEW 1. Process Overview and Timelines 2. Inputs 3. Algorithm Details 4. Results 5. Outstanding issues 2.
ERTAC Growth Approach - EGUs ERTAC-EGU Development Group - Webinar May 16, 2013 Robert Lopez, WI-DNR - Presenter.
1 ACT 61 INCREASED INVESTMENT AND SAVINGS SCENARIOS Summary Of Methods Used To Develop Inputs For Analysis of Cost-Effectiveness and Rate Impact John Plunkett.
Presented to Time of Day Subcommittee May 9, 2011 Time of Day Modeling in FSUTMS.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
1 OTC Regional Attainment Strategy Danny Wong OTC November 2005 Meeting Wilmington, DE.
Clean Air Interstate Rule (CAIR) CAIR Model Cap and Trade Rules: Unique Elements and Flexibilities Office of Air and Radiation March 2005.
1. Stationary and Area Sources Committee Recommendations OTC Annual Meeting 2010 Baltimore, MD 2.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Preparation of Control Strategies EGU Sector Clean Air Markets Division U.S. EPA Office of Air and Radiation 17 October 2007.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Integrated Energy-Environmental Modeling for Regional Scenario Analysis Timothy Johnson U.S. EPA Office of Research and Development Research Triangle Park,
Impact of Temporal Fluctuations in Power Plant Emissions on Air Quality Forecasts Prakash Doraiswamy 1, Christian Hogrefe 1,2, Eric Zalewsky 2, Winston.
NENG-Combined Cycle, New Unit Hierarchy, and Growth Rates.
EMISSIONS INVENTORY UPDATE Briefing for OTC Committees and Stakeholder Meeting September 13, 2012 Washington, DC Julie McDill & Susan Wierman 1.
Draft-Version #18 9/13/11 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
EGU Forecasting Tool (Data Elements) Office of Air Quality (800) John Welch Senior Environmental Manager IDEM.
October 26, 2005 ICF Consulting RGGI Electricity Sector Modeling Results RPS Sensitivity & Very High Emissions Reference and Package Cases.
OTC Control Strategy Committee Meeting Tad Aburn, Chair, Multi-P Workgroup October 5, 2005 The OTC Multipollutant Model Rule.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Presented by: Eastern Research Group, Inc. May 10, 2005 Status Report to the Stationary Sources Joint Forum: Task 2: Control Technology Analysis.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
 Ensure utilities plan for and provide services by which Missouri’s residents and businesses can achieve their goals with less energy over time, with.
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
LNBA Subgroup: Avoided Transmission Value
Overview of WRAP Emissions Projections
NSPS Rulemakings for Greenhouse Gas Emissions
Industrial Assessment Center Database
A Collaborative Process to Develop a 2016 Emissions Modeling Platform
EPA’s Power Sector Projections Use of 2016 Data
EPA Office of Air Quality Planning and Standards
ERTAC EGU Overview For the 2016 EGU workgroup
EGU Workgroup: 2016 beta Approach: Status: Next Steps / Milestones:
Patrick Cummins January 30, 2019.
Western Regional Haze Planning and
Presentation transcript:

ERTAC 1DRAFT - DO NOT DISTRIBUTE

Presentation Overview 1.Process Overview and Timelines 2.Inputs 3.Algorithm Details 4.Results 5.Outstanding issues 2DRAFT - DO NOT DISTRIBUTE

1. Process Overview and Timelines a.What is the ERTAC Growth Committee? b.Criteria for product c.Committee structure d.Progress & Timeline 3DRAFT - DO NOT DISTRIBUTE

What are we trying to accomplish ? Develop Methodology to Create EGU FY Emission Inventories that meets certain criteria: – Conservative predictions of unit activity – Relies primarily on state knowledge of unit retirement, fuel switching & controls – Can be re-run iteratively to look a variety of scenarios – Stable/stiff – Transparent – Inexpensive – Relies on base year activity data – Flexible 4DRAFT - DO NOT DISTRIBUTE

ERTAC EGU Growth Eastern Regional Technical Advisory Committee Collaboration: – NE, Mid-Atlantic, Southern, and Lake Michigan states – Multi-jurisdictional organizations – Industry [adds weight who in industry] How were they involved Realistic inputs and refine the logic, such as reserve capacity 5DRAFT - DO NOT DISTRIBUTE

Subcommittees and Co-Chairs ERTAC EGU Growth Committee Co-chairs: – Laura Mae Crowder, WV DEP – Bob Lopez, WI DE – Danny Wong, NJ DEP Four Subcommittees and Leads: – Implementation/Doris McLeod VA, Mark Janssen, LADCO: Create logic for software – Growth/Bob Lopez, WI & Laura Mae Crowder, WV: Regional specific growth rates for peak and off peak – Data Tracking/Wendy Jacobs, CT: Improve default data to reflect state specific information – Renewables & Conservation Programs/Danny Wong, NJ & Laura Boothe, NC: Characterize programs not already included in growth factors 6DRAFT - DO NOT DISTRIBUTE

