SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, SESAME STATUS TAC 2012 Synchrotron light Experimental Science Application Middle East.

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

Machine-Status Outline: Organization Financial aspects
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
SESAME SESAME RF SYSTEM Arash Kaftoosian.
SESAME SESAME = Synchrotron-light for Experimental Science and Applications in the Middle East 1 Bodrum, UPHUK-5, Sep..2013, Erhard Huttel.
Status of the SESAME Machine
TAC12 report back Outline:Organization CESSAMag Part A Building Injector Control TAC 2013 Reporting back E.Huttel 1.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
CESSAMag: magnets for SESAME Attilio Milanese CERN.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Computer Science and Instrumentation Research Opportunities at CLS Johannes M. Vogt Canadian Light Source University of Saskatchewan
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
M. Attal, 10 th Technical Advisory Committee Meeting, May 10-11, 2010, Allan, Jordan Synchrotron-light for Experimental Science and Applications in the.
Collaboration with Normal Conducting Magnet section
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Contents Overview of 150 MeV FFAG Accelerator
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PETRA III, A New High Brilliant Light Source At DESY
Magnets Attilio Milanese Doing Business with CERN
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
20. ESLS Workshop, HZB, Nov.2012 STATUS ANKA Outline:General Insertion NANO ………..CAT-ACT …………CLIC Control-System-upgrade Short bunches: EOS …………………Flute.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
O. Kester, NuSTAR annual meeting, 27/02/2013
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
MAX IV linac overview and scope of automation Sara Thorin.
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
Report Technical Director Storage-Ring-Installation Completed
SESAME Control System Status
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
ELENA installation and commissioning status
PLC-based control systems at SOLEIL - ICALEPCS 2017
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
SuperB Injection, RF stations, Vibration and Operations
Coupling Correction at the Australian Synchrotron
SESAME-On The Way To Become Real
ALIGNMENT STRATEGY OF SESAME T. Abu-Hanieh, SESAME, Jordan
Injector Performance Requirements Conventional Facilities Update
Operation Progress and Upgrade in SSRF
Advanced Research Electron Accelerator Laboratory
CLIC damping rings working plan towards the CDR
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
ThomX – Commissioning Meeting – 25/01/2018
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, SESAME STATUS TAC 2012 Synchrotron light Experimental Science Application Middle East

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, The means have become available to built up SESAME now! Israel, Iran, Jordan, Turkey committed to contribute 1.25 M$ next four years. Pakistan committed to comparable in kind contribution. CERN/EU contribute 5 M€ for the purchasing of the magnet system

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Financial Aspects till 2016 Income EU-CERN: 5.00 M€ Jordan: 5 x 1.25 M$ Turkey: 5 x 1.25 M$ Israel: 5 x 1.25 M$ Iran: 5 x 1.25 M$ ? Pakistan: in kind contribution? USA? Norwegian? Injector-upgrade0.9 M€ Magnets and PS:5.0 M€ Girder:0.8 M€ Vacuum:3.0 M€ RF:3.0 M€ Diagnostics:1.5 M€ SR-Cooling:0.5 M€ Cabling:0.5 M€ Commissioning:1.5 M€ Control-System1.1 M€ Safety P+A0.8 M€ Front-Ends:0.5 M€ Sum [€]19.0 M€ Sum [$]23.3 M$ 10%25.6 M$ Machine:25.6 M$ 4 Beamlines upgrade: 8.7 M$ Guesthouse+ 1.3 M$ Sum 35.6 M$

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Project-Development

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Operational-Cost-Development Power: Based on 4000 h operation time, 1GWh / y Salary: Increase employees

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Organization Design/Mechanics Maher S. Thaer Akrum Mohammad Ahmad Open position 2012 N.N. Machine-Physics Maher A. Open position Cooling/Vacuum Firas Osama Adel Saed Beamlines XABS:Messaoud IR: Ibraheem Open Position 2012 Computing Salman Mustafa Control Zia Ibrahim Open position 2012 Radiation-Safety Adli Morteza Electronics/Electric Sofian (Power supplies) Ifikhar (pulsed PS) Yazeed (beam lines) Farouq (beam-lines) Open position (Electric) RF/Diagnostics Darweesh Nashat (RF) Alaa (RF) Hussain (D) Administration Majeda (Purchasing) Sonia (Assistant) Ayman (Human resources) Ibrahim (Accountant) Abd Al (Bus-driver) General-Director: Directorate: Yasser (Administrative), Erhard (Technical), Hafeez (Scientific)

