By Suresh Gupta, Dean/IRICEN. INTRODUCTION Growth in GDP during 2005-06 expected to be 8.1% likely to increase further in coming years. Economic growth.

Slides:



Advertisements
Similar presentations
KEVIN B. PAGE VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION VIRGINIAS RAILROADS A STAKEHOLDER IN TRANSPORTATION DEVELOPMENT.
Advertisements

A substantial shift in Urban Transportation
DMITRY MACHERET First deputy Chairman of the Russian Railways Joint Scientific Council, Doctor of Economic Sciences, Professor 17 October 2012 Russia –
1 Rail, traffic, sleepers, and fasteners in Australia A/Prof Alex Remennikov School of Civil, Mining and Environmental Engineering University of Wollongong,
Improving track design to reduce life cycle costs А.J. Abdurashitov Branch Manager of OJSC VNIIZHT, Ph.D. VNIIZhT (OJSC “Russian Railway Transport Research.
Presentation on Coal Market in India th Annual Conference P N Shukla Director (Operations and Business Development) DFCCIL, New Delhi.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
Blue print for throughput enhancement on HDN B.V.L.Narayana SPTM/ RSC/ BRC.
Proposed introduction of 50MAX HPMV (Formerly known as Lower Bound HPMV) A joint freight initiative between the NZTA, Road Transport Forum, and RCA Forum.
7 May, 2015 Green corridors in Europe; a perspective from Holland Menno M. Menist, Managing director 17 March 2010, Malmö.
Opportunities for Public-Private Partnerships in Railways 20 th May 2006.
IR-UIC-GRFC-22/ DELHI DO NOT USE WITHOUT PERMISSION OF AUTHOR AND IR 1 INTRODUCTION OF HEAVY AXLE LOAD OPERATION ON INDIAN RAILWAYS PresentationBy.
HIGH SPEED OHE OF INDIAN RAILWAYS
Schedule of Dimensions And Track & Bridge Structure for Dedicated Freight Corridor adhpm.
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
Rolling Stock requirements
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
NORTHERN RAILWAY AN OVERVIEW 1. NORTHERN RAILWAY ROUTE MAP 2.
INTRODUCTION i)Increased transportation capacity due to growth in economy ii)Strategies adopted by IR to meet the demand iii)Need for 30 tones axle load.
UNIT III GEOMETRIC DESIGN OF TRACKS
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
Emerging Opportunities in Port Sector By A. K. Mohapatra Secretary, Department of Shipping, Ministry of Shipping, Road Transport &Highways.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
Track for High Speed Trains on IR Challenges Ahead –An Overview Onkar Singh CE/Co-ord/N.E.Railway.
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
Workshop on Infrastructures Sustainable Infrastructure for Efficient Mobility: the Key Challenges Luc Bourdeau ECTP Secretary General Industrial Technologies.
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
TeNeT Group1IRSTE Seminar Information and Communication Technology (ICT) and Indian Railways Ashok Jhunjhunwala, TeNeT group, IIT Madras
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
Carrying the Freight: The Trucking Industry Perspective 13 June 2007 Stuart St Clair Chief Executive Australian Trucking Association.
TEST TRACK FOR INDIAN RAILWAYS
Phas eInterventionMotivation Needed by Phase 1B 19 passing loops extended (4.4km) with OHTE & Signalling Loop 7 replaced by loop 7A to facilitate more.
INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING. Introduction of high speed corridors on IR– impact & challenges before us.
1 Prospective research of VNIIZhT in field of freight traffic Prof. А.Е. Semechkin GRFC2007, New Delhi, March 2007.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
DEDICATED FREIGHT CORRIDOR
Indonesia Railways in International Perspective HWTSK, Inc An Outsider’s Assessment.
A TURN AROUND STORY LEADING CHANGE ANDTRANSFORMATION INDIAN RAILWAYS Presentation for Japan-India PPP Seminar, New Delhi (organized by NCAER) 14 th February,
Earning Enhancing Schemes Sanjay Upreti PAM. Rolling Stock Assets Locomotives Diesel Electric Steam Total Wagons Coaches
CenterPoint Intermodal Center (CIC) Largest master-planned inland port in North America. Situated on ~6500 acres just 40 +/-miles southwest of downtown.
SEMINAR 21/01/2015 Railway infrastructure – key to achieve sustainable transport Track Access Charges for the Bulgarian Railways – Technical Assistance.
STANDARD MOVING & FIXED DIMENSIONS FOR DEDICATED FREIGHT CORRIDOR.
Indian Road Construction. ROAD TRANSPORT SCENARIO Economic Growth : 5 - 6% Road Transport Sector Demand Grows at 10 – 12% Need for Road & Transport Infrastructure.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
4/12/2015 SW QLD Rail. 2 Increase Rail use? Cost Below Rail Above Rail.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
CURRENT PLANS FOR EXISTING AND DEVELOPMENT OF NEW RAILWAYS IN UGANDA PRESENTED BY GRACE JAMES ITAZI DIRECTOR OF TRANSPORT MINISTRY OF WORKS AND TRANSPORT-
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Multi Modal Containerized transport through Western India – A Supply Chain Perspective Presented By: Kumar Abhishek Rahul Rathi Tusar Pal.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
Geometric Design of Railway Track
Contents  Port Side handling of containers  Issues  New Levels of service standards.  Increasing Terminal Capacities.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
CONTAINERS INDIA 2014 Challenges in transporting containers to Hinterland Sanjay Swarup GGM, CONCOR 20 th August 2014, Hotel Lalit, Mumbai.
Semi high speed train Appropriate Track Heavy axle load train
Today´s Challenges of the Rail Infrastructure Industry
Committee on Climate Change
Simulation of mixed traffic on a railway section
Indian Railway.
GHG Mitigation in Rail Sector
Vice President: Lin Zhonghong Economic & Planning Research Institute
Metro Railway How it began
RAILWAY BRIDGE TUNNELS
Quantifying the economic benefits of changing the Gauteng to Durban railway corridor from narrow to standard gauge Christian Demmerez de Charmoy Prof.
Life Cycle Costing.
Presentation transcript:

