1 GIFS-TIGGE WG MEETING FEB 22-24 2010, GENEVA, SWITZERLAND Zoltan Toth (NOAA/OAR/ESRL/GSD, Boulder, CO) Acknowledgements: Richard Swinbank, Steven Albers,

Slides:



Advertisements
Similar presentations
SNPP VIIRS green vegetation fraction products and application in numerical weather prediction Zhangyan Jiang 1,2, Weizhong Zheng 3,4, Junchang Ju 1,2,
Advertisements

The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
“A LPB demonstration project” Celeste Saulo CIMA and Dept. of Atmos. and Ocean Sciences University of Buenos Aires Argentina Christopher Cunningham Center.
Statistical post-processing using reforecasts to improve medium- range renewable energy forecasts Tom Hamill and Jeff Whitaker NOAA Earth System Research.
Space and Time Multiscale Analysis System (STMAS)
CHOICES FOR HURRICANE REGIONAL ENSEMBLE FORECAST (HREF) SYSTEM Zoltan Toth and Isidora Jankov.
UNBIASED ESTIAMTION OF ANALYSIS AND FORECAST ERROR VARIANCES
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Testbeds and Projects with Ongoing Ensemble Research:  Hydrometeorology Testbed (HMT)  Hazardous Weather Testbed (HWT)  Hurricane Forecast Improvement.
Chapter 13 – Weather Analysis and Forecasting. The National Weather Service The National Weather Service (NWS) is responsible for forecasts several times.
PROBABILISTIC NUMERICAL GUIDANCE FOR HIGH IMPACT EVENTS (THORPEX) Goal: Provide highest quality, coordinated, and seamless probabilistic automated guidance.
Hongli Jiang, Yuanfu Xie, Steve Albers, Zoltan Toth
Performance of the MOGREPS Regional Ensemble
Ed Tollerud, Tara Jensen, Barb Brown ( also Yuejian Zhu, Zoltan Toth, Tony Eckel, Curtis Alexander, Huiling Yuan,…) Module 6 Objective: Provide a portable,
1 COMPLETING THE FORECAST: ASSESSING AND COMMUNICATING FORECAST UNCERTAINTY Zoltan Toth Environmental Modeling Center NOAA/NWS/NCEP Acknowledgements: NRC.
Space and Time Multiscale Analysis System A sequential variational approach Yuanfu Xie, Steven Koch Steve Albers and Huiling Yuan Global Systems Division.
Fly - Fight - Win 16 th Weather Squadron Evan Kuchera Fine Scale Models and Ensemble 16WS/WXN Template: 28 Feb 06 Air Force Weather Ensembles.
Mathematics and Computer Science & Environmental Research Divisions ARGONNE NATIONAL LABORATORY Regional Climate Simulation Analysis & Vizualization John.
STEPS: An empirical treatment of forecast uncertainty Alan Seed BMRC Weather Forecasting Group.
Where the Research Meets the Road: Climate Science, Uncertainties, and Knowledge Gaps First National Expert and Stakeholder Workshop on Water Infrastructure.
A Comparison of the Northern American Regional Reanalysis (NARR) to an Ensemble of Analyses Including CFSR Wesley Ebisuzaki 1, Fedor Mesinger 2, Li Zhang.
Downscaling and its limitation on climate change impact assessments Sepo Hachigonta University of Cape Town South Africa “Building Food Security in the.
Assessment of the impacts of and adaptations to climate change in the plantation sector, with particular reference to coconut and tea, in Sri Lanka. AS-12.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
Space-Time Mesoscale Analysis System A sequential 3DVAR approach Yuanfu Xie, Steve Koch John McGinley and Steve Albers Global Systems Division Earth System.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
1 Agenda Topic: National Blend Presented By: Kathryn Gilbert (NWS/NCEP) Team Leads: Dave Myrick, David Ruth (NWS/OSTI/MDL), Dave Novak (NCEP/WPC), Jeff.
1 GIFS-TIGGE WG MEETING AUG. 31 – SEPT , GENEVA, SWITZERLAND Richard Swinbank & Zoltan Toth (UK Metoffice & NOAA/OAR/ESRL/GSD) Acknowledgements:
1 An overview of the use of reforecasts for improving probabilistic weather forecasts Tom Hamill NOAA / ESRL, Physical Sciences Div.
STMAS runs FAA: surface analysis, CONUS runs: MIT and backup; 5-minute ASOS runs: w-asos/n-asos (OSE); CWB: CWB surface reanalysis; CWB real time full.
