RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Muon Front End Buncher, Phase Rotation, Cooling Schematics & CAD model based on MICE Cavities Alan Grant Daresbury (April 10, 2012)
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Module Connection and Support Arrangement Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting May 21, 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Progress on the Coupling Coil & Focus Coil Interface Engineering
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE RFCC Module Status: RF Cavities Derun Li A. DeMello, S. Virostek, M. Zisman Lawrence Berkeley National Laboratory NFMCC Collaboration Meeting The.
MICE RFCC Module and 201 MHz Cavity Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 15, 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Progress on the MICE RFCC Module Mike Zisman/Steve Virostek Lawrence Berkeley National Laboratory MuCool Test Area RF Workshop October 15, 2008.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
56 MHz SRF Cavity and Helium vessel Design
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
RFCC Module and RF Cavity Construction
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Overview of the RFCC Module and 201-MHz Cavity Design
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Presentation transcript:

RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 13, 2007

RF Cavity and Coupling Coil Module Design Update Page 2Steve Virostek - Lawrence Berkeley National Lab RF Cavity & Coupling Coil Modules in MICE RFCC Modules

RF Cavity and Coupling Coil Module Design Update Page 3Steve Virostek - Lawrence Berkeley National Lab Updated RFCC Module 3D CAD Model

RF Cavity and Coupling Coil Module Design Update Page 4Steve Virostek - Lawrence Berkeley National Lab Updated RFCC Module 3D CAD Model 201 MHz RF cavity Automatic tuners Cavity suspension

RF Cavity and Coupling Coil Module Design Update Page 5Steve Virostek - Lawrence Berkeley National Lab Cavity End View with Tuners and Struts Six tuners per cavity provide individual frequency adjustment Tuning automatically achieved through a feedback loop Six struts per cavity provide a kinematic mounting system Struts fix cavity position without over- constraint

RF Cavity and Coupling Coil Module Design Update Page 6Steve Virostek - Lawrence Berkeley National Lab Cavity Tuner Design Features Tuners are spaced evenly every 60 º around cavity Layout is offset by 15 º from vertical to avoid conflict with cavity ports Tuners touch cavity and apply loads only at the stiffener rings Tuners operate in “push” mode only (i.e. squeezing)

RF Cavity and Coupling Coil Module Design Update Page 7Steve Virostek - Lawrence Berkeley National Lab Four Cavity Layout in Vacuum Vessel Clocking of tuner position between adjacent cavities avoids interference Actuators offset from cavity center plane due to width of coupling coil Soft connection only (bellows) between tuner/actuators and vacuum vessel shell

RF Cavity and Coupling Coil Module Design Update Page 8Steve Virostek - Lawrence Berkeley National Lab Cavity Tuner Section View Ball contact only Dual bellows feedthrough Tuner actuator (likely air) Pivot point Fixed (bolted) connection

RF Cavity and Coupling Coil Module Design Update Page 9Steve Virostek - Lawrence Berkeley National Lab Tuner component Details Fixed arm Pivoting arm Actuator & bellows assembly Forces are transmitted to the stiffener ring by means of “push/pull” loads applied to the tuner lever arms by the actuator assembly

RF Cavity and Coupling Coil Module Design Update Page 10Steve Virostek - Lawrence Berkeley National Lab Cavity Tuning Parameters The following parameters are based on a finite element analysis of the cavity shell. Tuning range is limited by material yield stress. Overall cavity stiffness: 6120 N/mm Tuning sensitivity: +115 kHz/mm Tuning range: 0 to -460 kHz (0 to -4 mm) Number of tuners: 6 Maximum ring load/tuner: 4.1 kN Max actuator press. (  50 mm): 1.6 MPa (230 psi)

RF Cavity and Coupling Coil Module Design Update Page 11Steve Virostek - Lawrence Berkeley National Lab Cavity Suspension System Six strut system provides kinematic cavity support Orthogonal layout of struts allows accurate cavity alignment and positioning Kinematic mounts prevent high cavity stresses caused by thermal distortion and over- constraint

RF Cavity and Coupling Coil Module Design Update Page 12Steve Virostek - Lawrence Berkeley National Lab Cavity Suspension System 1 vertical strut 2 horizontal struts 3 axial struts

RF Cavity and Coupling Coil Module Design Update Page 13Steve Virostek - Lawrence Berkeley National Lab Strut End Connection Details One end of the struts is attached to a fixed lug welded to the ID of the vacuum vessel The cavity end of the vertical and one of the horizontal struts are attached directly to the stiffener ring The cavity end of the axial and one of the horizontal struts are attached to the fixed leg of a tuner

RF Cavity and Coupling Coil Module Design Update Page 14Steve Virostek - Lawrence Berkeley National Lab Four Cavity Layout in Vacuum Vessel Each cavity contains a dedicated set of suspension struts No contact between pairs of close packed cavities Struts designed to axially fix outside end of cavity pairs Tuning deflections increase cavity gap

RF Cavity and Coupling Coil Module Design Update Page 15Steve Virostek - Lawrence Berkeley National Lab Cavity Installation Sequence Pre-assemble cavities with Be windows and tuners (w/o actuators) Slide inner cavities into vacuum vessel using spacer/alignment blocks Shim cavity to align tuner & coupler vacuum feedthus with tuner mounts and cavity ports Install struts, tuner actuators and RF couplers Repeat same process for outer cavities