1. Regulatory Compliance Drinking Water System water served to customers Compliance with Safe Drinking Water Act (Division of Drinking Water Permit) 2.

Slides:



Advertisements
Similar presentations
NDEQ Industrial Storm Water General Discharge Permit Presentation for: Nebraska Aviation Symposium January 27, 2011 By: Bill Imig, Environmental Scientist.
Advertisements

1. 2 Todays Meeting Purpose of proposed permit Purpose of proposed permit Share proposed permit language for your input Share proposed permit language.
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
What are TMDLs? and What Might They Mean to MS4 Permittees?
Metropolitan Council Environmental Services A Clean Water Agency Info Item: Waste Discharge Rules Presented to the Environment Committee September 14,
Presentation Texas Water: What You Should Know November 6, 2010.
Clean Water Act SAFE 210. History/Amendments Recent major amendments were enacted in 1972, 1977, and – Established the National Pollutant Discharge.
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
1. What is an NPDES Permit? An NPDES permit is an authorization to discharge There is no right to a permit and it can be revoked 5-year lifecycle Report.
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
What is NPDES? “National Pollutant Discharge Elimination System”
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Water Treatment Plant General Discharge Permit
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
County of San Bernardino Stormwater Program Municipal Activities Pollution Prevention Strategy (MAPPS) Volume II Inspection of Commercial/Industrial Businesses.
1. What is an NPDES Permit? An NPDES permit is an authorization to discharge (compliance with the Clean Water Act) There is no right to a permit and it.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
National Pollutant Discharge Elimination System(NPDES) Permit.
1. DWS NPDES Permit Enrollment   Who is required to enroll Water Purveyors that are Community Drinking Water Systems (CDWS) with 1000 connections or.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Human Waste Disposal  More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water.  Natural Processes.
Human Waste Disposal More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water. More than 500 pathogenic.
DRAFT PHASE II STORMWATER PERMIT New Requirements Terri Fashing - MCSTOPPP Manager Wendy Atkins – City of Sonoma Stormwater Coordinator With assistance.
Phase II National Storm Water Regulations What’s in it for you?
Wastewater Reuse Oregon State University GEO 300 November 3, 2004 Russell Harding Department of Environmental Quality Water Quality Division (503)
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
1. DWS NPDES Permit Enrollment   Who is required to enroll Water Purveyors that are Community Drinking Water Systems (CDWS) with 1000 connections or.
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
Stormwater Regulations and Impacts on Industry Integrated Regional Water Management Regional Advisory Committee (RAC) Meeting #45 Ed Othmer PE, CPESC,
An Overview of our Community’s Stormwater Management Program
Kentucky Growth Readiness for Water Quality Does your water quality matter?
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
ARE 309Ted Feitshans016-1 Unit 17 Point Source Control Federal Water Pollution Control Act (Clean Water Act of 1972)
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
Slide 1 California Implementation Water Board Policies.
1 How the Water Board Protects California’s Water Quality Kate Hart, Board Member Chair Central Valley Regional Water Quality Control Board.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Texas Commission on Environmental Quality
Integrated Watershed Management
CTC 450 Review Open Channel Flow (Manning’s Equation)
2017 Environmental Trade Fair Shannon Gibson
Wastewater Treatment.
Sacramento County Stormwater Quality Program
CTC 450 Review Open Channel Flow (Manning’s Equation)
John Tinger U.S. EPA Region IX
2018 Environmental Trade Fair Shannon Gibson
Sacramento County Stormwater Quality Program
USES OF DOMESTIC RECLAIMED WATER
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Presentation transcript:

1

Regulatory Compliance Drinking Water System water served to customers Compliance with Safe Drinking Water Act (Division of Drinking Water Permit) 2

What is this New Permit? Drinking Water System Discharges To Waters of U.S. Compliance with Clean Water Act National Pollutant Discharge Elimination System (NPDES) Permit (Division of Water Quality) 3

4 NPDES Program Framework Discharging  Pollutants  All “point sources”  Into “waters of the United States” Must obtain an NPDES permit from the U.S. Environmental Protection Agency or an approved state* *Authorized State program (California is an authorized state for NPDES permitting)

What is an NPDES Permit? An NPDES permit is an authorization to discharge There is no right to a permit and it can be revoked 5-year lifecycle Report of Waste Discharge or NOI is needed to apply Issued as an individual or general permit 5

NPDES Permit Policy – Our Tool Box California Toxics Rule 126 priority pollutants criteria California Ocean Plan Implementation Objectives California Thermal Plan State Implementation Policy for priority pollutants Implementation Basin Plans Beneficial uses Water quality objectives Implementation 6