State Involvement Regional lead identified per RPO to coordinate their state review of model and inputs State leaded identified in each state for QA of the input files These representatives will also review the output to provide guidance If Future Year (FY) emission goals are not met given known controls, states will indicate what strategy will be applied to meet the goal 7DRAFT - DO NOT DISTRIBUTE

Progress So Far.... Model Development: – Methodology created, documentation crafted – Preprocessor & projection running on Linux and Windows (GA, VA, MARAMA, IN, NJ, OTC) – Developing postprocessing software Estimating Growth in Generation: – Growth rates and regions defined – Created growth rate inputs for 2009 & DRAFT - DO NOT DISTRIBUTE

Progress So Far.... Input File Development: – Unit file and future controls file reviewed by states – Cap files are being converted to use CAIR caps – Further state input ongoing Results: – Ran through first iterations of the postprocessor – Distributed to member states for review Sensitivities: – Conducted scenarios with varied techniques for input values – Ran alternative growth rate sensitivities 9DRAFT - DO NOT DISTRIBUTE

ERTAC Timeline September - October, 2012 Initial “East of the Mississippi” test runs Goal: Demonstrate a “Proof of Concept” Review output, revise and rerun Present results to states for comment November, 2012 Goal: Determine areas of improvement Present to full ERTAC Committee Present model and “Proof of Concept” results to USEPA technical staff Spring 2013 Goal: Improve input and model Develop AEO 2012 growth factors which reflect new fuel mix paradigm Anticipated Future tasks Develop new base year 2011 DRAFT - DO NOT DISTRIBUTE10

Data Importation a.Inputs b.Preprocessing c.Growth Rates 11DRAFT - DO NOT DISTRIBUTE

ERTAC Inputs Starting Point: BY CAMD activity data – Gross load hourly data, unit fuel, unit type, location – Units categorized by: Fuel Type [Boiler Gas, Oil, Simple Cycle, Combined Cycle, Coal] Region [AEO regions (e.g. MACE, LILC, WUMS)] States review provides known new units, controls, retirements, fuel switches, etc EIA AEO growth factors NERC peak growth factors 12DRAFT - DO NOT DISTRIBUTE

Preprocessing Functions Data Edit Checks – Unit availability file – Controls file – Growth rates file – BY hourly CAMD data Removes non-EGUs Determines hourly temporal hierarchy – Based on regional hourly GL – Important for load distribution and growth rates 13DRAFT - DO NOT DISTRIBUTE

Preprocessing Functions Assigns hourly usage profile for FY to new units Assesses partial year reporting units Creates unit hierarchies for growth distribution For every hour, calculates “hourly load values” by region and fuel/unit type – Retired generation – New unit generation – Existing generation Calculates “non peak” growth rates 14DRAFT - DO NOT DISTRIBUTE

Growth Rates (GR) Hour specific growth rates allow program to adjust temporal profile of unit based on regional and fuel/unit type hourly growth profiles – Resulting FY profile might different from BY Provides ability to understand effects of peak episodic GR and control programs on air quality AEO Growth combined with NERC peak growth – Peak Growth – First 200 hour in hierarchy – Transition growth – hours in hierarchy – Non-peak growth – last remaining hours in hierarchy out to 8760 hours. Combined factor is further adjusted to account for: – Retirements & new units 15DRAFT - DO NOT DISTRIBUTE

The evolution of growth rates from annual to hourly Transition (hours in hierarchy) AEO2010 (by region/fuel) Nonpeak Growth (hours in hierarchy) NERC (by region/fuel) Peak Growth (hours in hierarchy) Final Hourly Growth Adjusted for retirements/new units each hour 16DRAFT - DO NOT DISTRIBUTE

Growth Rates Peak GR = 1.07 Annual GR = 0.95 Transition hours of 200 & 2,000 Non Peak GR = (calculated) 17DRAFT - DO NOT DISTRIBUTE

EIA's AEO Projection of Coal Consumption for Electricity Generation 18DRAFT - DO NOT DISTRIBUTE

EIA's AEO Projection of Gas Consumption for Electricity Generation 19DRAFT - DO NOT DISTRIBUTE

EIA's AEO Projection of Oil Consumption for Electricity Generation 20DRAFT - DO NOT DISTRIBUTE

21

3. Algorithm Details a.Regional modularity b.Adjusted FY Growth Rates c.Excess generation pool d.Generic units e.New Unit Utilization f.Spinning Reserve 22DRAFT - DO NOT DISTRIBUTE

Regional/Fuel Modularity Each ERTAC region analyzed independently Reserve analyzed on a regional basis Algorithm determines if capacity has been met for each hour for the region and fuel/unit type 23 Use new units For all ERTAC Regions For all Fuel/Type Bins Analyze capacity versus demand Assign generation Spinning Reserve DRAFT - DO NOT DISTRIBUTE

