CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Michael Hopkins, P.E., Assistant Chief, DAPC ,
AWMA Meeting October 15, 2013 Stack testing issues and questions Dennis Thielen.
Tribal Permit Training Fond du Lac Reservation June 11, 2013.
1 Permit Exemptions Rule Revisions North Carolina Division of Air Quality Permit Exemptions Rule Revisions North Carolina Division of Air Quality Stakeholder.
Pesticide Container-Containment Regulations: FIFRA 19(f)(2) Determinations of Adequacy.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Air Protection Branch 1. 2 Air Quality Activities Support the Mission of the Air Protection Branch Monitor and Report Air Quality Data Analysis and Planning.
Air Permitting Overview.
Compliance Update NCMA 2015.
Laura McKelvey OAQPS April 2014
New Source Review (NSR) Program Basics and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Laura McKelvey, Jessica Montañez,
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
Tribal Minor New Source Review Registrations Kaushal Gupta, Environmental Engineer, Air Permits Section USEPA Region 5 Air & Radiation Division Tribal.
Where to find Information About Facilities. Overview of Title V Permits.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Innovative Environmental Policy Air Permits David Neleigh Chief, Air Permits Section EPA Region 6 May 10, 2006.
EPA - New Source Review Proposed NSR Rules for Indian Country Genevieve Damico, EPA Region 5 Presentation drafted by: Raj Rao, Jessica Montanez, Wendy.
What is the purpose of the Class I Redesignation Guidance? Provides guidance for tribes who are considering redesignating their areas as Class I areas.
Air Permitting Update Yogesh Doshi ACE Academy New Jersey Department of Environmental Protection.
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
VI. Developing a VSMP Program General Stormwater Training Workshop.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Options for Tribes to Manage Air Quality in Indian Country Rich McAllister Hobbs, Straus, Dean & Walker Laura McKelvey EPA Office of Air Quality.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
June 26, Background of Federal GHG Regulation Supreme Court determines greenhouse gases (GHGs) are “air pollutants” under the Clean Air Act U.S.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
How to get Tribal Permitting Authority: Options and Procedures Nancy Mayer U.S. EPA OAQPS.
CAA Program Reporting Clarification Regarding Federally-Reportable Violations for Clean Air Act Stationary Sources (March 2010) (FRV Clarification Memo)
TRIBAL NEW SOURCE REVIEW IMPLEMENTATION NTF May 2012.
NSR and Title V Activities WESTAR Business Meeting May 2005.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
1 US EPA Straw Proposals for Modifying the 12/2005 draft Policy Statement Jim Hanlon, Director Office of Wastewater Management, OW Expanded Steering Committee.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
TAS and TIP Swinomish Tribe and the Incremental Approach.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
National Ambient Air Quality Standards (NAAQS)
New Source Review (NSR) Program Basics
Preparing for Permit Review
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Tribal Roles in Minor NSR by: Joy Wiecks, Fond du Lac Band
WESTAR Fall Meeting October 2, 2008
Overview of New Source Review (NSR)
Department of Environmental Quality
Department of Environmental Quality
How to get Tribal Permitting Authority
Budget and Planning Update
Navajo Nation Minor Source Regulations
Presentation transcript:

CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1

Major Topics 2  Review the basics of general permits (GPs) and permits by rule (PBR)  Pros and cons of these permits  How these permits fit into the Tribal NSR rule  Status report on EPA’s development of these permits  Review of an excerpt from a proposed PBR

Types of Minor Source Permits EPA Can Issue Under the Tribal NSR Rule 3  Source specific permit (including synthetic minor permit)  General permit  Permit by rule (to be added)

Basics on General Permits (GPs) and Permits by Rule (PBR)  Provide for protection of air quality while simplifying the permit process for similar minor sources  In the minor NSR context, these are preconstruction permits that cover pollution sources that have similar pieces of equipment and similar control requirements  Both contain a standard set of requirements that apply to specific equipment or activities 4

What Do GPs and PBR Have in Common?  Generally intended to cover smaller sources of emissions  Facility must obtain permit before construction and comply with terms when operating  They are optional; facility can choose to go through the regular minor NSR permitting process instead 5

