Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.

Slides:



Advertisements
Similar presentations
Cochise, Maricopa, Mohave, Navajo, Pima, Pinal, Yavapai and Yuma Counties.
Advertisements

Soil Exploration Part II
OUTLINE Definitions Examples of Landfills in the Valley
Subterranean Success: Geothermal Energy Powering Schools
Volume of Prisms and Cylinders
Geotechnical-Geophysical Void Mapping and Foamed-Sand Backfilling of the Rapson Coal Mine, Colorado Springs, Colorado – Case Study Kanaan Hanna, Jim Pfeiffer.
CONSTRUCTION DRILLING INC.
By: Walter C. Brown and Daniel P. Dorfmueller
As one of the first steps in the retrofitting process, workers removed the existing concrete floor.
Joe is putting a low fence around all four sides of a rectangular flower bed. The flower bed is 4 feet wide and 6 feet long.   Each section of fencing.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.
Patea Freezing Works Asbestos Overview of Quantities and Locations February 2009.
Commercial / Residential Applications. Why Water? Most efficient 5,1 cm water pipe = 61 cm air duct Less space Higher mass and thermal conductivity Benefit.
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Presentation by Bert J Huls Prepared by Les MacPhie August 13, 2005
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
Section 1.3 Modeling with Linear Equations. 1.A problem will appear on the screen. 2.Use discussion in your group and paper to solve the problem. 3.You.
Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
Coal Mining By: Shane Viars Appalachian History Appalachian Course Project.
Sustainability in the Finger Lakes Geothermal at Hunt Country Vineyards.
Chapter 7 Dimensioning.
Ash Recovery At Kingston Fossil Plant Kingston, Tennessee
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Environmental Drilling By: Josh Humphreys October 8,2006.
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Click to continue…. Railroad Track wetland Image Date: December 2003.
Modeling Geologic Columns With Sand Art By Debra Rockey Wellsburg Middle School 1.Prepare the plastic tube. One end should be permanently sealed. If necessary,
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
Drilling Methods Rotary rigs –Most-used method for deep production wells –Uses a fluid (mud, water or forced air) to carry drill cuttings to surface Hollow-stem.
Taken from presentation by: Neal Babcock & Howard Alderson, P.E. Alderson Engineering, Inc. February 26, 2008.
Concrete
Mafia Not Happy !! Floating Concrete? Is Someone Swimming with Da Fishes?? Sir your Concrete Canoe Floats Full of Water??
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Retsof Salt Mine Collapse Mark Ferguson Manos Adoniadis.
Mix Design Review.
Methods for the Estimation of Mine Infiltration Bruce Leavitt PE PG, Consulting Hydrogeologist Washington, Pennsylvania.
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
TRENCHLESS TECHNOLOGY
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
The Full Use of FLUTe Liner Technology in Fractured Rock Boreholes BY CARL KELLER.
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
Pennsylvania Bureau of Deep Mine Safety Provide Mine safety inspections, Miner certifications Safety Training and Mine Rescue services for miners within.
UNIT: CONCRETE/MASONARY
Power Plant Construction and QA/QC Section 1.5– Hydroelectric Energy
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
TERRAMIN AUSTRALIA Limited
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Procedures and.
North Coast Wind Farm Tolano Environmental Consulting.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Engineering Presentation. Basic Soil Mechanics Soil type classification Gravel, sand, silt, clay Soil strength classification Granular soils (sand and.
Concrete Inspection Construction Inspection for Field Office Activities.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
Section Engineers Meeting March 6, 2014 Lexington, KY.
UNIT: CONCRETE/MASONARY Concrete Proportions Modified by Georgia Agricultural Education Curriculum Office July, 2002.
Warm Vessel Leveling Islands (Piers)
Soil Improvement.
TRENCHLESS TECHNOLOGY
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Pennsylvania Bureau of Deep Mine Safety
Small Radio Controlled Dredge
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
Large Air Systems – Sales Training
Presentation transcript:

Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete Pumping Co., Inc. Lynn Crayne Frank Howard III Lynn Crayne Frank Howard III

Acknowledgments Jeff Fields, Senior Engineer Jim Sublett, Senior Sourcing Specialist GAI Consultants, Project Designer Bob Turka, Senior Project Manager

Mining History at the White River Mine Mined in the 1920s and 1930s using the room and pillar method –No evidence of retreat or split pillar mining –Mine was flooded To this day –The pillars are mostly in place –Sinkholes onsite indicate shallow cover and mine subsidence

The Existing Edwardsport Plant A 160-megawatt coal combustion plant The original unit was built in 1918 but is no longer operational Three other operating units were built between 1944 and 1951 It currently operates at a fraction of its capacity Jack Stultz, General Manager of Duke Energy Indiana, will be able to update you to the benefits of the new proposed facility.

Construction Overview Construction includes grouting beneath nearly ±30 acres of the proposed IGCC facility Drilling into the abandoned deep mine using both track-mounted and tire-mounted drill rigs Grout is to be manufactured onsite by two volumetric mixing plant –From the point of manufacture, grout is pumped by a Schwing BPL 4000 pump via 4-inch steel slick line to second pump at the point of placement –The second pump has a 39-meter placing boom with an attached tremie pipe for ease of placement

Construction Overview (Continued) All materials for the grout are delivered and stored onsite, including cement, sand, and fly ash –Fly ash to be mined from the existing fly ash pond onsite –Cement from local plant Water for the grout manufacture is obtained from the mine pool –An observation well is used to monitor the mine pool height and water pH –If the mine pool rises one foot, a pump installed into the mine is used to remove mine water to retention pond Estimated completion date is February 2008

Drilling Specifics The construction includes nearly 2,500 boreholes –Holes are approximately 6-inch in diameter –On average, they are 45 to 50-feet deep –Thats over 115,000 linear feet of drilling Holes are cased to the top of rock using plastic (PVC SDR 35) casing –Casing is 6 inches in diameter and is manufactured in 10 feet sections –Casing is installed to an average depth of 20 feet

Drilling Specifics (Continued) Holes are plotted on a grid with 25-feet spacing Approximately 220 holes are drilled on angle –Angles of inclination vary from 22º to 45º –Angles are necessary because of site access issues due to existing 345 kV power lines

Angle Drilling Beneath Power Lines Leave a blank slide for the insertion of a typical boring log to be inserted by us

Grouting Specifics There are two types of grout to be used: Barrier Grout – to be used on the perimeter of the mine limits –Consists of Type I cement, sand, Type F fly ash, and water –Has an 8-inch slump Production Grout – to be used on the interior –Consists of Type I cement, Type F fly ash, and water –Has a 60-second flow

Grouting Specifics (Continued) All grout has a design strength of 200 psi at 28 days –Actual design strengths are averaging 450 psi at 28 days using cubes for compressive testing with an onsite lab Total grout quantity estimated for the projects completion is 180,000 cubic yards –Average production is 2,000 cubic yards per day Fly ash for the grout manufacture is mined and dried from the existing fly ash pond –Increased pond storage is a secondary benefit for Duke Energy

Volumetric Batch Plant

Key Points The existence of abandoned deep mines creates surface subsidence problems which complicate development in many regions of the country As development locations become limited, mine stabilization construction is becoming more common Mine stabilization construction can effectively allow development on abandoned mine land –Even for very high-value structures

Thanks to The Indiana Society of Mining and Reclamation Special Thanks to: Colleen Baughman Ron McAhron

Questions?