NPDES Permit Nuts and Bolts Major Permit Requirements: Federal Standard Provisions Effluent Limits Technology Based Effluent Limits 40 CFR Water Quality Based Effluent Limits WQ Criteria/Objectives (Beneficial Uses) Self Monitoring Requirements Applicable Pretreatment, Sludge, and management requirements, and special studies. 7

How do beneficial uses relate to standards and limitations If MUN applicable: Protect it for drinking water standards (MCLs, CTR human health) If REC-1 applicable: Protect it for pathogens (total coliform standards, and CTR human health as well) If AGR applicable: Protect it for AG goals and Pathogens if direct consumption If COLD or WARM applicable: Protect it for toxic pollutants (CTR aquatic toxicity for metals and pesticides), chlorine and ammonia toxicity, dissolved oxygen, temperature, pH, etc. 8

Water Quality based effluent limitations are needed … …where there is a “reasonable potential” for the discharge to cause or contribute to an excursion above water quality standards. We have a three-trigger reasonable potential test. Effluent limitations could be for: Individual constituents Whole effluent toxicity Effluent limitations can result in … Increased monitoring & reporting costs $ Special studies (dilution, tox evaluation) $$ Penalties & liability $$ Additional controls or advanced treatment $$$ 9

DISCHARGER Supply Effluent Intake Criteria Ambient B C Concentration Carl Henriet - SWRCB 5 1.Limit if: Max Eff Conc ≥ Criteria 2.Limit if: Max B > Criteria and detected in effluent 3.Limit possible if: impaired, fish tissue, compliance problems, etc. Reasonable Potential Analysis 10

Basic Water Quality Concerns from Drinking Water System Discharges 11 Toxicity – chlorine, metals and ambient pH Solids - sediment, turbidity, sand and trash

Erosion, scour and hydro-modification 12 Basic Water Quality Concerns from Drinking Water System Discharges

Regulatory Exception to Priority Pollutants State Water Board grants water purveyors an exception to CTR and Ocean Plan objectives for priority pollutants To obtain regulatory exception: Water system must have regulatory coverage under an NPDES Permit Water system must have regulatory coverage under an NPDES Permit Water system must be identified in NPDES Permit to have the regulatory exception Water system must be identified in NPDES Permit to have the regulatory exception Exception does not apply to discharge of commingled storm water Exception does not apply to discharge of commingled storm water 13

DWS NPDES Permit Enrollment   Who is required to enroll Water Purveyors that are Community Drinking Water Systems (CDWS) with 1000 connections or more Wholesalers regardless of the number of connections   Who would not be required to enroll Community Drinking Water System with less than 1000 connections (optional). Transient, non-transient and non-community drinking water systems. CDWS that are also MS4 Permittees. CDWS that have an established MS4 local agreement and approved by their local Regional Board. CDWS whose discharges do not enter a water of the U.S. CDWS whose system-specific or water-body specific discharges require an individual Regional Board NPDES permit due to a TMDL or because the discharge falls outside the scope of the statewide permit. 14

DWS NPDES Permit Authorized Discharges   Type of Discharges Authorized (sample list)   Planned Groundwater supply well flushing or pump to waste Groundwater well development, rehabilitation and testing Transmission system installation Distribution system storage tank or reservoir releases Distribution system dewatering, flushing, pressure testing Fire hydrant flushing, meter testing, automated water quality analyzers operations. Water Treatment plant operations (excluding backwash filter that discharges to a water of the U.S.) Discharges due to activities undertaken to comply with mandates of the Federal Drinking Water Act and Ca Health and Safety Code   Emergency and Unplanned Drinking water system failures, including repairs on transmission or distributions system failures Trench dewatering due to a system failure or emergency failure Operation errors and discharges due to catastrophic events. 15

DWS NPDES Permit Effluent Requirements   Effluent Requirements/Limitations for discharges that enter a water of the U.S.   Establish Best Management Practices (BMPs) to: Prevent aquatic toxicity of chlorine by dechlorination Prevent erosion and hydromodification by erosion control and prevention measures Minimize Sediment discharge and turbidity impacts through sediment, turbidity, and erosion controls Prevent water quality impacts from groundwater supply well operations such as well development and rehabilitation by complying with a turbidity action level of 100 NTU or less in the discharge, and change or enhance BMPs when turbidity levels are greater than 100 NTU Applicable to all planned discharges that enter a water of the U.S.   Comply with the following effluent limitations: A total chlorine residual maximum of mg/L (inland waters, enclosed bays and estuaries) or mg/L (ocean) with compliance assessed by a field meter monitoring result of <0.1 mg/L (non-detect) for total chlorine Only applicable to superchlorinated discharges, direct discharges, or discharges within 300 ft from a water of the U.S. A turbidity limit of 225 NTU for Ocean discharges only. 16

