Indiana NPDES DMR Data:

Slides:



Advertisements
Similar presentations
How to complete a Paper Application Y0040_GHA0AV6HH_12 CMS Approved
Advertisements

Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
CREATE & SUBMIT eEEMPR USING DEP ONLINE PORTAL
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Division of Mining and Reclamation Kenneth Politan (304) , ext
Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Completing Form I-9 Overview. What will be covered I-9 Basics newI9.com! – Online Access Section 1 – Employee.
Procurement Card Presented By: Denise Matias, CAH March 20, 2013.
1 To enable you to view this presentation at your own pace, we created it for manual viewing: To advance these slides, click your mouse or use the forward.
What is NAP? NAP is a program of the State of Indiana in which tax credits are distributed to eligible non profits for sale as a fundraising and capacity.
The Office Copier (MFP) Paper Billing Process. Paper Billing Introduction Paper for the Office Copiers is provided free of charge, as long as it is used.
Radiation Safety Training Radioactive Waste Washington State University Radiation Safety Office.
Research Performance Progress Report (RPPR) Grantees may access a list of progress reports that are due using the Status page in eRA Commons, and selecting.
Introduction to the Wastewater Program’s Electronic Submission of Discharge Monitoring Report (eDMR) Enhancements Wastewater Compliance Evaluation Section.
NetDMR Electronic DMR Reporting
ARPANSA Licence Holder Forum AFP College, Canberra 17 September 2010 Compliance Issues Common Non-Compliances Alex Kalaiziovski Senior Regulatory.
1 BRState Software Demonstration. 2 After you click on the LDEQ link to download the BRState Software you will get this message.
Regulatory Review Presented by: Joe Munson. Outline  New Employee/Office  Lead and Copper Reminder  Stage 2 Disinfection Byproduct Rule.
Welcome Core 40 & Honors Internet Update System CHIPS
Indiana Department of Environmental Management
Louisiana Department of Environmental Quality
MERCURY REQUEST FOR EFFLUENT DATA. MERCURY - BACKGROUND STATEWIDE CAMPAIGN TO ELIMINATE THE USE AND RELEASE OF HUMAN- CAUSED MERCURY IN WASHINGTON STATE.
DMVA Monthly Time Sheets Hit “Enter” or click your mouse to advance to the next screen.
Water Quality Control Division
NetDMR Training for KYG4E and KYG4W
56TH ANNUAL WATER AND WASTEWATER OPERATORS' CONFERENCE April 17, 2013 NetDMR Update Shawn Hokanson SWPB Permit Support Supervisor Cheryl Edwards SWPB NetDMR.
DID YOU KNOW? – Cuyahoga River on Fire in Cleveland, Ohio – Raw wastewater spewed in the San Francisco Bay – City of Columbia Discharged Raw Wastewater.
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
What is it and what can it do for me?
California Integrated Water Quality System (CIWQS) and Electronic Self Monitoring Reports (eSMR) Presentation to California Dischargers.
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
NEIGHBORHOOD ASSISTANCE PROGRAM (NAP) Award Training
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
NetDMR Registration Walk-Through
NetDMR Training for NPDES Permittees
Louisiana Department of Environmental Quality
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
NetDMR Data Entry Walk-through
NetDMR Miscellaneous (Revise, Import, Print NetDMRs) Walk-Through NetDMR Test: NetDMR Live/Production:
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
TMK Top 5 Reasons Medicare Supplement Apps Pend TMK
NPDES Permit Application and Annual Fees NPDES Permits NPDES Permits are issued for the discharge of municipal, industrial, or commercial (non- storm.
Biosolids Annual Report A Step by Step Guide to Submittal.
Net DMR Catch the Wave to Electronic Reporting  NetDMR – Electronic Reporting is now Available for DMRs.
1 US EPA Straw Proposals for Modifying the 12/2005 draft Policy Statement Jim Hanlon, Director Office of Wastewater Management, OW Expanded Steering Committee.
1 Electronic DMRs: Key to Burden Reduction and Improved NPDES Program Management David Hindin, Director, Enforcement Targeting and Data Division Office.
City of Cedar Rapids Water Pollution Control. 56 million gallons day (86 mgd max) 240,000 lbs/day BOD (organic waste) 168,000 lbs/day TSS (solids) 19,000.
Question to Answer? What is eDMR Why eDMR? Who can use eDMR? What are advantages of eDMR? How does eDMR work? How can facilities sign up?
NetDMR Training Permittees and Data Providers Permit Compliance Unit Water Enforcement Division.
 Signed by EPA Administrator on September 24,  EPA anticipates the final rule will be published in the Federal Register in October  Final.
Attendance & Grading 1.Logging In & Navigating the Mail Menu 2.Viewing & Printing Your Attendance Roster 3.Creating TBA Schedules 4.Positive Attendance.
The Application Process In accordance with LAC 33:IX.2501.D.2 – All sugar mills with effective permits are required to submit a renewal application 180.
E2 Signatory Is the Preparer
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
How to complete a Paper Application
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
NetDMR.
Office of Student Life Human Resources:
Using the Oregon POLST Registry
Section 236 Program Year End Requirements Excess Income Reporting Annual Certification of Use (ACU) (for Retained Excess Income) Annual Certification.
A Step by Step Tutorial This PowerPoint presentation is intended to show eDMR users how to login and use the eDMR system.
2012 Business Guidelines for Association Membership
TCEQ Migration to EPA’s National NetDMR
Jessica Dare, Principal Consultant
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
Single Event Violations
NetDMR.
New Users Guide to NetDMR
Module 1b – ICIS Permitted Features
Presentation transcript:

Indiana NPDES DMR Data: NPDES Reporting Indiana Society of Mining and Reclamation Technology Transfer Seminar December 7, 2009 Indiana NPDES DMR Data: maintained for compliance tracking purposes for Indiana and EPA

IDEM Contact Information: IDEM Toll Free Number: 800-451-6027 Office of Water Quality, IDEM Ramona Malone, Receptionist: 317-232-8670 Office Fax Number: 317-232-8406 Spill Hotline: 888-233-7745

Data and Information Services Section: IDEM Contact Information (cont): Data and Information Services Section: (for DMRs and MMRs) Jeff Ewick, Section Chief: 317-233-0676 jewick@idem.in.gov Rose McDaniel: 317-233-2653 rmcdanie@idem.in.gov Helen Demmings: 317-232-8815 hdemming@idem.in.gov

DMR Definition DMR: Discharge Monitoring Report Form: a federal pre-printed Form (3320-1) Source: IDEM prints DMRs using data from a federal database and mails them out annually. The DMR is specific for that NPDES permitted facility. There is one DMR per outfall: summary data from MMR will be used to complete the DMR. The DMR must be submitted/postmarked by 28 days following its Monitoring Period end date.

MMR Definition MMR: Monthly Monitoring Report: a state form required by Indiana Source: http://www.in.gov/idem/5104.htm For Coal Mines choose the “Industrial Type” MMR. Can be used as an Excel Spreadsheet or printed as a copy that can be filled out by hand. One MMR per outfall: data results for each day of sampling will be used to complete it. MMR must be submitted w/corresponding DMR.

Goal: Report NPDES data Accurately, Completely, and on Time To fulfill reporting requirements of NPDES permit. To receive Compliant status (for DMR data) in EPA database. To prevent false Missing violations from accruing. To facilitate accurate data entry of NPDES sampling results. To demonstrate good stewardship of the use of the waters of the State of Indiana.

DMR violations in the EPA database There are 3 types of DMR data violations in the EPA database: Missing Exceedence Late Missing DMR data is currently the most common violation for Indiana coal mine NPDES permittees, in the EPA database.

12/05/08: 1,915 Missing Coal Mine DMRs for Indiana from 01/07 to 09/08 Start of List End of List

12/04/09: 601 Missing Coal Mine DMRs for Indiana from 01/07 to 09/08 End of List Start of List

12/04/09: 629 Missing Coal Mine DMRs for Indiana from 01/08 to 09/09 Start of List End of List

DMR and MMR Forms are Provided by IDEM IDEM prints and mails one years’ worth of DMRs per NPDES facility every July (using EPA database info). DMR forms have exact codes, parameters, monitoring period dates, and IDs on them so that their data can be entered into the EPA database to receive compliant status each monitoring period. MMRs can also be printed and mailed out, as requested, but are downloadable as Excel spreadsheets from the IDEM website.