Verification of Global Ensemble Forecasts Fanglin Yang Yuejian Zhu, Glenn White, John Derber Environmental Modeling Center National Centers for Environmental.
A Sequential Hybrid 4DVAR System Implemented Using a Multi-Grid Technique Yuanfu Xie 1, Steven E. Koch 1, and Steve Albers 1,2 1 NOAA Earth System Research.
LAPS / STMAS Verification Activities Steve Albers, Isidora Jankov ESRL / GSD Verification Summit September 2011 Updated Sep 7, 2011.
1 Results from Winter Storm Reconnaissance Program 2008 Yucheng SongIMSG/EMC/NCEP Zoltan TothEMC/NCEP/NWS Sharan MajumdarUniv. of Miami Mark ShirleyNCO/NCEP/NWS.
Refinement and Evaluation of Automated High-Resolution Ensemble-Based Hazard Detection Guidance Tools for Transition to NWS Operations Kick off JNTP project.
APPLICATION OF NUMERICAL MODELS IN THE FORECAST PROCESS - FROM NATIONAL CENTERS TO THE LOCAL WFO David W. Reynolds National Weather Service WFO San Francisco.
Lennart Bengtsson ESSC, Uni. Reading THORPEX Conference December 2004 Predictability and predictive skill of weather systems and atmospheric flow patterns.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
Post processing on NWP output and nowcasting on the grid for feeding the forecast system in Canada Donald Talbot Chief of Meteorological System Section,
Working group III report Post-processing. Members participating Arturo Quintanar, John Pace, John Gotway, Huiling Yuan, Paul Schultz, Evan Kuchera, Barb.
Statistical Post Processing - Using Reforecast to Improve GEFS Forecast Yuejian Zhu Hong Guan and Bo Cui ECM/NCEP/NWS Dec. 3 rd 2013 Acknowledgements:
1985 Hurricane Elenna taken from the Space Shuttle Hurricane/Typhoon Data Assimilation using Space-Time Multi-scale Analysis System (STMAS) Koch S., Y.
Edward Tollerud 1, Tara Jensen 2, John Halley Gotway 2, Huiling Yuan 1,3, Wally Clark 4, Ellen Sukovich 4, Paul Oldenburg 2, Randy Bullock 2, Gary Wick.
Fly - Fight - Win 2 d Weather Group Mr. Evan Kuchera HQ AFWA 2 WXG/WEA Template: 28 Feb 06 Approved for Public Release - Distribution Unlimited AFWA Ensemble.
Verification of ensemble precipitation forecasts using the TIGGE dataset Laurence J. Wilson Environment Canada Anna Ghelli ECMWF GIFS-TIGGE Meeting, Feb.
August 6, 2001Presented to MIT/LL The LAPS “hot start” Initializing mesoscale forecast models with active cloud and precipitation processes Paul Schultz.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
Fly - Fight - Win 2 d Weather Group Mr. Evan Kuchera HQ AFWA 2 WXG/WEA Template: 28 Feb 06 Approved for Public Release - Distribution Unlimited AFWA Ensemble.
Comparison of Convection-permitting and Convection-parameterizing Ensembles Adam J. Clark – NOAA/NSSL 18 August 2010 DTC Ensemble Testbed (DET) Workshop.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
DET Module 1 Ensemble Configuration Linda Wharton 1, Paula McCaslin 1, Tara Jensen 2 1 NOAA/GSD, Boulder, CO 2 NCAR/RAL, Boulder, CO 3/8/2016.
Probabilistic Forecasts Based on “Reforecasts” Tom Hamill and Jeff Whitaker and
NOAA Northeast Regional Climate Center Dr. Lee Tryhorn NOAA Climate Literacy Workshop April 2010 NOAA Northeast Regional Climate.
TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek, Manuel Fuentes (ECMWF)
Improving Numerical Weather Prediction Using Analog Ensemble Presentation by: Mehdi Shahriari Advisor: Guido Cervone.
STMAS/LAPS for Convective Weather Analysis and Short-range Forecast
Global Circulation Models
Verifying and interpreting ensemble products
Precipitation Products Statistical Techniques
5Developmental Testbed Center
Yuanfu Xie, Steve Albers, Hongli Jiang Paul Schultz and ZoltanToth
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
WMO NWP Wokshop: Blending Breakout
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Caio Coelho (Joint CBS/CCl IPET-OPSLS Co-chair) CPTEC/INPE, Brazil
SWFDP Key Issues for GIFS-TIGGE
Verification of Tropical Cyclone Forecasts
MOGREPS developments and TIGGE
Presentation transcript:

1 GIFS-TIGGE WG MEETING FEB , GENEVA, SWITZERLAND Zoltan Toth (NOAA/OAR/ESRL/GSD, Boulder, CO) Acknowledgements: Richard Swinbank, Steven Albers, Yuanfu Xie, Roman Krzysztofowicz, Louis Uccellini, Stephen Lord, Manuel Pondeca, Geoff Manikin, Andre Methot, Tom Hamill, Kathy Gilbert et al. Bo Cui, Yuejian Zhu, Paul Schultz, Mike Charles, Joo-Hyung Son, Dingchen Hou, Malaquias Pena, Huiling Yuan

GIFS QUESTIONS WHAT do we want to achieve? –Generate ensemble-based probabilistic forecast products for high impact events WHY do we need this? –Many user groups, especially in developing regions, have no access to such forecasts WHO will contribute? –Global & regional NWP centers, users in developing regions, research & development groups HOW can we proceed? –Identify pressing open science questions, promote related research –Identify IT needs Ensemble data access Shared development and use of algorithms / software Shared production of probabilistic forecasts On schedule and on demand distribution of products –Use best available algorithms WHERE to test first? HOW do we measure success? –New products made available to users in developing regions –Socio-economic value of newly introduced products assessed –Value added from improved algorithms assessed

HEPEX Hydrological Ensemble Prediction EXperiment –Somewhat informal collaborative experiment –Initiated and led by John Schaacke Series of Workshops –Last in Toulouse, June 2009 Diverse interests –Promote use of ensemble techniques in hydrological forecasts HEPEX community could become –Important user of TIGGE database –Collaborator in GIFS development Ways to explore linkages –Make HEPEX more focused and/or more formalized? –Identify HEPEX-related activities promising for collaboration with GIFS?

DEVELOPMENTAL TEST CENTER (DTC) ENSEMBLE TESTBED (DET) US interagency initiative To test readiness of promising ensemble methods for transitioning to operations Components –Ensemble configuration –Initial perturbations –Model related error representation –Statistical post-processing –Product generation –Verification Application areas include –Hydrometeorology Testbed (HMT) –Hazardous Weather Testbed (HWT) –Hurricane Forecast Improvement Program (HFIP) NCAR & NOAA contributions –NOAA OAR Global Systems Division (GSD) key player –Potential links with GIFS development

GIFS 101 Pull talents / methods together from –Global, regional, national centers / levels Build / share central depository –Toolbox for basic statistical post-processing / probabilistic products Configure infrastructure for –Collaborative generation of basic ensemble / probabilistic info Derive user relevant info from basic products –For each (SW)FDP for regional needs –For cities, temporal / spatial accumulations etc

PROBLEMS FOR GIFS PREDICTANDS Identify predictands –Strike probability for TCs (65 nm / 120 km) Based on cxml data – sequence of 6-hrly gridded output –10 m wind gridded probability distributions Simpson scale thresholds –Gridded precipitation amount probability distribution Define predictands –Create gridded fine resolution observational analyses Precipitation – Global, enhanced for selected regions Wind – Global, enhanced for selected regions Produce best possible basic products (next page)

QUALITY USER REQUIREMENTS Statistical resolution –Seek highest possible skill in ensemble of forecasts Need to extract and fuse all predictive information Statistical reliability –Need to make ensemble members statistically indistinguishable from nature

PROBLEMS FOR GIFS STATISTICAL POST-PROCESSING Lead-time dependent errors –Due to start of imperfect model from close to observed state –Bias correct forecasts using hind-cast sample Various sources of forecast information –Extract & combine forecast info from different sources Variables of interest not predicted –Models have coarse resolution, lack user relevant variables –Map coarse model variables onto fine resolution user relevant variables

ESTIMATED BIAS – 2m Temperature, 5-d forecast BEFORE AFTER BIAS CORRECTION Bo Cui