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Responsibility of technical sector for beamlines? Strategic Plan: 2.2 Project organization The task of the Technical Sector is to design, build and operate the machine from the microtron to the front ends. The shielding wall between the storage ring and the experimental hall is the border line that separates what falls within the responsibility of the Technical Sector and what lies with the Scientific Sector. Nevertheless, though the installation of beamlines would normally be within the purview of the Scientific Sector it has been decided that provisionally the technical team will be in charge of this due to the lack of staff in the Scientific Sector. Beamlines will be built individually in coordination with the corresponding beamline scientists.

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Mechanical Workshop to be built up Need for doing basic mechanical work! Need mechanical craftsman! Job request for mechanical craftsman on SESAME-web. Built up of a mechanical workshop: machines for sawing, drilling, cutting, milling. Short term alternative: Workshop at universities or private companies (few available) Establish regular contact to these external workshops

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Training IAEA, LOUNDSBURY, ALBA, SOLEIL, JSR, … Training abroad at Synchrotron-Radiation-facility:1-9 month IAEA ( ) : Total: 35 trainee 114 months At SESAME: 6 15 months Problem: Participant leaves SESAME Trainee is needed for work at SESAME (now) Change of concept: More Training at SESAME with SESAME (Microtron / Booster) Invite experts to SESAME for training (Reach the complete team) Limit stay at foreign labs to 1 month (Technical sector) Training is a center point of the SESAME Concept for capacity building

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Response to TAC Recommendations Management Schedule revision (Control system) staffing Initiated tendering process Budget revision In kind distribution Palestine Booster Sextupole component booster ramping Estimate alignment error Energy spread Booster injection Cabling Grounding, cross-talk, noise Vacuum chamber fixation Safety Shutter booster storage-ring Rails on shielding wall SR-Magnets SR magnets field quality Installation dipole Clear up Old cable trays Dissolve Free zone Cleaning AOB Front-end design IR front-end radiation shielding cooled first mirror?

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Crane ‘Blue’ Girders had been damaged due to miss-alignment. Repaired: Damaged parts exchanged, girders aligned. Power feeds damaged during installation of air ducts. Repaired. ‘Yellow’ Girder found to be damaged at one end. The crane is an essential tool, which has to work reliable and safe!! We must have an maintenance contract with a firm specialized on crane in duty for repair and inspection, warranty its safe operation!

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Microtron in Operation, Beam in the transfer line Achieved: Energy: 22MeV Pulse-Width:2 µs Pulse-Current:2 mA More: Maher Attal

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Microtron-Next Steps Replace main Power-supply! In progress. Replace gun positioning (motor-drives). Replace Magnetron-Modulator? Modify fluorescent Screen to allow Quadrupole scan (determine emittance) Replace Microtron? Bessy II-Microtron? New racetrack-Micrtron? LINAC? Prof. Dr. Andreas Jankowiak:…In diesem Sinne ist das Mikrotron zur Zeit noch unser „HotSpare“ und wird es auch noch für einige Zeit sein. Eine endgültige Außerbetriebnahme werden wir wohl erst 2014 in Betracht ziehen.

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Pulsed-Magnets Keep Magnets Replace Power-Supplies Buy charging unit Build switch in cooperation with SOLEIL

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Injection Septum Electro-Static Septum U = E g/r Voltage:110 kV Gap:0.01 m Radius:2.00 m C:30 pF T (half sine)250 µs New magnetic septum (50 MeV) ? BESSY II Microtron, LINAC More Ifikhar Abid

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Injection-Kicker Injection Kicker Magnetic Field0.0017T Length0.3m Current200A Kick (22 MeV ~ Tm)7mrad Needed kick strength4mrad Needed Current (50 MeV)280A Pulse-length (half sine)4µs More Ifikhar Abid

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Booster-Optics Energy GeV circumference38.4m emittance170nmrad alpha0.18 Energy loss14keV tune2.2 / 1.3 Chromaticity-2.0 / -0.5 Periodicity6 More Maher Attal

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Booster-Magnets Quadrupole Gradient5.77T/m Length0.25m Bore-78mm Current146A No windings4 x 24 Resistance0.054 Inductance6.8µH Dipole B-field1T Radius2.67m Gap40mm Current1000A No windings2x16 Resistance0.015 Inductance8.6µH