Compliance Determination for Chlorine Limits Total Chlorine Compliance 17 ResultWould be Reported Compliance Determination Level In Compliance <0.10<0.1 Yes <0.1No <0.1No 0.06<0.1 Yes <0.06<0.1 Yes 0.05<0.1 Yes 0.04<0.1 Yes

DWS NPDES Permit Effluent Requirements Types of BMPs are left to the discretion of the CDWS (include but not limited to those established by AWWA) Emphasis on BMPs to be the primary control of toxicity, solids, trash, erosion, scour and hydromodification BMPs listed in Attachment C of the permit are examples 18

Permit Monitoring Requirements   Monitoring requirements.   Event effluent monitoring: (per event) Superchlorinated discharges (volume, chlorine, pH, and visual turbidity) High volume discharges (1ac-ft or larger) (volume, chlorine, visual turbidity) Well development /rehabilitation (volume, chlorine, and metered turbidity) If discharge <20 min then one sample during first 10 min If discharge between 20 to 60 min then one sample first 10 min and second sample during last 10 min. If discharge >60 min then one sample first 10 min, second within 50 min and last one within last 10 min of discharge or close to end of discharge as feasible.   Representative effluent monitoring: (annual- chlorine, volume, visual turbidity) All other types of discharges that represent same general water source, same water treatment, and same type of implemented BMPs. Same frequency as event monitoring dependent on duration of discharge. 19

Permit Monitoring Requirements, continued   Receiving water monitoring: Visual monitoring (erosion, discoloration, suspended matter, aquatic life impact, visible films, sheens, potential nuisance conditions) Only applicable when direct planned discharges do not comply with permit requirements. (not applicable for emergency discharges). 20

Emphasis on Beneficial Use or Reuse No monitoring is required if water is put to a beneficial reuse such as: Using the water that would otherwise be discharged for irrigation or other uses (e.g dust control) Putting the water that would otherwise be discharged to land disposal for ground water infiltration and recharge 21

Notification and Reporting Requirements   Notification of emergency or noncompliant discharges (upon becoming aware of impacts to beneficial uses) Notify Regional Board within 24 hrs and in writing within 5 days Notify Stormwater System Operator with 24 hrs.   Pre-Notification of large planned discharges >1acre-ft: Notify Regional Board and Stormwater System Operator 3 days prior to initiating discharge or retroactively within 24 hrs after the Discharger is informed to initiate a large volume discharge   Reporting to State Water Board by March 1 of every year: All non-compliant discharge monitoring information A record of the number of direct discharges that are >50,000 gal for the year An estimate of the total volume discharged to waters of the U.S. during the year. An estimate of the total volume of discharged water that was put to a beneficial reuse instead of discharging to a water of the U.S. 22

NPDES Permit Application Checklist   Notice of Intent form completed and signed   Application fee payable to the SWRCB included   Site information provided (map) Option of providing general location of the facilities or the boundaries of the service area(s) Need only to show the named receiving waters and the major named downstream waters For discharges within 300 feet of a water body, the Discharger is only expected to submit the representative distance of 300 feet on both sides of the named water bodies or indicate the entire service area is within 300 feet from a water body.   TMDL Waterbody information completed and submitted 2 samples’ laboratory analysis for parameters listed in Table F-2 for each applicable TMDL waterbody The estimated minimum and maximum discharge volume per discharge event and estimated average annual discharge volume going to the TMDL waterbody. Description of TMDL specific BMPs if any. 23

NOI Example Water Watch Website

NOI Example Sections 1, 2 25

NOI Example Sections 3, 4 26

NOI Example Section 5 27

NOI Example Section 6 28

NOI Example Section

NOI Example Section 8 30

NOI Example Certification/Signature 31

Mapping Requirements DWS Geographic Tool 32

Notice of Non-Applicability   Discharges from the drinking water system solely enter a water of the U.S. via a municipal separate storm sewer system (MS4) and there is a local agreement established with the MS4 Permittee and approved by the local Regional Water Board.   The drinking water system is owned or operated by the MS4 Permittee and all discharges enter a water of the U.S. via the permitted MS4 system.   The drinking water system is regulated under an existing individual Regional Water Board Permit due to threat to water quality above the low-threat scope of the statewide permit, or due to the need to address TMDL-specific requirements.   The drinking water system does not discharge to a water of the U.S. or a conveyance that drains to a water of the U.S. 33

Provides Clean Water Act regulatory coverage Provides Regulatory Exception to priority pollutants CTR and Ocean Plan objectives (not to Clean Water Act) Regulates through Best Management Practice Implementation Acknowledges MS4 NPDES storm water permits and discharges to land Acknowledges Small Water Systems (leaves it optional) Requires Community Drinking Water Systems to submit by September 1, 2015 an Application Package or a Notice of Non Applicability. 34 Summary

Questions? 35 Questions? (916)