Provide Correct Contact Address: To Receive DMR Forms In order to receive annual paper DMRs, each facility must give IDEM has their correct mailing address. Please notify IDEM whenever there is a change. Alternatively, facilities may receive their DMRs by email. Notify one of the Data Section Contacts with the email address of the appropriate contact person. Another way a facility can receive their DMRs is to use electronic submittal via the new eDMR system.

Part I: How to complete the DMR and MMR forms correctly: In order to have compliant DMR data in the EPA database.

Check the DMR and MMR for completeness prior to submittal For No Discharge monitoring periods - be sure the “No Discharge” box is marked. For monitoring periods with discharge - be sure that each DMR blank is filled in with the required measurement and use correct abbreviations if parameters have no measured data results. For all submitted DMRs: sign, date, and list the correct applicable telephone number.

Send the completed DMR/MMR to the correct IDEM address, on time DMR/MMR submittal should be postmarked by the 28th of the month following the DMR Monitoring Period End Date to: Indiana Dept. of Environmental Management Office of Water Quality Mail code: 65-42 DISS Data & Information Services Section 100 N Senate Ave Indianapolis, IN 46204

Supply both Average and Maximum Data, when required Report both average and maximum data, even for once-per-month or quarterly sampling frequencies. It is okay if the reported Average measurement is identical to the Maximum measurement. If more sampling occurred than required, all data for that parameter must be on MMR. And it should be reflected in the Average measurement on the DMR.

Example of DMR w/incomplete data

Example of DMR w/complete data

Report Flow in MGD Report flow as million gallons per day (MGD), not gallons. For example: 10,000 gallons should be reported as 0.01 million gallons. Do not report “0” flow on the DMR: either it is a “No Discharge” DMR or there was a flow measurement. If the dry weather flow was “0”: “0” should be listed on the MMR for that day of discharge checking.

Calculate Average Flow Correctly To average flow for dry and wet discharges: Use two flow samples representative for the month. Example 1: “0.000 MG” (dry) and 0.010 MG (wet) Monthly Average Daily Maximum 0.005 MGD 0.010 MGD Example 2: “0.010 MG” (dry) and 0.050 MG (wet) 0.030 MGD 0.050 MGD

Calculate Averages correctly for Other Parameters on dry/wet months Calculate averages (except pH) using measured data: Example 1: “No Discharge” (dry) and 40 mg/l (wet) TSS: Monthly Average Daily Maximum 40 mg/l 40 mg/l Example 2: 3 mg/l (dry, but discharge) and 1 mg/l(wet) Iron: Monthly Average Daily Maximum 2 mg/l 3 mg/l

Alkaline DMR (wet/dry samples)

Alkaline MMR (wet/dry samples)

Report Non-detect Data correctly Report less than the Limit of Detection (i.e.,“<0.005”) when reporting non-detect DMR measurements. The lab work (or testing equipment instructions) should indicate what the Detection Limit is. Do not report “0” or “ND” or “BD” or “BDL”. Be sure to use “<” symbol if “less than” is meant. Less than (<) can only be used on the DMR in combination with the actual Detection limit.

Report Conditional Data Correctly Use “Exempt” or “N/A” (“not applicable”) to report excused missing data, per parameter. This should only be used for the exempt condition parameters when reporting alternative sampling. Note: Exempt data that is truly exempt (as per the Rule) does not create missing data violations in the EPA database. Exempt data will be processed as compliant, as long as the reason for the missing data is clearly explained on the DMR.

Complete No. of Exceedences, Frequency, and Sample Type Correctly Complete the remaining three columns on the DMR form. When the reported measurement on the DMR exceeds the permit limit, report the number of times the limit was exceeded that reporting period in the “No. Ex.” column.

Report Other Missing Data Correctly Use “*” (asterisk) on the DMR blank if sampling did not occur (but it should have) for a parameter. Explain what the “*” (asterisk) means at the bottom of the DMR page. Based on the explanation, IDEM Data Stewards can give the missing data a process code that will at least make the data appear more complete in the EPA database, although it may still generate some kind of missing data violation.

Report No Discharge correctly Mark the No Discharge Box when submitting DMRs for outfalls that did not have a discharge for that monitoring period. Do not ask IDEM (Permit Writers or Data Stewards) to temporarily “delete”, “inactivate”, or otherwise terminate an outfall as an alternative to reporting no discharge. Outfall inactivation should be permanent. “Re-activating” an inactive outfall in the federal database can cause false violations to occur.

