Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Saverio MINUTOLITOTEM T1 Readiness Review, 30 November Readiness Report on T1 Electrical Systems and Electronics.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Status of NA62 straw electronics Webs Covers Services Readout.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Saverio MINUTOLIElectronics WG - 09 June AFEC cross-talk Plots illustrating Cross-talk effect AFEC pcb investigation.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
University of Wisconsin
TOTEM Electronics Status
LKr status R. Fantechi.
The Totem trigger architecture The LONEG firmware archtecture
Production Firmware - status Components TOTFED - status
T1 status (a selection from EDR presentations)
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
same for both sectors 45 and 56
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Pierluigi Paolucci - I.N.F.N. Naples
The digital read-out for the CSC system of the TOTEM experiment at LHC
RPC HV&LV status Introduction HV power supply tender
Overview of T1 detector T1 is composed by 2 arms
New Calorimeter Trigger Receiver Card (U. Wisconsin)
The electronics system of the TOTEM T1 telescope
The digital read-out for the CSC system of the experiment TOTEM at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine Other development: 16chs preamplifier. Cabling and Power Supplies: T1 Trigger Architecture Optic cabling High Voltage Low Voltage Patch panels CERN Electronics Meeting 22 Nov. 2007

Saverio Minutoli INFN Genova 2 2 Electronics Cards

Saverio Minutoli INFN Genova 3 3 VFAT hybrid input ground isolation new feature. 5 pieces of 1P and 5G already produced. Waiting for the components loading. Mass production launched. PCBs ready within Dec Decision on passive components networks within Dec. 07 Components mounting within ½ Feb.08 End tests, validation and CSCs soldering March 08 AFEC

Saverio Minutoli INFN Genova 4 4 CFEC (1) First PCB almost tested. Results under evaluation New layout in progress. Ten PBCs ready 51 st w/07 PCBs mounted within 2 nd -3 rd w/08 Decision on passive components networks within Dec. 07 Mass production ready within ½ Feb.08 End tests and validation March 08.

Saverio Minutoli INFN Genova 5 5 CFEC (2)  Upgrade to high resolution.  New layout Jan. 08  Few prototypes ready March 08.  End tests and validation April 08.  Mass production ready June 08.

Saverio Minutoli INFN Genova 6 6 ROC (1) Some delays due to CERN custom components procurement. Needed to avoid wrong components packages association. Several features implemented: DOHM and CCUM emulation. DOHM I2C lines handling (follow the CCUM-SCR redundancy scheme). Trigger VFAT Mezzanine GOHs mezzanines input pattern generator. Several Data GOH DAV sources available. Several Trigger GOHs DAV sources (BC0, Static, Timed by CCUM) Foreseen a SPY Mezzanine based on T1 Digital Mezzanine. The layout is in progress. 5 PCB ready ½ Dec.07 3 Circuits mounted and tested ½ Jan.08 PCBs mass production ½ Feb. 08 Full ROCs ready within March 08.

Saverio Minutoli INFN Genova 7 7 ROC (2)

Saverio Minutoli INFN Genova 8 8 ROC (3) BC0b IDLEb/ON TR_GOH_DAV I/O CCUM MUX CSC1 A DATA_GOH_DAV I/O CCUM MUX I/O CCUM CSC2 A K K K TRIGGER DAV DATA DAV Has been tested ???

Saverio Minutoli INFN Genova 9 9 VFAT hybrids Hybrids production (PCBs and components mounting) at CERN. High density input connectors available from T1. Bonding may be made in Genoa. Needs agreement with the people in Genoa lab. Needs to know all the rules and material used by the CERN bonding lab. Needs some VFAT dummy chips in order to test all the procedures. Could be useful a training period at CERN of our bonding technician. Validation of the first hybrids in accord with the CERN people (W.S.- P.A.). The installation of 1 arm (30 CSCs) in March 08 involve 140 VFAT hybrids. This number is equivalent to the full T1 anode VFATS hybrids production including spares. In this installation 60 will be dedicates for the anodes and 80 for the cathodes (CFEC VFAT only based). VFAT hybrids schedule is CERN production dependent…

Saverio Minutoli INFN Genova 10 Saverio Minutoli INFN Genova 10 T1 Trigger Mezzanine T1 detector have 15 trigger fibers per each ¼ while each OptoRx mezzanine accept up to 12 fibers. In order to merge and manipulate with a dedicate algorithm all the trigger bits (30 fibers in total), we will need the custom TTM mezzanine to add to the Trigger TOT-FED. The trigger system is not completely fixed, need some more iterations within the trigger group. TTM not needed at the beginning (March 08). Expected to be available in June 08.

Saverio Minutoli INFN Genova 11 Saverio Minutoli INFN Genova channels preamplifier (1) This small boards use the same FE preamplifier device integrated inside the VFAT chip (see Jan Kaplon). Needed for final studies on T1 CSC detector. Layout in progress. Some PCBs ready and mounted 2 nd w/Dec.07 End tests and decision on the AFEC and CFEC passives networks components within Dec. 07

Saverio Minutoli INFN Genova 12 Saverio Minutoli INFN Genova channels preamplifier (2)

Saverio Minutoli INFN Genova 13 Saverio Minutoli INFN Genova 13 Cabling and Power Supplies

Saverio Minutoli INFN Genova 14 Saverio Minutoli INFN Genova 14 OLD Section

Saverio Minutoli INFN Genova 15 Saverio Minutoli INFN Genova 15 Platform to 6 th T1 Frame cable tray Who is responsible for this cables ?? (Putting in work and purchase) NEW Section

Saverio Minutoli INFN Genova 16 Saverio Minutoli INFN Genova 16 T1 Trigger Architecture ~6k wires CSC ROC T1 ARM 8 1 x ~6k wires CSC ROC T1 ARM 8 1 x2 2 x15 30 T1 TRG_TOTFED T1 TRG_TOTFED GLOBAL TRG_TOTFED 8bits XX COUNTING ROOM CAVERN Trigger Bits 2 x 480 = 960 x15 x2 (Needs TRG algo.) LV1 Y (16bits) VFAT (16bits) 8bits VFAT TTM

Saverio Minutoli INFN Genova 17 Saverio Minutoli INFN Genova 17

Saverio Minutoli INFN Genova 18 Saverio Minutoli INFN Genova 18 T1 Optic Architecture (OLD version)

Saverio Minutoli INFN Genova 19 Saverio Minutoli INFN Genova 19 Low Voltage and High Voltage components. Placed order at CERN for 5 WIENER fully equipped MARATON low voltages system. Two simple VME crates are also purchased for the MARATON remote control cards. Delivery expected within March Almost placed an order to CAEN for 6 HV modules A1550P, and one mainframe SY1527. Delivery expected March/April 2008.

Saverio Minutoli INFN Genova 20 Saverio Minutoli INFN Genova 20 Patch panels Hosted on the platform:  Low voltage  it could simplify the connections with the WIENER. (not needed at the beginning)  High Voltage  to be done, (not needed at the beginning) but ok for March 08. Connector procurement done. Hosted on the 6 th T1 Frame:  Low voltage  prototype almost ready, ok March 08.  High Voltage  all produced, one prototype almost ready, ok March 08.  Optic fiber  to be done, need a fiber cable fan-out and MPO connector for the dimensioning of the box (see W.S.).