19 Oct 20061 NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.

Slides:



Advertisements
Similar presentations
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
Advertisements

9 Jan Irradiation Tests Module 3B Many tests, see last slide for overview Irradiate small area: 2x2 cm 2, with 2 mCu 90 Sr, 2 cm distance (~200.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
Outer Tracker Comments Aging Review Report: Ulrich Uwer University of Heidelberg LHCb Week May 27, 2004.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
Outer Tracker Comments Aging Review Report: Ulrich Uwer University of Heidelberg LHCb Week May 27, 2004.
Straw tube measurements Sebastian Bablok, Øystein Djuvsland, Per Thomas Hille.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Atsuhiko Ochi, Kobe University 18/03/2015 RD51 CERN.
Warm Up 1. Find the x- and y-intercepts of 2x – 5y = 20.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
13 Oct 2006Ageing Meeting Geneva, Niels & Gras1/15 NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry,
in non-hermetic 85/85 condition
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
9 Jan Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 TestModWireDateSourceCurrent/st raw DurationTests 90 Sr Scans I002A24L20-31.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Status report on studying and preventing ageing in the LHCb OT S.Bachmann (on behalf of the LHCb OT group) Physikalisches Institut Heidelberg Many thanks.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 Status of module production in Warsaw (1) Module number Panel A number Panel B number # of exchanged wires A/B # of shorts A/B Gas test (Δp/1min) Production.
31 May 2006Update ageing measurements at NIKHEF - LHCb week - Niels Tuning 1/37 Update ageing measurements at NIKHEF 31 May 2006 Niels Tuning, Gras van.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Using Intercepts Unit 3 Module 10 Lesson 3 Holt Algebra 1
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22 Aug Ageing studies: the Miracle HV training.
1 Nov 2007IEEE NSS (N48-3) - Ageing in the LHCb Outer Tracker - N. Tuning1/16 Ageing Phenomena in the LHCb Outer Tracker 1 November 2007 IEEE2007 Niels.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
19/5/2004LHC-b OTR PRR1 Schedule and Resources Jan Spelt.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
12 July 2006Update ageing measurements at NIKHEF - Ageing Workshop - Niels Tuning 1/25 Update ageing measurements at NIKHEF 12 July 2006 Niels Tuning,
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
The Performance of the Outer Tracker Detector at LHCb Barbara Storaci on behalf of the OT group 1.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Ladder Assembly All tools and jigs produced Glue dispensing works
Long irradiation at the side
Ageing workshop - N.Tuning
Average Monthly Temperature and Rainfall
STAR TOF MRPC Mass Production & Q.C. (USTC)
Vereinfachung der CBM TRD Elektronik
Test of the cleaning gas mixtures.
Pick Light Inspection Program
Presentation transcript:

19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect on ageing? 2)Flushing (Mod 2) Improves rapidly, but suddenly worse Q: why?? 3)HV training (Mod 3) Damage reappears after 200 hrs Q: 200hrs of irradiation, or time constant?

19 Oct ) Heating Mod 30 Setup

19 Oct ) Heating Mod 30 Temperature: 1 st heating 3 days Procedure 1)Module 30 is heated while flushing with CO 2 2)One day at 35C 3)3 days at 48 C 4)4 days at 48 C Logbook 22-29SepMeasure dimension, gas tightness 29Sep35C1 day 29Sep-2 Oct48C3 days 2-4 OctMeasure dimension, gas tightness 4 OctFlush 24 hrs, then irradiate 6-10 Oct48C>4 days 10 OctMeasure dimension, gas tightness 10 OctFlush 24 hrs, then irradiate Sep29 Oct 2

19 Oct ) Heating Mod 30 Temperature: 2 nd heating 4 days Procedure 1)Module 30 is heated while flushing with CO 2 2)One day at 35C 3)3 days at 48 C 4)4 days at 48 C Logbook 22-29SepMeasure dimension, gas tightness 29Sep35C1 day 29Sep-2 Oct48C3 days 2-4 OctMeasure dimension, gas tightness 4 OctFlush 24 hrs, then irradiate 6-10 Oct48C>4 days 10 OctMeasure dimension, gas tightness 10 OctFlush 24 hrs, then irradiate Oct 5 Oct 6

19 Oct ) Heating Mod 30 Geometry: Flatness Flatness: Module is flat to +/- 200 μm Change after heating <100 μm Before After Row III II I

19 Oct ) Heating Mod 30 Geometry: Length Length: Module shrinked by 1.03±0.10mm Module shrinked by additional 0.38±0.10mm  These shifts are easily seen by eye… DateabAverage (a+b)/2 Nominal: 2.46mm Delta 22Sep Sep Oct Oct Oct mm 8.0mm a b module table a+b/2

19 Oct ) Heating Mod 30 Geometry: Width Width: Module shrinked by 100 μm +/- 50 μm

19 Oct ) Heating Mod 30 Geometry: Shape Before After Consistency check of decreased width: ~ -100μm Shape: Straight within +/-100μm

19 Oct ) Heating Mod 30 Gas Tightness Before 1 st heating 2 nd heating DateLeakage Flow (l/s) 22Sep Sep Oct Oct Oct Oct Gas tightness: OK, Unchanged: l/s ± l/s Corresponding to 0.007mb/min

19 Oct ) Heating Mod 30 Ageing Sep 4, after 6 days of flushing Sep 19, after HV training Oct 4, after 3 days at 48 C Ageing: No sign of improvement after 3+4 days at 48 C! Module became very noisy?? Oct 11, after 3+4 days at 48 C Scan after Scan before

19 Oct Conclusions: Module 30 follows initial pattern from mod 2 What happened with module 2 ??  Briefly opened when moved from setup to setup  Gas had finished before worsening of module 2  Flushing is only temporary benificial !?   similar for heating?? 2) Long term flushing Module m 3 Compare to result from Heidelberg: 100 days M002 ?!? Heating of M030!?