No Discharge DMR

No Discharge MMR

Report Alternative Parameters -1 Under specific precipitation conditions, the permittee may adjust reporting as follows: If precipitation <= 10 year, 24 hr storm event flow: Report Flow, Settleable Solids, pH, Precipitation (inches/month) and Duration (days/month). For all other parameters, report “N/A” or “Exempt”.

Report Alternative Parameters - 2 If precipitation > 10 year, 24 hr storm event flow: Report Flow and pH, Precipitation (inches per month) and Duration (days per month). For all other parameters, report “N/A” or “Exempt”. Precipitation and Duration shall be reported on both the DMR and MMR.

Alkaline Mine drainage status

Alkaline MMR

NPDES Permits w/no point discharge NPDES permittees that have no designated outfall point but still have the possibility of discharging will receive a “000 A” outfall in the EPA database. They will need to submit DMRs for this outfall, which should usually be “No Discharge”. The parameters on the DMR will be the same as the Reclamation Outfall parameters (quarterly).

Reclamation Mine drainage status

Reclamation MMR

Part II. Permit Changes that require written notification to the Permit Section In order to have changes/corrections officially made to the permit and reflected in the EPA database.

Changes to Ownership, Facility Name, or Signatory Authority Submit these changes to the Permit Section as soon as possible, using the correct notification form. An ownership change requires a formal modification. Be sure the notification form is filled out completely. It may take 2-4 weeks for changes to be completed in EPA database. New DMRs can be sent to the facility after that time.

Updating the Facility Location Address Federal and State databases now require more complete locational information for facilities. When applying for permit renewals (or even new permits) each facility needs to supply both: a specific street address or the nearest crossroads to the NPDES permitted facility, and latitude/longitude (“lat-long”) coordinates.

Changes to the Permit Coverage Area: Permitted area should be contiguous The facility location lat-long should generally indicate the center of the facility. Thus, each NPDES facility needs to be one contiguous site, not multiple noncontiguous mines. During NPDES permit renewals, permits with noncontiguous pits/mines may be split such that each noncontiguous pit/mine will have its own NPDES permit (and improved locational information).

Changes to Outfall status Activity status types: Active, Inactive, Proposed. Drainage status types: Undetermined, Alkaline, Acid, Reclamation. Changes to either status type should be sent to the Permit Writer on the notification form, in order to have the change made in the EPA database and on the corresponding DMR.

Report Influent for Undetermined Outfalls Report the required pH and iron influent monitoring for Undetermined outfalls for at least 6 months. After 6 months of data, permittee can apply to permit writer to remove the influent monitoring. Permit writer will notify permittee and Data Steward if influent monitoring can be removed. Permittee must continue to report influent monitoring until notified by permit writer, in order to prevent missing data violations in EPA database.

Undetermined Mine DMR

Undetermined Mine MMR

Report metals for Acid Outfalls Report the required metal monitoring for Acid outfalls for at least 12 months. After 12 months of metals data, permittee can apply to permit writer to remove the parameters. Permit writer will notify permittee and Data Steward if metal monitoring can be removed. Permittee must continue to report metal monitoring until permit writer notifies permittee otherwise, in order to prevent false missing data violations.

Acid Mine DMR (page 1)

Acid Mine DMR (page 2)

Acid Mine MMR

Adding an Outfall to Existing Permit Notify the permit writer whenever a new discharge point is added to an NPDES permitted area. Each new outfall, per permit, must have a new outfall ID that has never been used with that permit. Each new outfall must also have a unique and permanent lat-long assigned, and a start date. Do not re-use an outfall ID in a new location, per permit – it will compromise historical data.

Adding Proposed Outfalls If a new permit only has proposed outfalls, the first outfall listed (or designated) will be activated in the EPA database such that DMRs for that outfall must be submitted as per effective date of the permit. Notify the Permit writer as soon as each proposed outfall is built, with a “start date” for that outfall. DMRs for each active outfall must be submitted from then on, even if there is no discharge.

Inactivating an Outfall: Permanent Notify DNR inspector so that he can confirm closure. Notify IDEM Permit Writer, clearly indicating which outfall is permanently closed and the date of closure. The Permit Writer will notify Data Stewards so that DMR reporting requirements can be removed from EPA database for that outfall, to prevent false noncompliance (due to DMR non-submittals).

Questions?

DMR with Violation

MMR w/Exemption Violation