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, RF Acceptance 2 kW in 3 MΩ (Doris-cavity) 100 kV 3 kV0.3 % 10 kV0.5 % 20 kV0.7 %

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Task-List Booster Layout of cable trays, purchasing of cable trays, cabling Alignment of magnets Installation of vacuum chamber Grounding Installation of Booster-RF Layout of pulsed magnets PS, purchasing/built up Layout of Booster corrector PS, purchasing Set up of PLC-controller (vacuum, magnets) Set up of ramped Power-supply control-system (EPICS+ Ethernet Interface) Set up of corrector Power-supply control-system (EPICS+ Ethernet Interface) Set up of Booster-RF-PLC-Controller Set up of timing system

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Grounding ANKA Steel pillars connected to floor grid Ground-copper-strip Bus-bar 3 x 400 V No grounding (concept) at SESAME, to be defined!

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Ramping-Curve Specification: 340 V, 1040 A Square function for Voltage No smoothing at injection/extraction No smoothing, Injection No Smoothing extraction Proposed ramping More Sofian

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Booster-Sextupole-Components Calculation with FEMM (FEA) and ‘real’ vacuum chamber 10 Hz / 0.3 mm / sin: 1.6 1/m 3 1 Hz / 1-2 mm / sin : 0.9 1/m 3 Square voltage: x 10 Smoothed:x 2

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Booster-Correctors Ordered Power supplies: 12 units: 1.5 A 30 V ???? To be renegotiated with BRUKER Number of Units: 6 Turns: 18/36/18 Resistance: 0.3 Ω Current for 1 mrad kick: 6 A Aturns for 1 mrad kick: 6600 A Turns ? More Sofian Javar

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Radiation-Safety Purchasing of Radiation Monitors in progress 5 movable +2 portable stations: Gamma: 10 nSv/h – 1 Sv/h 30 keV -10 MeV Neutrons: 10 nSv/h – 0.1 Sv/h 25 meV – 100 MeV Request for Tender in preparation for interlock system based on Safety PLC Rules: Keep radiation level < 1 mSv / y (2000 h) 0.5 µSv/h More talk MortezaMansour Offline-Monitoring (TLT) local provider with coarse monitoring

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Girder Design ready Modified ALBA design Achieved tolerances at ALBA: Flatness: 25 µm Position: 50 µm Needed Tolerances??50 µm? In kind contribution from Pakistan? 6 feeds 3 struts used for transverse and longitudinal adjustment 3 jacks used for vertical adjustment and clamping Additional 3 vertical jacks used for clamping Additional clamping Total weight: ALBA: 7 t, SESAME:? Calculated Eigen frequency: ALBA: 50 Hz SESAME: 25Hz More Maher Shehab

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Alignment Main Tools: Auto-Level: 1 mm / 1km? Total Station: 0.5’’, 0.6 mm To be purchased: Measuring-arm or Laser-trecker? 50 µm. Alignment Booster: Measuring done by SESAME staff with Total-Station / Auto-Level Evaluation done at SOLEIL expert (SOLEIL) Comparison of first campaign and present

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Storagering Magnets More Maher Shehab

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, SESAME-CERN-Management EU provides 5M € to CERN for material CERN provides manpower SESAME has done design CERN has optimized design (3d) CERN writes specification 1 ) SESAME releases specification CERN decides 1 ) SESAME contracts CERN follows up manufacturing CERN/SESAME do measuring CERN subcontracts PS to SESAME SESAME does complete purchasing 1 ) In mutual agreement with SESAME More Attilio Milanese

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Constrains from Optics Multipoles: Dipole:dB/B < mm Quadrupole:dB/B < mm RMS Orbit distortion due to alignment error dipoleqf dxdB/Bdy dφdφ dxdy mm0.2 mrad0.2 mm mm4.5 mm1.8 mm2.8 mm2.1 mm More Maher Attal qf: db/dB = 10-4 qf: db/dB = 10-3

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Storagering-Quadrupoles Hyperbolic part approximated by circular arc B6 component optimized for 0.8 or 2.5 GeV? Chamfer size as ANKA QP Gradient17T/m Length280mm Bore-diam.70mm Turns34 Current240A Conductor8.5x8.5,Ø4mm 2,mm Resistance45mmΩ More Attilio Milanes