19 Oct ) Long term flushing dips in Module 3? History:  21Mar – 12Apr:  28Mar-11Apr: opened module  15Apr – 23May:  25Apr-10May: played with water bottle  10May-15May: module not connected  23May – 19Jun:  6Jun: Change Ar bottle  6Jun – 19 Jun: Addition of O 2  19Jun-15Aug  20Jun-14Jul: module not connected ModDateLocI(nA)Time (hrs) 13B18Jancleanroom B23FebLab B21MarLab B12AprLab A15AprLab A23MayLab A19JunLab A15AugLab Mar: opened module during 14days 10May: opened module during 5days 6Jun: flushed with 4% O 2 for 13days 20Jun: opened module during 24days

19 Oct ) HV training Gas flow Conditions:  Flow: Ar/CO 2 70/30, 20 l/hr  Irradiation: 2mCu, 90 Sr source  Sequence: 1)HV training ~40 hrs 1870 and 1920V 2)Irradiate 340 hrs 3)HV training 18 hrs 1910 V Conclusions:  A second HV training helps again 340 hrs After HV Lower? 2 nd HV training1 st HV training NB: 700 hrs ~ s ~ 3 months nominal LHC hrs Rel.gain 3 rd HV training Lower??

19 Oct ) HV training Question: 1)Does it prevent ageing during 200 hrs of irradiation 2)Or does it prevent ageing for 200 hrs of flushing…  It looks like 1)  But untrained part improves!? 2 nd HV training1 st HV training3 rd HV training 8 days of flushing 3 days of flushing ?? Gain indeed went up Ratio 10Oct/3 Oct: 3Oct 29Sep -3Oct 10Oct

19 Oct ) HV training Question: Is ageing also prevented at previously unirradiated spots (pos. 190cm) ?  Marginally… This seems in contradiction with measurements of Aug 20 on unirradiated spot (pos. 200cm) 20hrs 96hrs Deepest point Integrated loss over surface

19 Oct ) Heating Mod 30: high currents cured? After heating: many channels with high current 1)Loose wire tension? (shorter module?) 2)Loose wire tension? (loose soldering?) 3)Deformation of straw? 4)Humidity in module? 5)Broken feedthrough board? After additional 3 days of flushing: high currents disappeared! Scan after heating: Scan after heating and additional 3 days of flushing:

19 Oct Development of Currents: ch1; the side

19 Oct Development of Currents: ch64; the side

19 Oct Development of Currents: ch33; irradiated

19 Oct Development of Currents: ch27; ?

19 Oct ) Heating Mod 30 Ageing Sep 4, after 6 days of flushing Sep 19, after HV training Oct 4, after 3 days at 48 C Ageing: No sign of improvement after 3+4 days at 48 C! Module became very noisy?? Oct 11, after 3+4 days at 48 C Oct 16, 7days heating +4days flushing

19 Oct Ageing after Heating+Flushing Ageing: No sign of improvement after 3+4 days at 48 C Some improvement after flushing, but is it more than expected?  Slope is nicely steep  But is there a factor 5? 3+4 days heating +4 days flushing 3+4 days heating (heated module)

19 Oct A closer look: compare (using deepest point definition) 3+4 days heating +4 days flushing 3+4 days heating Conclusion? 11 days heating +3 days flushing Heidelberg 17 days heating

19 Oct A closer look: compare using HD definition 3+4 days heating +4 days flushing 3+4 days heating HD: ~90hrs 55 Fe NI: ~20hrs 90 Sr Conclusion? Is there a steeper slope when we heat ? 11 days heating +3 days flushing Heidelberg 17 days heating

19 Oct Summary HD – NIKHEF data HD: ~90hrs 55 Fe Mod 20 and Mod 7 heated Mod 7: 186 hr irradiation! NI: ~20hrs 90 Sr Mod 20+7 have steeper slope?? NB: Mod 7 2x the irradiation Mod 7 Mod 20

19 Oct m Module: an oldy… What is the 3.2m module?  Construction date: 2001  Used in 2001 testbeam for TDR  Straws glued to panels with Araldite or Stycast?? 16 channels connected LHCb

19 Oct Irradiating 3.2m Mod 20 hrs hrs 23 hrs 118 hrs Gas flow Two irradiations, 2 mCu  44 hrs  118 hrs  very little damage 164 hrs

19 Oct Irradiation 3.2m Mod  very little damage  3.2m: 15% after 200hrs  Mod3: 35% after 200hrs Progressing in time Independent of definition Compare to F-mod 3: 3.2 m module (2001):