IMPACT OF BIAS CORRECTION ON ESTIMATED SYSTEAMTIC ERROR PROBABILISTIC SCORES NH 500hPa height 850hPa temperature Before bias correction (1x1 ) After bias correction (1x1) NH 2m temperature Before Bias Correction After Bias Correction NH 500hPa height Tropics 500hPa height Bo Cui

00hr GEFS Ensemble Mean & Bias Before/After Downscaling 10% 2m Temperature 10m U Wind Before After Before After

12 Accumulated Bias Before/After RTMA Downscaling Black- operational ensemble mean, 2% Pink- bias corrected ens. mean after downscaling, 5% Red- NAEFS bias corrected ensemble mean, 2% Blue-bias corrected ens. mean after downscaling, 2% Yellow-bias corrected ens. mean after downscaling, 10% black red blue

13 From Bias correction (NCEP, CMC) Dual-resolution (NCEP only) Down-scaling (NCEP, CMC) Combination of NCEP and CMC NAEFS final products NCEP/GEFS raw forecast 8+ days gain CONTINUOUS RANKED PROBABILITY SCORE RAW / BIAS CORR. & DOWNSCALED & HIRES MERGED / NAEFS High resolution control & Canadian ensemble adds significant value => 8-day total gain in skill

Global Analysis and Prediction System GLAPS Steve Albers, Isidora Jankov, John McGinley and Zoltan Toth Sfc Temperature, MSLP

Current GLAPS Status GLAPS is an implementation of the Local Analyses and Prediction System (LAPS) currently running over a global domain. As a GLAPS first guess the global FIM (with options for GFS and/or ECMWF) is being used. An operational version of GLAPS is running with a grid spacing of 21 km on a lat-lon grid projection. The analysis is being produced in real time on an hourly basis. The output is distributed via web interface and with Science On a Sphere. 500 mb HT, |v|

Data ingest as available globally

Justifications GLAPS can be used to … Demonstrate the inventory of all global data available from GSD/ITS. Provide a global view of fields of interest for weather and climate nowcasting. Verify global/climate models by providing analyses of common meteorological and geophysical fields. Initialize global models using both conventional and unconventional data sources (e.g. SST, ozone, algae blooming etc). Run OSSE experiments for: initialization, verification, and simulated observation generator.

Future efforts Improvement in runtime efficiency and corresponding decrease in grid spacing. Interface with global observational datasets as they become available at ESRL/GSD (e.g. satellite). Continue development on cylindrical equidistant (lat- lon) or icosahedral projection. Initialization (hot-start) of FIM, transition to holistic models. Green Fraction Climatology

STMAS surface analysis for FAA/MIT storm boundary detection Sequential variational approach –New multigrid technique Spatiotemporally consistent surface analysis –15 or 5 min frequency All surface data used –Including ASOS with 5 min frequency Full 4D version under development and testing Black/white image: Frontal derived from STMAS Blue/read curve: HPC frontal analysis.

White Green Yellow

TIGGE-LAM QUESTIONS / ISSUES Recognize fine resolution global ensemble is first choice –LAM ensemble used out of necessity – limited CPU resources Decide on focus for TIGGE-LAM / LAM ensemble efforts –Fine scale predictability (whether resolved with global or LAM models)? With increasing CPU, global models’ resolution improves –Use of one-way coupled regional models in ensemble forecasting? Distinguish between use of LAMs for –Forecasting – initial value dependence / sensitivity – fight against chaos Short lead time only (depending on domain size & level of chaos) –Dynamical downscaling – No sensitivity to initial conditions Use finer resolution model to interpret forecast made at lower resolution Compare two types of downscaling –Dynamical - use of LAM Very expensive Statistical resolution unchanged(?) Statistical corrections still needed –Statistical – based on a sample of data Limited by sample size Cheap

TIGGE-LAM QUESTIONS / ISSUES - 2 What is downscaling? –Find mapping between large and small scales Identify small scales consistent with large scale flow Some issues discussed in plan are NOT specific to LAM-EPS –Focus on TIGGE-LAM issues, work on other issues with GIFS-TIGGE WG? Regional forecast applications –As default, work in framework of GIFS FDP (if present in regions)? –Engage with HEPEX and other regional initiatives Standards for content and format of data important How to represent model related uncertainty? –“…use of multiple models [to capture model related forecast uncertainty] has proven empirically valuable, but is likely not the best long term solution and in fact may be slowing our efforts to find the best model”