Current ERTAC Regions DRAFT - DO NOT DISTRIBUTE24

Adjusted Future Year Growth Rates (AFYGR), Hour Specific For every region and fuel/unit type, each hour has a variable value for: – Total FY Load (Hour Specific GR * BY Load=FY Gen) – Total Retired Generation (RetGen) – Total New Unit Generation (NU Gen) GR for each hour adjusted before application to existing unit hourly BY loads! AFYGR = (FY Generation – NU Gen) (BY Generation – RetGen) 25DRAFT - DO NOT DISTRIBUTE

Excess Generation Pool If unit growth exceeds capacity – Unit is limited to capacity – Demand beyond capacity added to the excess generation pool for that hour/region/ fuel/unit type bin The pool is distributed to other units in unit allocation hierarchy order – Units receive power up to optimal threshold or max capacity in two distribution loops – Power distribution ceases when pool is depleted or all units are at capacity (generic unit must be created to meet demand) 26DRAFT - DO NOT DISTRIBUTE

New Generic Units Added to meet demand Utilization determined on a fuel/unit type basis, similar to new state supplied units Receive unmet demand Size/location of generic units adjustable FY temporal profile assigned by region and fuel/unit type If a generic unit is added, the allocation hierarchy is recalculated and the loop begins at the first hour 27 First/next hour in the hierarchy Does capacity meet demand? Add generic unit Reallocate unit order Begin at first hour in the hierarchy Y N DRAFT - DO NOT DISTRIBUTE

New Unit Utilization New units receive generation from the excess generation pool – Annual power production limited by default or state input – Temporal profile based on similar unit (mimic) — program allows user to change the “mimic” unit New units (generic and state supplied) are high in utilization relative to other similar units because assumed to be: – Very efficient – Very clean Variables assigned to region and fuel/unit type characteristics are adjustable 28DRAFT - DO NOT DISTRIBUTE

Spinning Reserve check Following assignment of generation Check if reserve capacity is available for each hour in each region If in any hour there is not reserve capacity equal 100% of the capacity of the largest unit operating of any fuel type, a flag is raised 29 Determine reserve capacity needs for that hour Is unused capacity > reserve capacity ? Y N Alert: More capacity needed First/next hour DRAFT - DO NOT DISTRIBUTE

Results a.Output b.Examples c.Runtime 30DRAFT - DO NOT DISTRIBUTE

Output/Results Future year hourly activity – Heat input (mmbtu) – Gross load (MW) – SO2 emissions (lbs) – NOx emissions (lbs) File includes 8,760 hours for each: – Existing unit that is not retired – New state supplied unit – New generic unit created by the code Summary files Post-projection processing: graphs, more summaries, etc 31DRAFT - DO NOT DISTRIBUTE

Output from ERTAC EGU V1 Unit level Overall output 32DRAFT - DO NOT DISTRIBUTE

Example: Coal Fired Existing Unit, 800 MW Annual GR=1.018, Peak GR=1.056, Nonpeak GR=1.012 DRAFT - DO NOT DISTRIBUTE BYFY Mmbtu/hr Calendar Hours Variations in growth rate

Example: Coal Fired Existing Unit, 800 MW Annual GR=1.018, Peak GR=1.056, Nonpeak GR=1.012 DRAFT - DO NOT DISTRIBUTE Mmbtu/hr Calendar Hours Inefficient hour BY: 11,232 BTU/KW-hr FY: uses updated heat rate 50 hour depiction for an individual unit BYFY

Example: Coal Fired Existing Unit, 800 MW – SO2 Control Annual GR=1.018, Peak GR=1.056, Nonpeak GR=1.012 DRAFT - DO NOT DISTRIBUTE35 BYFY BY lbs/hr Calendar Hours FY lbs/hr

Example: Combined Cycle New Unit, 300 MW Annual GR= 0.904, Peak GR=1.2, Nonpeak GR=0.901 DRAFT - DO NOT DISTRIBUTE36 New units are supplied with temporal variability with grounding in base year meteorology

Example: Simple Cycle Existing Unit, 53 MW Annual GR=1.39, Peak GR=1.549, Nonpeak GR=1.377 DRAFT - DO NOT DISTRIBUTE37

Post-projection Processing Graphical Output – Page 1 Example 38DRAFT - DO NOT DISTRIBUTE

Post-projection Processing Graphical Output – Page 2 Example 39DRAFT - DO NOT DISTRIBUTE

Ver. 1 summary results – all regions DRAFT - DO NOT DISTRIBUTE40 Heat Input SO2 Emissions NO X Emissions Generation AEO2010 says growth in coal Controls plus clean new units Shutdowns w/ new clean units

In summary The model has been built Output has been generated Continuing effort to evaluate output and update inputs – Partial year reporters – Generic units – Unit hierarchies – Thing Two New growth factors based on AEO 2012 are needed Scenarios can be built to evaluate policy 41DRAFT - DO NOT DISTRIBUTE