By Suresh Gupta, Dean/IRICEN

INTRODUCTION Growth in GDP during expected to be 8.1% likely to increase further in coming years. Economic growth is putting a challenge on the transport sector. The challenge should be grabbed as an opportunity. Additional transport needs are to be handled mainly by Railways & Roads. Railways being energy & land efficient should gear up to carry most of the additional traffic generated.

INTRODUCTION (Contd..) Record loading of 668 MT during (Growth of 11%). CC+8+2 was first step in the direction of running heavy axle load trains. Hon’ble MR has announced in Budget 2006 introduction of 25 tonnes Axle load trains on 2 non-passenger routes (Dallirajhara to Bhilai and Daitari to Banspani). At present, same track carries passenger and freight trains. Their separation will help both the passenger & freight operations. By increasing volume of traffic, unit cost of transportation can be brought down. Reduction in unit cost will help Indian Industry to compete globally.

Dedicated Freight Corridor (DFC) During budget discussion in April ‘05 Hon’ble MR informed Parliament about importance of double line dedicated freight corridors on Golden Quadrilaterals and its diagonals. Hon’ble PM had announced on 15 th Aug. ’05 that Dedicated Rail Freight Corridor would be developed. RITES carried out Feasible Study and Preliminary Engineering cum Traffic survey & submitted report in Dec. ’05. Hon’ble MR has proposed in Budget Speech ’06 to construct Dedicated Multimodal High Axle Load Freight Corridors with computerised control on Western and Eastern routes at an estimated cost of Rs.22,000 crores.

Seminars/Workshops held During last one year, three seminars/workshops were held. Seminar on “Dedicated Railway Freight Corridor” by ASSOCHAM held on 30 th June, 2005 at New Delhi. Workshop by Institution of Permanent Way Engineers (India) on “Dedicated Freight Corridors on Indian Railways” on 6 th July, 2005 at New Delhi. Seminar on “Resurgent India -Freight & Rolling Stock Requirements” by Institute of Rolling Stock Engineers on 12 th January 2006 at New Delhi.

Dedicated Freight Corridor– Eastern Corridor 1 st phase from Ludhiana to Sonnagar via Ambala, Saharanpur, Khurja and Allahabad. Length 1232 Kms., costs Rs.10,000 crores From Ludhiana to Khurja single line and from Khurja to Sonnagar double line. Corridor will be extended upto ports in West Bengal as per traffic needs. The primary feeder routes from Sonnagar to Durgapur via Gomoh, Sonnagar to Tatanagar via Garhwa Road and Barkakana to Bokaro via Chandrapura will be upgraded in order to carry heavier trains of coal and steel traffic.