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Storagering-Sextupoles SESAME: Select experienced manufacturer for complete magnet CERN:Separate production of lamination (EU) and joke (Middle East) Capacity building or qualification For core assembling: machined holes or using shoulders No machining no chamfer S = ½ B’’ = B/r 2 2d b9 = 12 3d ∫ b9 = 0 Gradient17T/m Length280mm Bore-diam.70mm Turns34 Current240A Conductor8.5x8.5,Ø4mm 2,mm Resistance45mmΩ More Attilio Milanese

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Storagering Power-Supplies No of magnets No in series Current [A] Voltage per magnet [V] U-PS [V] P-PS [kW] Dipole Quadrupole-H Quadrupole-V Sextupole-H Sextupole-V Corrector-H Corrector-V Skew-quad161

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Storagering-RF 2 donated ELETTRA-Cavity old test devices, bad brazing SOLEIL: 350 MHz RF Solid-State-Amplifier Collaboration SOLEIL-SESAME: Development of 70 kW 500 MHz tower 70kW / tower, 500 k€ Low Level Electronics: Collaboration with ALBA?

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, RF-Amplifier Foreseen: 70 kW solid state amplifier based on 650 W modules. Prototype developed by SOLEIL financed partly by SESAME. SOLEIL has licensed 500 MHz technology to BRUKER. Price BRUKER for SESAME? Number of units needed? Initial plan 4 x 140 kW Start with 2 old ELETTRA cavities (60 kW) Install 4 Cavities (ELETTRA, ALBA, KEKII?) 4 Towers 80 kW enough for Phase 1 and II. Allow expansion to more towers.

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Cavities No cavities P/cavity [kW] Max. current [mA] 2.5 GeV Max. current [mA] 2.2 GeV Touschek 2% coupl. [h] Gas 2 nbar [h]

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, 500 MHz Prototype-Module 0.65 kW module 10 kW test-stand More: Derweesh Foudeh 50 V Powersupply

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Diagnostics BPM Electronics: 6 ITECH Electrons purchased for booster (6k€) Option for SR Electron a same price Purchasing? Current Monitors In purchasing process from BERGOZ: 1 DCCT for booster 1 DCCT for storage-ring 3 FCT for transfer-lines To de done: Layout/Design: Fluorescent-Monitors Tune-Monitor Synchrotron-Radiation-Monitor Scraper More:Hussein Al-Mahammad

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Vacuum Design ready, no change since 2010 Some smaller parts (transitions) missingBegin 2013 Specification to be writtenBegin 2013 More Firas Makhaleh

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Cooling Plant Built-up: Chiller / Compressor2200 kW 10° water Heat Exchanger1940 kW 20° demineralized Water Load:Therm.Electr. RF:640 kW 640 kW SR-Magnets600 kW 600 kW Air conditioning300 kW 80 kW ANKA More:Firas Makhaleh Status: Chillers, Compressor installed Pumps Heat exchanger installed Piping for Booster installed Air conditioning installed Next: Storage ring-Piping Layout to be done (Firas)Mid 2013 Specification writtenEnd 2013

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Control-System-Concept Control-Panel Manager Field-controller (ADC/DAC)Devices EDMEPICS PLC+ADC/DAC / DIA / MCValves/FSC/PS Microtron EDMEPICSEmbedded server ITCH-Electron EDMEPICSvirtual server(ADC/DAC/Power supplies) Gauges EDM / CSSEPICS VME+ADC/DAC / DIO / MCDevices Do we need VME? Expensive! Fast! Outdated when fast not needed! A: analog D:digital C: controller M: Motion CSS: Controlsystem Studio EPICS: Exp.Phys.Ind.Cont. Sys. EDM: Editor Display Manager PS: Power-supplies

SESAME, TAC 2012, 9/10.Nov.2012, Erhard Huttel, Control-System Problem is the lack of knowledge when people leave SESAME. ICALEPCS 2011: Saed Abu Ghannam spent one month at CLS, attended the PCaPAC 2010 workshop then spent two months at SLS, one week at SOLEIL and visited IRFU. He was trained in EPICS and discovered the different aspects of a synchrotron radiation facility. He left SESAME To be done general: Cooperation with Computing Concept (VME?) Back up Documentation Logging Data-base To be done next: PLC Booster vac.-/mag. interlock PLC RF-interlock Done: Control by PLC: Microtron, Transferline 1 (Valves, Screen, PS) Set up of (virtual) Servers. Graphical interfaces (EDM) Serial connection to EPICS Timing System VME running