What Do GPs and PBR Have in Common?  Development:  Standardized terms and conditions are developed for a category of sources or pollutant-emitting activity  Public notice and comment occurs before EPA finalizes the permit  A final GP or PBR is final agency action  Permit terms:  Emission limits/requirements for control equipment, monitoring, record keeping and reporting requirements, etc. 6

What Do GPs and PBR Have in Common?  Process for obtaining coverage:  Source applies for coverage under the “umbrella” of the pre-established GP or PBR  Application requires less information than for a source-specific permit  Source must submit a copy of its request for coverage to the Tribe when it submits the request to the reviewing authority 7

What Do GPs and PBR Have in Common? 8  Approval and notification:  Reviewing authority will issue an approval of the request for coverage if source qualifies  Reviewing authority will notify the public if it issues an approval of the request for coverage  Public can challenge whether sources qualifies for the GP or PBR, but may not challenge the terms and conditions of the permit

Comparison of GPs and PBR  General permits:  More complex operations  Permit applications from individual sources may require more source-specific information than application for PBR  Reviewing authority needs to conduct more involved review to evaluate whether individual source meets criteria in GP 9

Comparison of GPs and PBR  Permits by rule:  More standardized and easier to implement because they require less information from individual sources applying for a permit  Well suited for Sources that emit few criteria pollutants Less complex operations  Permit conditions governing source operation, monitoring and recordkeeping are pre-defined in the rule 10

Pros and Cons of GPs and PBR  Significantly reduce the time, expense and complexity related to the preparation and review of permit applications  Allow permit staff to devote more time to permits for facilities with more complex permit requirements  Permits can be issued relatively quickly saving facilities time and money  Provide a guaranteed control plan and maximum allowable emissions rate for sources that qualify  Public may be unaware of their review opportunities until the facility applies for coverage, which is too late to comment on the permit itself 11

Connection to Permit Application Deadlines in Tribal Minor NSR Rule  Minor sources that commence construction or any stationary source that undertakes a minor modification on or after must obtain a minor NSR preconstruction permit  EPA intends for sources to be able to seek coverage under a general permit once it is effective  Plan to clarify requirements under the Tribal NSR rule  Currently rule says that sources covered by a general permit must obtain a permit within 6 months of publication or , whichever is earlier 12

Tribal NSR Update: Bundle #1 (6 categories)  Categories  Gas dispensing facilities  Auto body and miscellaneous surface coating  Petroleum dry cleaners  Rock crushing facilities  Hot mix asphalt plants  Landfills  Proposal target date: Summer 2013  Final target date: Fall

Tribal NSR Update: Bundle #2 (6 categories)  Categories:  Boilers  Engines  Printing Operations (including degreasing/solvent cleaning)  Stone Quarrying and Processing  Concrete Batch Plant  Saw Mills  Proposal target date: Fall 2013  Final target date: February

Tribal NSR Update: Bundle #3 15  Category: Oil and gas operations and production  Target date proposal: TBD  Target date final: September 2014

Reconsideration of Policy on General Permits for Synthetic Minors  Current policy is not to allow the use of general permits to create synthetic minor sources  In Bundle #1 permit package, we plan to discuss and seek comment on reconsideration of policy on use of general permits to create synthetic minors 16

Public Involvement Process 17  To establish PBR, EPA will conduct a rulemaking (with opportunity for public comment and to request a hearing)  To establish GPs, EPA will conduct a rulemaking (with opportunity for public comment and to request a hearing) or will provide notice and 30-day comment period and opportunity to request a hearing

Excerpt from Ohio Proposed PBR 18  Identifies source category and criteria for applicability  Lists emission limitations, conditions for operation and requirements for record keeping and reporting  Facilities apply by sending notification form to Ohio EPA stating the source meets the PBR criteria and will operate according to the PBR conditions  To address public notice concerns, state lists PBR sources in data base

Summary 19  Two options for minor NSR permits in Indian country are:  Source specific permits (including synthetic minors)  General permits  Plan to create a third option: permits by rule  General permits and permits by rule:  Cover pollution sources that have similar pieces of equipment and similar control requirements  Have a simplified application and issuance process  Include a standardized set of requirements that apply to specific equipment or activities  Have public review of the permit when the rule or permit is drafted