Dedicated Freight Corridor– Western Corridor From Jawaharlal Nehru Port to Dadri via Vadodara, Ahmedabad, Palanpur, Jaipur, Rewari, Tuglakabad. Length Kms. Double Line. Costs Rs.12,000 crores. Two routes considered via Ratlam, Mathura & via Ahmedabad, Palanpur, Rewari. Route via Ahmedabad, Palanpur, Rewari selected as it will connect to Gujarat ports at Mundra, Kandla and Pipavav and offer more traffic. Feeder routes of the Western Corridor connecting ports of Gujarat will be upgraded. BOTH THE ROUTES WILL BE JOINED BY A LINK BETWEEN DADRI & KHURJA

Spoornet (South Africa) m long, tonnes pay load, - Train was successfully run in Aug. 05 China tonnes train tried USA - 39T = 35 tonnes axle load on 136RE or 68 kg rail Experience on Foreign Railways

Pilbara New, Australia New 310 km long line planned Gradient % against loaded direction, i.e. 1: % against empty direction, i.e. 1:200 4 Locos, 200 wagons, 126 tonnes pay load, 2600m long train 4 crossing loops, 1 Hr apart Axle load tonnes – initially to achieve work hardening of rail tonnes – finally International Practices

Pilbara New, Australia ( Contd..) Rail 136 RE, 68 kg/m, work hardened by 32 tonnes axle load in initial phase. PRC Sleeper, 65 cm c/c. Ballast Cushion 250mm to start with for 32 tonnes axle load and to be made 300 mm for 37.5 tonnes. Minimum curve radius 2000m (0.8 o ). Construction roads to be retained for access for maintenance. Turnouts - 1:20 on Main lines with Swing nose crossing - 1:12 on others with rail bound CMS crossings All points electrically driven with cab displays. International Practices

Difficulties in linkages to existing network Standards of construction Track structure Bridges Maintenance Issues concerning DFC

Longer loops are not available on existing network. Existing stations may be too congested for terminal development. Different SODs may be needed. Different signalling will be needed. DFC may have many new technologies but their implementations in the linkages may be difficult. Difficulties in linkages to existing network

Standard of Construction Gauge1676 mm Track Centres6.00 m Distance From Existing Track 8.00 m Length of Loop 712 m Maxm. Cant 100 mm Maxm. Cant Deficiency60 mm Loading Axle Load: 30 tonnes Traililing : 12 tonnes/m Ruling Gradient 1 in 200 Compensated Steepest Gradient in yards 1 in 1200 Max m Degree of curve 2.5 o

Track Structure Formation Width m Rails 68 Kg UIC/90 UTS/LWR; HH on curves Sleeper New Design PSC & Elastic Fastenings Main Line : 1818/km. Loop Line : 1660/km. Turnouts Switches : Thick Web Crossings : Explosive Hardened, Weldable, Moveable Nose Ballast Cushion 350 mm

Bridges to be designed and constructed with years service life in view Design to cater expected loads and type of rolling stock in future New bridges should require least maintenance Planning of Bridges should provide for - Long Welded Rail on Bridges - Easy inspection and monitoring of health - Economic and speedy construction - Safety, Reliability & Durability Bridges

Fully Mechanised Maintenance: Different Inspection & Maintenance schedule. Rail cum Road Vehicle for Inspection & Maintenance. In-built 4 hours daily maintenance allowance. State of the art communication facilities to maintenance staff also. Signalling system shall detect rail & weld failures. Maintenance

Freight Stock Design Parameters Axle Load 30 tonnes. Track Loading Density (TLD) 12 tonnes/m. Higher Pay-to-Tare Ratio. Liberalised Maximum Moving Dimensions (MMD) for increasing volumetric capacity of wagons. This will result in gross load of 7440 tonnes on IR standard loop length. Wheel Diameter 915 mm for 30 tonnes axle load, and lower coupler height of 936 mm (with A & B car concept).

Suggestions Axle Load - 25 tonnes to start with as wagon with higher axle load not available at present on IR. - Later higher axle loads may be considered upto 30 tonnes. - Eventually upto 40 tonnes axle load Subgrade and bridges may be designed keeping further axle loads. Speed - 75 kmph to start with but 100 kmph eventually.

Suggestions (Contd..) At present permissible bending stresses for 90 UTS rail is kg/mm 2 for LWR track which is 28% of the Ultimate Tensile Strength of rail steel. On many world railways, viz. Australian Railways, 40% of Ultimate Tensile Strength of rail steel is permitted for bending stresses. If we could permit bending stresses upto 33% Ultimate Tensile Strength, then even 60kg 90 UTS rail will be adequate for 30 tonnes axle load. We may put 68 kg 90 UTS rail when we go beyond 30 tonnes axle load.

Corridors should be fully fenced. Signals may be placed at distance of 10 kms. and later this distance may be reduced as per need Parallel service road for - Maintenance - Attending emergencies (if any) Heavy Haul centre be set up at IRICEN and multidisciplinary core group established so that foreign systems can be studied in greater detail and various parameters finalised. Suggestions (Contd..)

THANKS !