PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL.

Slides:



Advertisements
Similar presentations
Understanding Food Safety Management Systems
Advertisements

Configuration Management
ISO 9000 Quality Standards ISO 9000 describes quality assurance elements in generic terms that can be applied to any business. It treats an enterprise.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
EPSON STAMPING ISO REV 1 2/10/2000.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
Software Quality Assurance (SQA). Recap SQA goal, attributes and metrics SQA plan Formal Technical Review (FTR) Statistical SQA – Six Sigma – Identifying.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
Stepan Potiyenko ISS Sr.SW Developer.
Quality Management System
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
Chapter 9 - Quality Systems Team #2: Cindy Guthrie, Amy Randolph and Robin Tomer.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
First Article Inspection 9102 Carl ZimmermanSept,2013.
Rob Packard, President Slide 1 of 23 Bioburden Failure Analysis An E. coli strain being plated for identification.
Rob Packard, President Slide 1 of 30 Bioburden Failure Analysis An E. coli strain being plated for identification.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
How the ISO/TS Additions have moved from 1st to 2nd edition
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
1 © Mahindra Satyam 2009 Quality Management System Mahindra Satyam’s Quality Guide ISO Slides.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Important informations
Software Project Management Lecture # 11. Outline Quality Management (chapter 26 - Pressman)  What is quality?  Meaning of Quality in Various Context.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
WHAT IS DEFECT ? Price of Non-Conformance. WHAT DO YOU THINK ABOUT? 1.Missing the key input product 2.Getting the wrong information from buyer 3.Passing.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
QAQC for KM3NeT QAQC Group - 5th VideoMeeting Quality Plan...how to communicate about it? , QAQC group, 5 th videomeeting, Laurence CAILLAT 1.
TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
Inspection and Review The main objective of an Inspection or a Review is to detect defects. This activity and procedure was first formalized by Mike Fagan.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
Configuration Management
Quality Quality is “a characteristic or attribute of something.”
Quality Measurable characteristic Cyclomatic complexity Cohesion
QA Reviews Lecture # 6.
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL

PACS IBDR 27/28 Feb 2002 PA/QA Status2 PACS PA/QA TEAM Inst/Comp. RESPONSIBLE for PA/QA AntecMr. Richter CEAMme Loubere CSLMr.Thome +SW IACMr Herreros IFSIMr.Orfei +SW IMECMr.Putzeys KTMr.Zwick MPEMr.Igl MPIAMr.Hofferbert PRIPMr.Kropiunig SW only

PACS IBDR 27/28 Feb 2002 PA/QA Status3 PA/QA Documents PA- Plan SW-PA Plan CILDERAT WCA HSIACLEAN PLAN MANU FLOW Antec+N/A0000+ CEA+N/A0000+ CSL IAC IFSI IMEC+N/A+00++ KT+N/A000++ MPE+N/A+00++ MPIA+N/A0000+

PACS IBDR 27/28 Feb 2002 PA/QA Status4 FMECAPARTS E/M LI PROC LIST NCRRfWVERIF CONT CIDL Antec0++ CEA+++ CSL+++ IAC+++ IFSI0++ IMEC+++ KT0++ MPE MPIA0++

PACS IBDR 27/28 Feb 2002 PA/QA Status5 Open Critical Items as available yet IAC : No formal qualification for soldering (CRISA) Critical delivery schedule for PSC ASIC IMEC: Some minor critical items are listed: concern to process control -procurement, manufacturing, handling MPE: Unknown effects of cosmic ray hit rates cannot be taken into account while validation process of SPU HLSW.

PACS IBDR 27/28 Feb 2002 PA/QA Status6 QA : further activities Following issues must be intensified : Procurement included incoming inspection Manufacturing control and inspection included documentation, workmanship standards, process and material identification, KIP/MIP, metrology and calibration, cleanliness, storage, packaging and transportation Non-conformance management Software QA Failure prevention management

PACS IBDR 27/28 Feb 2002 PA/QA Status7 PA : further activities -Unification of PA/QA systems will be promoted -Documents will be harmonized as far as possible -Cooperation between PA operators will be encouraged -Training in PA/QA-methods will be initialized if necessary -Rework of FMECA as the basis of bottom-up tools like HSIA, CIL, FDIR